Shandong Development Investment (Jingtai) Area B 200,000 kilowatt photovoltaic seabet my PC construction general contracting seabet my bidding announcement

Category: Notices and Announcements Release Time: 2023-03-14 Number of Viewers:0 Share


1. seabet my conditions

The name of this bidding seabet my is Shandong Development Investment (Jingtai) Area B 200,000 kilowatt photovoltaic seabet my PC construction general contracting seabet my,The tenderer is Shandong Green Energy Investment Co., Ltd.,The contract was signed by Baiyin Jingtai Longlu Development New Energy Co., Ltd.,The source of funds is self-raised funds,The bidding agency is Shandong Tendering Co., Ltd.。This seabet my has met the bidding conditions,Now open bidding for this seabet my。

2. seabet my Overview and Bidding Scope

2.1Project Overview、seabet my scope and bid section (package) division:

2.1.1 seabet my Overview:

Shandong Development Investment (Jingtai) Area B 200,000 photovoltaic seabet my includes two photovoltaic fields of 150MW in Sitanbei and 50MW in Duanjiajing。The seabet my is located in Sitan Township and Shangshawo Town, Jingtai County, Baiyin City, Gansu Province。Temple Beach North、Duanjiajing built a 110kV booster station,The booster station is located in the Sitan North Photovoltaic Field Area,The Duanjiajing seabet my is connected to the newly built Sitan North 110kV booster station through 2 circuits of 35kV collector lines,Connected to Jingtai South 330kV booster station through a 110kV line。

2.1.2 seabet my scope and seabet my section (package) division:

This bidding is divided into two bids,The first bid section is Sitan North 150MW photovoltaic seabet my + Sitan North 110kV booster station;The second bidding section is the Duanjiajing 50MW photovoltaic seabet my +35kV collector line。

Both bidding sections of this seabet my were bid but neither was successful.

Tender scope:

Shandong Development Investment (Jingtai) Area B 200,000 kilowatt photovoltaic seabet my PC construction general contracting seabet my scope,Mainly including but not limited to:

(1) Equipment procurement scope: The equipment and material procurement scope includes but is not limited to the following: all equipment that meets the installed capacity of this seabet my、Secondary equipment。Also includes corresponding spare parts、Special tools、Instruments, etc.,All equipment and services must meet the technical requirements of smart power stations in the bidding documents。Specific requirements shall be implemented in accordance with the technical specifications of the design institute,The equipment purchased by the bidder must ensure that it meets the requirements of local power grid access。

Photovoltaic modules are purchased by Party A,The rest of the equipment will be purchased by Party B。Main variable、Switch cabinet、Reactive power compensation、Ground change、Photovoltaic bracket、Inverter、Box transformer、cable、The ring main unit is purchased by the bidder in the short list of bidders,Please see the attachment to the seabet my document for the specific list。

Other production schedules including the above equipment、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard,Reverse the delivery location in the photovoltaic module contract to the seabet my site)、Acceptance of goods、Warehousing, etc.,The bidder is responsible for equipment relocation and storage site coordination and expenses caused by any reason。

The tenderer is responsible for the supervision of major equipment,The bidder’s supervision does not relieve the bidder from its responsibility for the supervision and quality control of the purchased equipment。The bidder is responsible for the supervision and inspection of equipment except A control equipment。Out of consideration for purchasing quality,The tenderer has the right to purchase equipment within the scope of the tender、Exercise supervision and decision-making rights over the process and results of service and professional engineering procurement。The tenderer has the right to control all equipment within the bidding scope based on the progress of the seabet my。

(2) seabet my scope:

Civil construction that meets the grid-connected operation and acceptance of the seabet my、Electrical installation、Debug、Connected to the grid、Trial run,Acceptance and defect elimination at each stage of the seabet my,Environmental protection、Security、Occupational health and other “three simultaneous” related work,Special acceptance of each seabet my,Personnel training and final delivery operations,Quality warranty service during the warranty period,Cooperate with settlement、Completion final accounts audit and all related work。Specifically include but are not limited to the following:

①Civil engineering: various equipment foundations for booster stations and photovoltaic fields、Buildings、Photovoltaic bracket、Wall Fence、Indoor and outdoor equipment、seabet my Greening、Various ancillary facilities projects、Construction and demolition of temporary buildings、Renovation of roads damaged by construction and restoration of vegetation in construction areas、Construction of on-site production and living communication lines and water and power supply (surrounding ecological environment protection during the process、Domestic water source protection and management、Water Conservation、Environmental protection measures guarantee)、Finished product care、Reclamation seabet my (reclamation deposit shall be paid by the contractor、Refund)、Environmental protection projects and soil and water conservation projects (meet the relevant requirements for approval and acceptance)。

②Electrical installation seabet my (meeting power grid and preliminary design requirements): installation of all primary and secondary equipment、Debug,Including primary and secondary equipment of booster station、Photovoltaic module installation、Inverter installation、Grounding system、Video surveillance system engineering、Centralized control system、Collection line engineering、Firefighting system、Protection system、Metering system、Power Grid Access System Engineering、All devices mentioned in the access system report approval、Material、Materials and equipment in preliminary design、All equipment debugging and unit testing、Overall system debugging、Complete system performance test after grid connection、All equipment signage projects and all electrical equipment installation related work。

③According to the national and green energy company quality acceptance management system,Complete key node acceptance、Phase acceptance and defect elimination work。

④seabet my completion handover and personnel training、Warranty work within the warranty period。

⑤Complete archives that meet the requirements of the seabet my unit’s archives management system,And complete the filing and transfer as required on schedule。

⑥Others not specified but belong to the construction of this seabet my、Trial run、Acceptance、Transfer、Warranty service within the warranty period、Related work such as settlement auditing。All projects before seabet my handover、The equipment will be kept and cared for by the winning bidder,Any damage、If lost, the winning bidder will be responsible for repair or replacement,And bear the corresponding expenses。

(3) Scope of procedures:

①、Complete all procedures required for the seabet my,Including but not limited to: responsible for handling the procedures for temporary land use for on-site construction and temporary land use at the site、Compensation costs for demolition of above-ground and underground attachments、Procedures for collecting lines and communication lines,Processing procedures for highway openings and crossings, Procedures for crossing power and communication lines;Civil Coordination of Approach Roads;Power grid company procedures;The bidder is solely responsible for local coordination during the construction process (not limited to coordination of work interruptions caused by any reason、Local government coordination, etc.)、Facility restoration and other work after construction。

②、Processing of various procedures from the early stage of the seabet my to the seabet my commissioning and operation: real estate certificate、Construction Land Planning Permit、seabet my Planning Permit、Administrative license for crossing (drilling and crossing)、Quality Supervision、Connected to the grid、Environmental Impact Assessment、Water Conservation、Fire protection and other special acceptance and procedures (obtain relevant documents),And bear the expenses。

③、Technical services related to this seabet my,If designed to cooperate、Site selection review、Factory training、On-site training、Device debugging、Unit trial operation and other electrical equipment warranty services, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electricity secondary security protection evaluation、Test、Grid-connected trial operation、Elimination、Acceptance,Handling all construction and safety risks related to the seabet my、Third party liability insurance。Complete acceptance and seabet my handover、Related work on the acceptance of archive materials,And all work related to general contracting projects。

(4) Tools:

Party B is responsible for purchasing the production operation and maintenance tools necessary for equipment operation and maintenance,Subject to Party A’s final approval。

(5) This bidding does not include seabet my supervision services、Survey and design services。

(6) Production preparation scope: necessary production tools required for site operation and maintenance、Instrumentation、Insulated tools、Grounding wire facilities and various production preparations。

(7) Quality of the contractor’s general contracting seabet my、Security、Construction period、Be fully responsible for cost and environmental protection。

The warranty period of this seabet my shall comply with relevant national regulations.

2.2 seabet my construction period: Construction start time is April 8, 2023 (subject to the start date issued by the contractor),Meet grid connection conditions on September 30, 2023。

3. Bidder qualification requirements

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) The bidder should have both abce or the qualifications specified by de:

a) Class A comprehensive engineering design qualification;

b) Engineering survey comprehensive qualification Class A;

c) Qualification level two or above for general contracting of power engineering seabet my;

d) The bidder should have the first-level or above general contracting qualification for power seabet my construction issued by the construction administrative department and the installation (repair) qualification issued by the National Energy Administration、Trial) Level 1 Electric Power Facilities License。

e) Valid production safety license.

[2] Performance requirements: The bidder should have 2 PC general contracting or EPC general contracting performance of photovoltaic projects with a scale of more than 200,000 kilowatts since January 1, 2018 (the time shall be subject to the completion acceptance time) )。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding seabet my completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of seabet my completion should be one of the following: State Electricity Regulatory Commission document、seabet my Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion Acceptance Report。

[3] Financial requirements provide financial statements issued by an audit institution or certified public accounting firm from 2019 to 2021;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2019-2021 audit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2020 to the present (stamped with the company’s official seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering seabet my projects in accordance with laws and regulations。

[5]Qualification requirements for seabet my managers:

(1) The bidder must provide the proposed seabet my manager’s valid registered first-class construction engineer qualification certificate (mechanical and electrical engineering major)、Valid Class B safety production assessment certificate and senior engineer title。

(2) The proposed seabet my manager must have the performance of at least one PC general contracting or EPC general contracting seabet my manager for photovoltaic projects of 30MW and above,The bidder must provide supporting documents proving the performance of the seabet my manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the seabet my、seabet my Manager、Completion/commissioning time and unit name)。At the same time, the social security certificate of the seabet my manager who has worked for the bidding unit for the past one year must be provided。

[6] Qualification requirements for seabet my leaders:

(1) The bidder must provide the proposed seabet my responsible person with a valid first-class registered seabet my engineer qualification certificate (seabet my engineering or mechanical and electrical engineering major) and a valid Class B safety production assessment certificate。

(2) The construction leader must have at least 2 experiences as the construction leader of photovoltaic projects of 30MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the seabet my、Construction manager、Completion/commissioning time and unit name)。

[7] seabet my management organization and personnel: The bidder must provide the valid "Safety Management Personnel Qualification Certificate" C certificate of the proposed safety person in charge。

[8] Requirements for purchasing goods: The contractor’s subcontracting procurement seabet my method and scoring standards are required to be consistent with the PC general contracting seabet my methods and scoring standards,The subcontracting seabet my plan must be reviewed and approved by the contractor。The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other。

3.2 This seabet my does not accept consortium bids.

4. Obtaining seabet my documents

4.1 Time: 09:00 on March 15, 2023 to 17:00 on March 19, 2023,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding seabet my completion certification materials ④ Financial status statement ⑤ Bidder's credibility self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person subject to execution ⑥ Personnel qualification certificate and relevant supporting materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After sending successfully, call the agency for review and confirmation

4.2 seabet my document price: 750 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3Potential bidders who have not obtained the seabet my documents in accordance with the requirements of this announcement shall not participate in the seabet my。

5. Submission of bid documents

Submission deadline: 09:00 on April 4, 2023 (Beijing time);

Submission method: Conference Room on the Second Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:00 on April 4, 2023 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This seabet my announcement is also on the China seabet my and seabet my Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Mr. Zhou

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Min

Agent contact number: 0531-81917677、15726160669

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd. Copyright 2019 All rights reserved Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province

Share