seabet mobile
seabet live casino
seabet online casino

seabet online sports betting

seabet app


1. Project Introduction

Tenderer: Shanfa (Zhucheng) Environmental Protection Energy Co., Ltd.

Project name: Shanfa Longcheng Vein Industrial Park Sludge Resource Disposal Project Full Process Consultation

Project number: 0627-2120431552

2. Basic situation

1、Project Overview: The project’s design disposal capacity is 1,200 tons of sludge seabet myper day,Occupy seabet online sports betting75.37 acres,Proposed to build 2×35t/h medium temperature and medium pressure sludge combustion fluidized bed boiler,Equipped with turbine generator set and other supporting equipment、Facility、Building (structure)、Living and office facilities, etc.。

2、Tender scope: The whole process management is divided into "project management"、"Construction Supervision"、Three parts of "cost consultation"。This project is not subcontracted。

3. Release of tender announcement

July 21, 2022 to July 26, 2022。

4. Bid opening

August 12, 2022 09:30

5. Bid opening

August 16, 2022 to August 18, 2022。

6. List of winning bidders

seabet my

Name of winning bidder

1

Shandong Chengxin Engineering Construction Supervision Co., Ltd.






Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share