(Project number: 0627-24100160177)

seabet sports betting

This Baiyin Jingtai Longlu Development New Energy Co., Ltd. power trading agency service project is approved by the project approval/approval/recording authority,The source of project funds is self-raised funds,The tenderer is Baiyin Jingtai Longlu Development New Energy Co., Ltd.,Contract signed by Baiyin Jingtai Longlu Development New Energy Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview:

The total installed capacity of the 500,000 kilowatt phase 1 200,000 kilowatt photovoltaic project in Baiyin Jingtai B Zone is 200MW (DC side 244MWp),Divided into two photovoltaic fields, Sitanbei 150MW and Duanjiajing 50MW,The project is located in Sitan Township and Shangshawo Town, Jingtai County,Newly build a 110kV booster seabet appstation,The booster station seabet appis located in the Sitan North Photovoltaic Field Area,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Jingtai through a 110kV line,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of the 500,000 kilowatt second phase 200,000 kilowatt photovoltaic project in Baiyin Jingtai B Zone B is 200MW (DC side 244MWp),The project is located in Luyang Town, Jingtai County,Newly build a 110kV booster station,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Jingtai through a 110kV line,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

Baiyin Jingtai Area B 500,000 kilowatt phase III 100,000 kilowatt photovoltaic project (DC side 122MWp),The project is located in Wufo Township, Jingtai County,Newly build a 110kV booster station,Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Jingtai through a 110kV line,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of the 400,000-kilowatt wind power project in Baiyin Jingtai Area A is 400MW,The project is located in Xiquan Town and Zhongquan Town, Jingtai County,This project plans to install 72 units 5.56MW wind turbine,Supporting installation of 72 box-type transformers,Newly build a 110kV booster station,110kV booster station installs four 150MVA three-phase three-winding power transformers。In this phase, three 150MVA main transformers will be constructed and the installation position of one 150MVA main transformer will be reserved。Connected to the 330kV booster station in Fangcao Village, Luyang Town, South Jingtai through 2 110kV lines,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

The total installed capacity of the 200,000-kilowatt wind power project in Baiyin Jingtai Zone F is 200MW,The project is located in Xiquan Town and Zhongquan Town, Jingtai County,This project plans to install 36 units5.56MW wind turbine,Supporting installation of 36 box-type transformers,Connected to the 110kV booster station of Baiyin Jingtai Zone A 400,000 kilowatt wind power project through 35kV collector line,Sent out uniformly from the 110kV booster station of Baiyin Jingtai Area A 400,000 kilowatt wind power project,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

Baiyin Jingtai South 110MW/440MWh independent energy storage power station project construction scale 110MW/440MWh independent energy storage power station,Battery uses lithium iron phosphate battery,The energy storage battery system and power conversion system are arranged in outdoor containers,A new 330kV booster station is built in the energy storage site,Install 1 120MWA (330kV/35kV) transformer,Newly build a 2km 330kV line,Connected to Jingtai South 330kV booster station and then connected to the grid。

2.2 Bidding scope and division of bid sections (packages): This project is divided into 1 bid section

Tender scope: 1.1 million kilowatts of new energy stations affiliated to Baiyin Jingtai Longlu Development New Energy Co., Ltd. (including 600,000 kilowatts of wind power、Photovoltaic 500,000 kilowatts) and 110MW/440MWh independent energy storage power station power trading agency service,Mainly seabet appincludes: Baiyin Jingtai Area B 500,000 kilowatt phase 1 200,000 kilowatt seabet mobilephotovoltaic power station、Baiyin Jingtai Area B 500,000 kilowatt phase II 200,000 kilowatt photovoltaic power station、Baiyin Jingtai Area B 500,000 kilowatt phase III 100,000 kilowatt photovoltaic power station、Baiyin Jingtai Area A 400,000 kilowatt wind farm、Baiyin Jingtai Area F 200,000 kilowatt wind farm、Baiyin Jingtai South 110MW/440MWh independent energy storage power station three-year power trading agency service,The agency service provider needs to take into account the changes in power market policies in Gansu Province and the actual power generation situation of each project,According to the Gansu Provincial Market Trading Rules, the agency station completed the three-year service period power trading work。

Energy agency service goal: the average settlement price of all on-grid electricity at each station from 2024 to 2026 shall not be lower than that of wind power in the province、Photovoltaic、Average market price of similar energy storage projects,The final actual transaction situation shall be subject to the announcement on the Gansu Electric Power Trading Center platform。(excluding double detailed assessment fee)

Note: The bidder shall quote the total bid price at the same time,You need to quote for each individual project in this bidding section and set up a sub-item quotation list in the bidding document。

2.3 service period

Service period is 3 years,From March 1, 2024 to December 31, 2026。

3. Bidder qualification requirements

1.The bidder is a unit or other organization with independent legal personality registered in the People's Republic of China,Also qualified for electricity trading or electricity sales business。

2.The bidder should have the qualification to sell electricity,And the amount of the guarantee paid at the Power Trading Center is not less than 25 million,And the authorized trading power announced by the trading center is not less than 1.5 billion kWh。

3.The bidder should have a digital decision-making system for new energy station power transactions,And can carry out power prediction transaction auxiliary function。

4.Performance requirements: Have 2 or more domestic achievements in the past 2 years、A total of no less than 100MW new energy stations [power trading agency] service/project or performance of similar services/projects。Provide relevant contract supporting documents (including cover page、Copy of signature page or user certificate, etc.,To prove that it meets the requirements of this tender。

5.Financial requirements: Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2020 to 2022 are required;(need to include balance seabet loginseabet live casinosheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If established less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

6.Credit requirements: The bidder’s commitment to self-examination of social credibility from January 1, 2021 to the present (stamped with the company’s official seal);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

7. This bidding does not accept consortium bids.

4. Obtaining bidding documents

Time: February 01, 2024 09:00 to February 05, 2024 17:00,(Beijing time,Except legal holidays)

Acquisition method: 4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this project after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (just register and register,No need to apply for CA lock)。

4.2 Information required to obtain documents: ①Business license、Enterprise qualification certification materials ② Authorization letter of legal representative and ID card of the authorized person ③ Similar project performance contract certification materials ④ Financial status statement ⑤ Bidder’s social credit self-examination commitment letter and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person ⑥ Bidding document fee remittance voucher ⑦ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy of the original documents or a scanned copy of the official seal (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call (15069174047) to notify the agency for review and confirmation。

4.3 Bidding document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330

4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission seabet.comdeadline: 14:seabet login00 on February 29, 2024;

Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 14:seabet login00 on February 29, 2024;

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8. Contact information

Tenderer: Baiyin Jingtai Longlu Development New Energy Co., Ltd.

Tenderer’s address: 8th Floor, Office Building, Jinwo Kaidi Building, Chengxin Avenue, Baiyin District, Baiyin City, Gansu Province

Tenderer contact person: Manager Zhang

Tenderer’s contact number: 17616758749

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 15069174047、0531-81917677

Agent email: sdzb910@163.com