The name of this bidding project is Shandong Development Investment (Dongming) 50MW Wind Power Project Engineering General Contracting (EPC) Project,The tenderer is Shandong Green Energy Investment Co., Ltd.,Project unit Dongming Green New Energy Co., Ltd. (contract signing party),The source of funds is self-raised funds。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1Project Overview、Bidding scope and bid section (package) division:

2.1.1 Project Overview:

Shandong Green Energy Dongming 50MW wind power project is located in Xiaojing Town, Dongming County, Heze City, Shandong Province、Matou Town、Within Sanchun Market Town。Wind turbines are scattered throughout the project site,Altitude between 60m and 65m。Planned development capacity 150MW,This phase of the project is 50MW。This project plans to install 13 units 3.85MW wind turbine,It is planned to build a 220kV booster station,Voltage level is 220/35kV。

2.1.2 Bidding scope and bid section (package) division:

This project is divided into 1 bidding section.

Tender scope:

Shandong Development Investment (Dongming) 50MW wind power project survey and design、Purchasing、Construction general contracting project,Mainly including but not limited to:

(1) Equipment procurement scope: wind turbine generator set、Tower (including tower bolts、Anchor bolts and other supporting tools) shall be purchased by the contractor through bidding,Perform contract transfer,Incorporated into the management scope of EPC general contractor;The EPC general contractor is responsible for all other equipment and materials required for the installation of this project,Including but not limited to: box-type transformer、cable、Collector lines and main transformers in booster stations、Power distribution device (including 220kV、35kV、400V)、Reactive power compensation、Grounding transformer, station transformer and grounding resistance device、Construction transformer、seabet betting platformElectrical seabet clubsecondary equipment (including comprehensive automation、Network-related equipment、Communication Equipment、Primary frequency modulation equipment、DC and uninterruptible power supply system equipment, etc.)、All software and hardware equipment including wind power prediction equipment、Firefighting facilities and corresponding technical services,Various equipment, materials and services that meet the technical requirements of smart wind farms in the bidding documents,And supervision of equipment within the procurement scope、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard)、Acceptance of goods、Warehousing, etc.。

(2) Survey and design scope: All survey and design of this project,Including but not limited to: 1:2000 topographic map survey (including booster station、Wind turbine platform and foundation、1:500 topographic map measurement of complex roads inside and outside the site)、Geological Survey、Hydrometeorology、Micro site selection、Equipment Technical Specification、Preparation of as-built drawings、Preparation of as-built drawings;Compilation of special articles on safety facility design and occupational hygiene design;Conduct technical briefing on construction drawings、On-site engineering service work,Contains 220KV delivery project、Opposite station reconstruction、Secondary equipment and communications。The bidder must design in accordance with the relevant regulations on wind farm construction of Shandong Green Energy Investment Co., Ltd. and meet the requirements。

(3) Construction scope: road engineering of this project (including approach road、Roads within the venue、Inbound road,Including new roads and renovation of old roads、Fixed)、Wind turbine foundation project、Wind turbine platform fence、Installation, commissioning and commissioning of all electrical equipment (including fans、Tower)、Wind power forecast、35kV collector line construction project、220kV transmission line construction project、Counter station civil reconstruction and electrical capacity expansion and reconstruction project、New construction and installation project of 1 220kV booster station (to meet the centralized control requirements of green energy companies)、The crossing (crossing) involved in the transportation of large equipment、Relocation line、Demolition、Reinforcement、Coordination, etc.,Fire protection engineering、Grounding works and ancillary works、On-site production、Construction of daily communication line and water and power supply (surrounding ecological environment protection during the process、Protection and management of domestic water sources、Water Conservation、Environmental protection measures guarantee)、Test pile、Pile foundation inspection、Finished product care、The booster station and surrounding greening project after the completion of the project、Green vegetation restoration project、Environmental Protection Project、Soil and water conservation project (meeting relevant requirements for approval and acceptance),Domestic water and electricity、Coordination and cooperation in land acquisition, construction coordination and various coordination in the process、Acceptance (including files、Environmental protection、Water Conservation、Complete acceptance of fire protection, etc.),And finally deliver the whole process contracting of grid-connected power generation in accordance with the requirements of the contractor。

(4) Procedure scope:

①The whole construction period of the project and the long-term leased forest land、Land、Grassland、Demolition、Relocation of above-ground and underground lines、Cemetery、Compensation (such as young crops compensation、Forest land compensation、Production reduction compensation, etc.)、Reclamation fee、Coordination、All fees and procedures involved in surface attachments (land transfer fee、Excluding farmland occupation tax and land use tax)。Including construction period and long-term expropriation、seabet betting platformLease seabet online casinocoordination fee,Excluding land transfer fee、All costs involved in land acquisition except farmland occupation tax and land use tax。

② Various procedures from the early stage of the project to the project commissioning and operation (such as: planning、Land、Woodland、Construction Permit,Real estate certificate, etc.,Including outgoing line compliance procedures),Relocation line、Meteorology (Lightning Protection)、Energy saving、Firefighting、Quality Supervision、Grid connection、Environmental Impact Assessment、Special acceptance and procedures for water conservation and other tasks (obtain relevant documents),And bear the expenses。

③Technical services related to this project,If designed to cooperate、Micro-site selection review、Factory training、On-site training、Equipment debugging、Unit trial operation、Warranty services for towers and other electrical equipment, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electric secondary security protection evaluation、Test、Grid-connected trial operation、Elimination、Acceptance,Handle all construction and safety risks related to the project、Third party liability insurance。Complete acceptance and project handover、Related work on the acceptance of archive materials,And all work related to general contracting projects。

(5) Production preparation scope: necessary production tools required for site operation and maintenance、Instrumentation、Insulated tools、Grounding wire facilities (including office and living facilities)、Identification signs, identification signs and various production preparations。

(6) This bidding does not include project supervision.

(7) Quality of the contractor’s general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

(8) All income from the electricity sales of this project belongs to Party A.

(9) This project is a “turnkey” project,Procedures encountered during project construction、Coordination、Payment、Work、Acceptance, etc.,Unless the contract clearly stipulates that Party A is responsible,Regardless of whether it is included in the bidding bill of quantities,All belong to the scope of work of Party B。

(10) If the bidder cannot respond to all the requirements of the bidding documents,Differences should be clearly stated in a separate document,Otherwise, regardless of whether the content of the bidding document is consistent with the requirements of the bidding document,The bidder shall be deemed to have responded to all requirements of the bidding documents。

The warranty period of this project shall comply with relevant national regulations (the warranty period of the complete fan is 5 years)。

See Chapter 5 for details.

2.2 Project construction period: It is tentatively scheduled that all civil construction parts will be completed before August 31, 2022,Full capacity grid connection by the end of October 2022。

Start time: March 20, 2022 (the specific construction period shall be subject to the start date issued by the contractor)。

2.3according to country、Shandong Province、Dongming County local government epidemic prevention control system and requirements,The bidding unit needs to investigate the control requirements of the project location,Develop a special "Epidemic Prevention and Control System for the Whole Process of Construction",Guarantee projects continue to advance steadily in accordance with national epidemic prevention requirements。

3. Bidding conditions

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) The bidder should have the first-level qualification for general contracting of power engineering construction and also have the following qualifications:

a) Engineering design comprehensive qualification Class A;

b) Class A comprehensive engineering survey qualification. 

(3) The bidder must have and provide effective quality、Environment、Occupational Health and Safety Management System Certification Certificate。

[2]Performance requirements: Bidders should have cumulative completion of at least 2 EPC general contracting performance of wind power projects of 48MW and above since January 1, 2018。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of project completion should be one of the following certificates: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion acceptance report。

【3】Financial requirements provide financial statements issued by an audit institution or certified public accounting firm from 2018 to 2020;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2018-2020 audit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by audit institutions or certified public accounting firms since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: Bidder’s social credibility self-examination commitment from January 1, 2018 to present (stamped with company seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major)。

(2) The proposed project manager must have the performance of at least one EPC general contracting project manager for wind farms of 48MW and above,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Project Manager、Completion/operation time and unit name)。At the same time, the social security certificate of the project manager who has worked for the bidding unit for the past one year must be provided。

[6]Qualification requirements for design leaders:

(1) The bidder must provide a valid survey and design registration practice certificate of the proposed design person in charge。

(2) The design person in charge must have at least 2 working experiences as the design person in charge of EPC general contracting projects for wind farms of seabet login48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the design,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Design person in charge、Completion/operation time and unit name)。

[7] Qualification requirements for construction leaders:

(1) The bidder must provide the proposed construction leader’s valid first-class registered construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major)。

(2) The construction leader must have at least 2 experiences as the construction seabet online casinoleader of wind farms of seabet login48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Construction manager、Completion/operation time and unit name)。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1 Time: 09:00 on January 22, 2022 to 17:00 on January 26, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding project completion certification materials ④ Financial status statement ⑤ Bidder's credibility self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a person subject to execution for dishonesty ⑥ Personnel qualification certificate and relevant supporting materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After successful sending, call the agency for review and confirmation

4.2 Bidding document price: 750 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

5.1 Submission of bid documents

Time: 09:30 on February 14, 2022 (Beijing time);

Location: Conference Room on the Second Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on February 14, 2022 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (//www.sdfztz.com/)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Tenderer contact person: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share