The name of this bidding project is Shandong Development Investment (Jingtai) Zone A 400,000 kilowatt wind power project construction general contracting (PC) project,The tenderer is Baiyin Jingtai Longlu Development New Energy Co., Ltd.,The source of funds is self-raised by the enterprise and loans,The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1 Project Overview

The supporting new energy base of "Long Power to Shandong" Shandong Development Baiyin Wind and Solar Energy Demonstration Project is located in Baiyin City, Gansu Province,Planned capacity is 3 million kilowatts,The overall project location is Tainan、Jingtai North、Development of four areas in Jingyuan and Pingchuan,Among them, the 1.1 million kilowatt new energy project in Jingtai South area includes a 500,000 kilowatt photovoltaic project and a 600,000 kilowatt wind power project。Shandong Development Investment (Jingtai) Zone A 600,000-kilowatt wind power project is part of the wind power project in the southern Jingtai area,Includes two wind power site areas,Xiatan 400,000 kilowatt project and Laohushan 200,000 kilowatt project respectively。

This bidding project is Shandong Development Investment (Jingtai) Zone A 400,000 kilowatt wind power project,The project is located about 30km south of Jingtai County,The specific location of the site is 103°52 East Longitude'2.97"~104°15'34.44", north latitude 36°48'33.20"~37°0'38.30"between,The altitude of the wind farm area is between 1740m and 2320m,The site area is mountainous terrain。There is S101 provincial road inside the wind farm、S217 Provincial Highway passes by,Convenient external transportation conditions。

The total installed capacity of this project is 400MW。This project plans to install 72 units 5.56MW wind turbine,Supporting installation of 72 box-type transformers,This project will build a new 110kV booster station,110kV booster station installs four 150MVA three-phase three-winding power transformers。In this phase, three 150MVA main transformers will be constructed and the installation position of one 150MVA main transformer will be reserved。This station is connected to the 110kV side of Jingtai South 330kV booster station with 2 110kV lines,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。110kV electrical main wiring: adopting the form of "one station and two stations",Set two 110kV power distribution devices with single busbar connections in the booster station;The 35kV side of the main transformer adopts single busbar wiring,Each transformer is equipped with a section of 35kV busbar on the 35kV side,35kV bus connected to the fan incoming line、Reactive power compensation、Energy storage、Station electricity, etc.;Each main transformer low-voltage side is equipped with one set of ±45MvarSVG reactive power compensation device for each 35kV busbar。

2.2 Bid segment (package) division

This project is divided into two bidding sections,Bidding Section 1: All machine positions in Lot 2 (28 units currently selected + 0 optional units) + 110kV booster station;Bidding Section 2: All camera positions in Lot 1,44 units in the main selection + 6 units in the alternative。Please see the wind farm layout plan (see attachment) for the specific location arrangement。Both bidding sections of this project were awarded but not both。

2.3 Bidding Scope:

Shandong Development Investment (Jingtai) Zone A 400,000 kilowatt wind power project construction general contracting (PC) project,Mainly including but not limited to:

(1) Equipment procurement scope: all equipment and materials that meet the installation requirements of this project (wind turbines、Tower、After the anchor bolts and other seabet casino reviewseabet betting platformmaterials are purchased through bidding and procurement by the contractor,Perform contract transfer,Included into the management scope of PC general contractor),Including but not limited to: box-type transformer、cable、Collector lines and main transformers in booster stations、Construction transformer、Power distribution device、Reactive power compensation、Switch cabinet、Electrical secondary equipment (including comprehensive automation、Network-related equipment expansion、All software and hardware equipment including booster station video surveillance and fire alarm system expansion, etc. and corresponding technical services,Various equipment, materials and services that meet the technical requirements of smart wind farms in the bidding documents,And supervision of equipment within the procurement scope、Urgent delivery、Transportation、Pick up、Unlucky shipment (including yard charges、Tower secondary transport freight and secondary transport insurance costs from the yard to the machine site)、Acceptance of goods (including third-party inspection required by specifications)、Warehousing, etc.。The contractor’s procurement scope for the winning bid section 2 does not include all equipment and accessories in the booster station。The booster station equipment area adopts prefabricated cabin structure,Requires cooperation with domestic experienced professional box-type integrated equipment manufacturers,Unified design and procurement (not split),See the attachment for the recommended short list of major equipment manufacturers purchased。

Because this project is divided into two bids,The above equipment must be purchased according to the short list of manufacturers recommended by the contractor,In order to ensure compatibility between various devices and facilitate later operation and maintenance,Contractors of the two bidding sections before recruiting and purchasing the above equipment,Must communicate with the contractor in detail,The contractor shall coordinate the contractor group meetings of the two bid sections to discuss procurement matters,After determining the purchasing plan,Contractors can purchase individually;Otherwise,It can be considered that the contractor does not respond to the requirements of the bidding documents,The employer has the right to terminate the contractual relationship with the contractor。In view of the above requirements,Bidders need to consider the actual situation comprehensively when bidding and quoting。

(2) Construction scope: road engineering of this project (including approach road、Roads within the venue、Inbound road,Including new roads and repairs of old roads)、Fan foundation and box transformer foundation project、Installation, commissioning and trial operation project of all equipment (including fans、Tower)、Wind power forecast、35kV collector line construction project (crossing,Including railway、Highway、National Highway、Provincial Road、County Road、Various situations such as rural roads and overhead lines)、New construction and installation project of a 110kV booster station、Spanning (crossing) involved in the transportation of large equipment,Including railway、Highway、National Highway、Provincial Road、County Road、Various situations such as rural roads and overhead lines)、Relocation line、Demolition、Coordination, etc.,Fire protection engineering、Grounding works and ancillary works、Construction of on-site communication projects and water and power supply (surrounding ecological environment protection during the process、Protection and management of domestic water sources、Water Conservation、Environmental protection measures guarantee)、Finished product care、Green vegetation restoration project after completion、Environmental Protection Project、Soil and water conservation project (meeting relevant requirements for approval and acceptance),Domestic water and electricity、Coordination of land acquisition and various coordination during construction、Acceptance (including files、Environmental protection、Water Conservation、Complete acceptance of fire protection, etc.),And finally deliver the whole process contracting of grid-connected power generation in accordance with the requirements of the contractor,That is, all related construction contents before the 110kV substation sends out the line。The construction scope of the contractor in Bid Section 2 does not include tasks such as building installation in the booster station and transportation of large equipment in the station。

When the 35kV overhead line in section 2 of the winning bid is constructed according to the design drawings to the last base 35kV line tower outside the 110kV booster station and completed grounding,After acceptance by the contractor and the supervision unit that the requirements are met, it will be handed over to the contractor of Section 1 to complete all remaining work from the iron tower to the booster station。Bidders of Bid Section 1 need to consider the related costs of this part when bidding and quoting,No further consideration after winning the bid。

The scope of this bidding does not include the 110kV transmission line project。The dividing point between the 110kV booster station and the outgoing line is the insulator string at the first outgoing portal frame line side hanging point in the booster station wall,This insulator string belongs to the scope of the contractor。110kV booster station inner door frame and jumpers、The relevant line protection system in the booster station belongs to the contractor's scope of work。System remote control、System communication、Secondary systems such as relay protection and automatic devices,Take the upper incoming terminal of the line optical cable terminal box wiring as the boundary,The installation and testing seabet myseabet ioof the outgoing line are within the scope of the contractor。Design of the secondary system on the booster station side within the incoming terminal (including optical cable terminal box)、Purchasing、Construction、Install、Debugging, etc. are within the scope of the contractor。

(3) Scope of procedures (including fees):

①The entire construction period of the project and the long-term leased forest land、Land、Demolition、Relocation of above-ground and underground lines、Cemetery、Greenhouse、Well、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation、Forest grassland vegetation restoration fees, etc.)、Lease fee、Reclamation project (reclamation deposit shall be paid by the contractor、Return)、Coordination、All fees and procedures involved in surface attachments (land transfer fee、 Excluding farmland occupation tax and land use tax)。The scope of land acquisition includes but is not limited to roads、Wind turbine platform and foundation、Collection circuit tower base and working surface、Approach Road、Temporary facilities, etc.。The long-term land lease term includes the construction period and operation period stipulated in the contract,The operation period is considered to be 20 years。

② Handling all procedures from the early stage of the project to the project put into operation: handling all procedures after the approval procedures are completed,That is, all procedures and relationship coordination other than the list of procedures that the contractor has already invited for bidding in the attachment (including but not limited to some procedures that need to be supplemented in the early stage but have not been tendered,And various procedures that need to be completed before and after the start of construction),Relocation line、Meteorology (Lightning Protection)、Energy saving、Survey and Boundary、Real Estate Certificate、Construction Land Planning Permit、Project Planning Permit、cross (drill over)、cross (drill over),Including railway、Highway、National Highway、Provincial Road、County Road、Various situations such as rural roads and overhead lines) administrative license、Quality Supervision、Electricity Business License、Electricity purchase and sale contract、Connected to the grid、Environmental Impact Assessment、Water Conservation、Fire protection and other special inspections and procedures (obtain relevant documents),And bear the expenses。See Appendix 14 for the preliminary procedures entrusted by the contractor,All other procedures shall be completed by the contractor。

Because this project is divided into two bids,for fast、Perform the above procedures efficiently,It is proposed that the contractor of Bid Section 1 take the lead in handling all the above procedures;When bidding and quoting,The bidder of Bid Section 1 needs to make an overall quotation based on the costs required to complete all procedures for the entire project,The bidder of Bid Section 2 does not need to consider the corresponding quotation for the formalities,However, the actual on-site work corresponding to the above procedures still needs to be completed by the contractors of each bid section (including but not limited to the construction and supervision of environmental protection projects、Construction and supervision of water conservation projects、Recruitment and procurement of testing units (including pile foundation testing)),And the contractor of Bid Section 1 is taking the lead in handling the procedures,When cooperation and acceptance need to be carried out on site,Bid Section 2 requires full cooperation free of charge;Otherwise,The contractor will conduct double assessments on uncooperative bidders based on breach of contract。

③Technical services related to this project,such as micro site selection review、Factory training、On-site training、Equipment debugging、Unit trial operation、Warranty services for towers and other electrical equipment, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electric secondary security protection evaluation、Test、Grid-connected trial operation、Elimination、Acceptance,Handle all construction and safety risks related to the project、Third party liability insurance。Complete acceptance and project handover、Related work on the acceptance of archive materials,And all work related to general contracting projects。

(4) Tools:

Party B is responsible for purchasing the production operation and maintenance tools necessary for equipment operation and maintenance、Spare parts,Subject to Party A’s final approval。The production preparation tools listed in the list of production preparation tools in Appendix 19 are all purchased from Bid Section 1,And bear the corresponding expenses。

(5) Other work scope: including but not limited to: all government coordination、Local relationship processing、Civil Coordination、External coordination and fee payment such as temporary and long-term land acquisition coordination,Equipment procurement for wind power projects、Material Procurement、Transportation and on-site storage management、Construction (including preliminary preparations for construction)、Debug、Complete Acceptance;Temporary and permanent land acquisition procedures and fees (except land transfer fee、All fees related to land acquisition except farmland occupation tax and land use tax) payment,Excluding preliminary bidding procedures;In all wind farms、Project construction in booster station;Approach Road、Temporary construction road on site、Construction and acceptance of permanent seabet betting platformmaintenance seabet loginroads;Installation and debugging of fans and ancillary equipment;Wind turbine generator、Send、Trial operation of substation system、The defect elimination and wind turbine successfully passed 240 hours of grid-connected commercial operation and completion acceptance;Path protocol for collector lines in the field、Construction and acceptance;Construction period engineering insurance;Processing procedures for project start;Processing land procedures;Road、Railway、river、Line、Communication、Following the procedures for crossing (crossing) underground obstacles;Soil and Water Conservation Supervision、Soil and Water Conservation Monitoring;Project acceptance;All special acceptance related to this project (including but not limited to: planning、Energy saving、Firefighting、Environmental protection、Water Conservation、File、Occupational disease hazards, etc.)、Safety and quality supervision inspection and acceptance、Electricity Business License、Electricity purchase and sale contract、Grid connection and related procedures、Power quality detection、Classification protection assessment and filing、Project data file organization、All work including transfer and special acceptance of files、Transfer and service during the warranty period,And meet the requirements of the contracting party to meet the standards and start production、Passed acceptance by the contractor。Also includes all necessary engineering deficiencies、Material、Spare parts、Special tools for production safety、Consumables and related technical information and personnel training,Various meetings during the construction period,Project data includes but is not limited to process data、Completion Information。

(6) This bidding does not include project supervision, survey and design.

(7) The contractor’s quality of the general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

(8) Procedures encountered during project construction、Coordination、Payment、Work、Acceptance, etc.,Unless the contract clearly stipulates that Party A is responsible,Regardless of whether it is included in the bidding bill of quantities,All belong to the scope of work of Party B。If the bidder cannot respond to all the requirements of the bidding documents,Discrepancies should be clearly stated in a separate document,Otherwise, regardless of whether the content of the bidding document is consistent with the requirements of the bidding document,It is deemed that the bidder has responded to all requirements of the bidding documents。

(9) The defect liability period of this project is 5 years for the complete fan、Main change 2 years,Others are 1 year。

For other details, please refer to the employer’s requirements.

2.4 project duration

The tentative start time is August 1, 2023 (the specific construction period is subject to the start date issued by the contractor),The first batch of grid connection time will be no later than the commissioning time of Shandong Development Investment (Jingtai) Luyang Town Fangcao Village 330kV substation project (December 20, 2023),The full-capacity grid connection time is tentatively scheduled for June 20, 2024,The tenderer can adjust the progress according to the time requirements of the State Grid for grid connection。

3. Bidding conditions

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) The bidder should have both abce or the qualifications specified by de:

a) Class A comprehensive engineering design qualification;

b) Engineering survey comprehensive qualification Class A;

c) Qualification level two or above for general contracting of power engineering construction;

d) The bidder should possess the first-level and above qualifications for general contracting of electric power engineering construction issued by the construction administrative department and the first-level license for electric power facility installation and testing issued by the National Energy Administration。

e) Valid production safety license.

[2] Performance requirements: From January 2020 to the present, bidders should have at least 2 PC or EPC general contracting performance for wind power projects with a single capacity of 100MW and above。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of project completion should be one of the following: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion Acceptance Report。

[3] Financial requirements: Good financial status,At least 3 consecutive annual financial statements from 2020 to 2022 are required,The bidder’s establishment time is less than the specified year,Financial status since establishment should be provided。

[4] Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2020 to the present (stamped with the company’s official seal、Customized format);When registering, bidders need to provide the website of the "China Execution Information Disclosure Network" on that day (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject Seabetseabet online sports bettingto execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (professional in construction engineering or mechanical and electrical engineering) and a valid Class B safety production assessment certificate。

(2) The proposed project manager must have at least the performance of a PC or EPC general contracting project manager for wind farms of 48MW and above,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Project Manager、Completion/commissioning time and unit name)。At the same time, the social security certificate of the project manager who has worked for the bidding unit for the past one year must be provided。

[6] Qualification requirements for construction leaders:

(1) The bidder must provide the proposed construction responsible person with a valid first-class registered construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major) and a valid Class B safety production assessment certificate。

(2) The construction leader must have at least 2 experiences as the construction leader of wind farms of 48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Construction manager、Completion/commissioning time and unit name)。

Other requirements: financial requirements, credibility requirements, etc.

[7] Project management organization and personnel: The bidder must provide the valid "Safety Management Personnel Qualification Certificate" C certificate of the proposed safety person in charge。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1 Time: 09:00 on July 6, 2023 to 17:00 on July 10, 2023,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding project completion certification materials ④ Financial status statement ⑤ Bidder's credibility self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a person subject to execution for dishonesty ⑥ Personnel qualification certificate and relevant supporting materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After successful sending, call the agency for review and confirmation。

4.2 Bidding document price: 750 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document expense account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on July 26, 2023 (Beijing time);

Submission method: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on July 26, 2023 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。

8.Contact information

Tenderer: Baiyin Jingtai Longlu Development New Energy Co., Ltd.

Tenderer’s address: No. 21, Beitan Village, Xiquan Town, Jingtai County, Baiyin City, Gansu Province

Contact person of the tenderer: Mr. Zhang

Tenderer’s contact number: 17616758749

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917501、15726160669

Agent email: sdzb1110@163.com