Baiyin Seabet Longlu Development New Energy Co., Ltd. Power Trading Agency Service Project Tender Announcement

Category: Notices and Announcements Release Time: 2024-01-31 Number of Viewers:0 Share


(Seabet number: 0627-24100160177)

1.Tender conditions

This Baiyin Seabet Longlu Development New Energy Co., Ltd. power trading agency service project is approved by the project approval/approval/recording authority,The source of project funds is self-raised funds,The tenderer is Baiyin Seabet Longlu Development New Energy Co., Ltd.,Contract signed by Baiyin Seabet Longlu Development New Energy Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Seabet Overview and Bidding Scope

2.1 Seabet Overview:

The total installed capacity of the 500,000 kilowatt phase 1 200,000 kilowatt photovoltaic project in Baiyin Seabet B Zone is 200MW (DC side 244MWp),Divided into two photovoltaic field areas: Sitanbei 150MW and Duanjiajing 50MW,The project is located in Sitan Township and Shangshawo Town, Seabet County,Newly build a 110kV booster station,The booster station is located in the Sitan North Photovoltaic Field Area,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Seabet through a 110kV line,Through the main transformer of Seabet South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of the 500,000 kilowatt second phase 200,000 kilowatt photovoltaic project in Baiyin Seabet B Zone B is 200MW (DC side 244MWp),The project is located in Luyang Town, Seabet County,Newly build a 110kV booster station,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Seabet through a 110kV line,Through the main transformer of Seabet South 330kV booster station, it is boosted and then connected to the power grid。

Baiyin Seabet Area B 500,000 kilowatt phase III 100,000 kilowatt photovoltaic project (DC side 122MWp),The project is located in Wufo Township, Seabet County,Newly build a 110kV booster station,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Seabet through a 110kV line,Through the main transformer of Seabet South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of Baiyin Seabet Zone A 400,000 kilowatt wind power project is 400MW,The project is located in Xiquan Town and Zhongquan Town, Seabet County,This project plans to install 72 units 5.56MW wind turbine,Supporting installation of 72 box-type transformers,Newly build a 110kV booster station,110kV booster station installs four 150MVA three-phase three-winding power transformers。In this phase, three 150MVA main transformers will be constructed and the installation position of one 150MVA main transformer will be reserved。Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Seabet through 2 110kV lines,Through the main transformer of Seabet South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of the 200,000-kilowatt wind power project in Baiyin Seabet Area F is 200MW,The project is located in Xiquan Town and Zhongquan Town, Seabet County,This project plans to install 36 units5.56MW wind turbine,Supporting installation of 36 box-type transformers,Connected to the 110kV booster station of Baiyin Seabet Area A 400,000 kilowatt wind power project through 35kV collector line,Sent out uniformly from the 110kV booster station of Baiyin Seabet Area A 400,000 kilowatt wind power project,Through the main transformer of Seabet South 330kV booster station, it is boosted and then connected to the power grid。

Baiyin Seabet South 110MW/440MWh independent energy storage power station project construction scale 110MW/440MWh independent energy storage power station,Battery uses lithium iron phosphate battery,The energy storage battery system and power conversion system are arranged in outdoor containers,A new 330kV booster station is built in the energy storage site,Install 1 120MWA (330kV/35kV) transformer,Newly build a 2km 330kV line,Connected to Seabet South 330kV booster station and then connected to the grid。

2.2 Bidding scope and division of bid sections (packages): This Seabet is divided into 1 bid section

Tender scope: 1.1 million kilowatts of new energy stations owned by Baiyin Seabet Longlu Development New Energy Co., Ltd. (including 600,000 kilowatts of wind power、Photovoltaic 500,000 kilowatts) and 110MW/440MWh independent energy storage power station power trading agency service,Mainly includes: Baiyin Seabet Area B 500,000 kilowatt phase 1 200,000 kilowatt photovoltaic power station、Baiyin Seabet Area B 500,000 kilowatt phase II 200,000 kilowatt photovoltaic power station、Baiyin Seabet Area B 500,000 kilowatt phase III 100,000 kilowatt photovoltaic power station、Baiyin Seabet Area A 400,000 kilowatt wind farm、Baiyin Seabet Area F 200,000 kilowatt wind farm、Baiyin Seabet South 110MW/440MWh independent energy storage power station three-year power trading agency service,The agency service provider needs to take into account the changes in power market policies in Gansu Province and the actual power generation situation of each project,According to Gansu Provincial Market Trading Rules, the agency station completed the three-year service period power trading work。

Energy agency service goal: the average settlement price of all on-grid electricity at each station from 2024 to 2026 shall not be lower than that of wind Seabet in the province、Photovoltaic、Average market price of energy storage projects of the same type,The final actual transaction situation shall be subject to the announcement on the Gansu Electric Seabet Trading Center platform。(excluding double-detailed assessment fees)

Note: The bidder shall quote the total bid price at the same time,You need to quote for each individual Seabet in this bidding section and set up a sub-item quotation list in the bidding document。

2.3 service cycle

Service period is 3 years,From March 1, 2024 to December 31, 2026。

3. Bidder qualification requirements

1.A unit or other organization where the bidder has independent legal personality registered in the People’s Republic of China,Also qualified for electricity trading or electricity sales business。

2.The bidder should have the qualification to sell electricity,And the amount of the guarantee paid at the Seabet Trading Center is not less than 25 million,And the authorized trading Seabet announced by the trading center is not less than 1.5 billion kWh。

3.The bidder should have a digital decision-making system for new energy station Seabet transactions,And can carry out Seabet prediction transaction auxiliary function。

4.Performance requirements: Have 2 or more domestic achievements in the past 2 years、Performance of a total of no less than 100MW new energy stations [Seabet trading agency] services/projects or similar services/projects。Provide relevant contract supporting documents (including cover page、Copy of signature page or user certificate, etc.,To prove that it meets the requirements of this tender。

5.Financial requirements: Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2020 to 2022 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If established less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

6.Credit requirements: The bidder’s commitment to self-examination of social credibility from January 1, 2021 to the present (stamped with the company’s official seal);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons subject to execution who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

7. This bidding does not accept consortium bids.

4. Obtaining bidding documents

Time: 09:00 on February 1, 2024 to 17:00 on February 05, 2024,(Beijing time,Except legal holidays)

Acquisition method: 4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this Seabet after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (just register and register,No need to apply for CA lock)。

4.2 Information required to obtain documents: ①Business license、Enterprise qualification certification materials ② Authorization letter of legal representative and ID card of the authorized person ③ Similar Seabet performance contract certification materials ④ Financial status statement ⑤ Bidder’s social credit self-examination commitment letter and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a dishonest person ⑥ Bidding document fee remittance voucher ⑦ Bidder information registration form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy of the original document or a copy of the official seal (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call (15069174047) to notify the agency for review and confirmation。

4.3 Bidding document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330

4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 14:00 on February 29, 2024;

Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 14:00 on February 29, 2024;

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8. Contact information

Tenderer: Baiyin Seabet Longlu Development New Energy Co., Ltd.

Tenderer’s address: 8th Floor, Office Building, Jinwo Kaidi Building, Chengxin Avenue, Baiyin District, Baiyin City, Gansu Province

Tenderer contact person: Manager Zhang

Tenderer’s contact number: 17616758749

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 15069174047、0531-81917677

Agent email: sdzb910@163.com





Shandong Development Investment Holding Group Co., Ltd. Copyright 2019 All rights reserved Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province

Share