The name of this bidding project is: Baiyin Jingtai Development New Energy Co., Ltd. 750,000 new energy project full-process cost consulting service,Project bidding number is: 0627-24101331429,The tenderer is Baiyin Jingtai Development New Energy Co., Ltd.,The contract was signed by Baiyin Jingtai Development New Energy Co., Ltd.、Baiyin Development Investment New Energy Co., Ltd.,The source of funds is self-raised by the enterprise。The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,The project is now undergoing domestic public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview:

Baiyin Jingtai Development New Energy Co., Ltd. 750,000 new energy project,Including Baiyin Jingtai Development New Energy Co., Ltd. Jingtai C Area 200,000 kilowatt wind power project、Jingtai D District 350,000 kilowatt photovoltaic project、Jingtai East 330kV Substation、1 190MW/760MWh energy storage;Baiyin Development Investment New Energy Co., Ltd. Pingchuan B Area 200,000 kilowatt wind power project。

The service items of this bidding are:

(1) Pingchuan Area B 200,000 kilowatt wind power project

Pingchuan Area B 200,000 kilowatt wind power project,Includes one wind farm site area。The project is located in Pingchuan District, Baiyin City, Gansu Province。The straight-line distance from the southeast of the wind farm center to the center of Pingchuan District is about 10.5km,The booster station is about 8 meters away from the center of the wind farm.About 5km,The wind farm is in a mountainous area,There is National Highway G109 on the west side of the wind farm、G6 high-speed passing,Good transportation conditions。

The installed capacity of this project is 200MW,Planned to install 32 single machines with a capacity of 6.25MW、Wind seabet.comturbine with seabet live casinohub height 120m。Newly built a 110kV booster station,The wind turbine is connected to the 35kV busbar on the low-voltage side of the newly built main transformer through 8-circuit collector lines。After being boosted by the main transformer, it is sent to the power grid through a 110kV line。110kV electrical main wiring: single busbar wiring form。35kV electrical main wiring: The 35kV side of the main transformer adopts single busbar wiring form,Each transformer is equipped with a section of 35kV busbar on the 35kV side,Each 35kV bus section is connected to the fan incoming line、Reactive power compensation、Station electricity, etc.。Each main transformer low-voltage side 35kV bus is equipped with a set of ±30MvarSVG reactive power compensation device。

(2) Jingtai C Area 200,000 kilowatt wind power project

The installed capacity of Gangdongliang Wind Farm is 200MW,Planned to install 32 units with a single machine capacity of 6.25MW wind turbine,Each fan is installed with one unit, capacity is 6900kVA, voltage level is 35/1.14kV box-type transformer。The fan outlet voltage is 1.14kV,After 32 wind turbines are boosted to 35kV through box-type transformers,The collector lines are divided into 8 groups and merged into the newly built 110kV booster station supporting the Gangdongliang Wind Farm。The booster station is temporarily planned to be connected to the new 330kV collection station with one 110kV power cable,Cable model is YJLW03-64/110-1×1400mm2,Length about 0.4km,The final review opinions of the access system design report approved by the State Grid and relevant departments shall prevail。The 110kV side of the booster station adopts single busbar wiring,Indoor GIS layout,The 35kV side adopts single busbar wiring。This project temporarily plans to install one set of SVG dynamic reactive power compensation devices with a capacity of ±30Mvar on the 35kV Section I busbar and Section II busbar respectively。

(3) Jingtai D District 350,000 kilowatt photovoltaic project

A total of 350MW photovoltaic in Area D of Jingtai County,Divided into three projects for implementation,The project terrain is hilly、Mainly gentle hills,Three projects will build a 110kV booster station in Hongxi Phase II,Planning and construction of 2×180MVA main transformer (330/35kV),New 2-circuit 110kV line connected to the 110kV side of 330kV Jingtai North Station,Length of line is approximately 2×6.93km,Using 2×300mm2 cross-section wire。

(4) Jingtai East 330kV Substation

Jingtai East 330kV booster station is a project planned and constructed according to the supporting new energy project of Baiyin Jingtai Development New Energy Co., Ltd.,This project is located in Wufo Township, Jingtai County, Baiyin City,The project is 26 kilometers away from Jingtai City,County Road X209 is directly connected to National Road G338,Jiangxi Copper has convenient transportation,Conducive to construction。This site collects 200,000 wind power from Gangdongliang、350,000 photovoltaic projects and other new energy projects,Connecting to the 330kV Shicheng substation with a 330kV line。

This project plans to install three 240MVA transformers at the end of the project,330kV outgoing line returns to Shicheng 330kV in this period,Reserve once,8 final outgoing lines for the 110kV side in this period,Reserve 3 times。No outlet on the 35kV side,Only reactive power compensation and station power supply equipment。Based on site location and system planning,330kV、110kV、35kV all use overhead outlets。This project is shared by multiple units,After settlement, the fixed assets will be divided according to the requirements of the construction unit,And assist the construction unit in negotiating with other units。

(5) 190 MW new energy supporting energy storage

The 190MW/760MWh seabet mobileseabet.comenergy storage power station is equipped with an energy storage power station on the power supply side,Lithium iron phosphate battery energy storage system。After the energy storage unit is inverted and boosted,Connected to Jingtai East 330kV substation。The energy storage energy management system is placed in the main control room of the secondary prefabricated cabin,By collecting battery pack、Real-time data of energy storage systems such as PCS,Real-time monitoring and control of energy storage systems,Meet the demand for peak and frequency regulation of the power grid and the need for safe and stable operation of the power grid。

The planned construction period of the above projects is July 2024-December 31, 2025,There are many uncertain factors in the project duration,Service period may be extended,The start time of the consulting service period shall be subject to the time notified in writing by the tenderer (the construction period shall not be extended by more than three months,On-site service consultation fee will not be adjusted,Please bidders fully consider service cycle factors during the quotation process)。

    The bidder signs service contracts with each project company respectively,Pingchuan Area B 200,000 kilowatt wind power project signed a service contract with Baiyin Development Investment New Energy Co., Ltd.,The remaining four projects signed service contracts with Baiyin Jingtai Development New Energy Co., Ltd.,The implementation basis shall be subject to the notice of the project company,The project company may terminate the contract based on the actual situation of the project。

2.2 Bidding scope and bid section (package) division:

(1) Bidding scope:

1. Review the initial project budget estimate as needed;

2、Construction project bidding stage: preparation of bill of quantities、Preparation of maximum bid price limit,Analysis of the winning bid price,Assistance requires non-tendering method (inquiry、Construction confirmed by competitive negotiation, etc.、Procurement work of supplier,Provide relevant cost information required in procurement;

3、During the project construction stage: each project site must ensure two permanent cost personnel (civil engineering、Installation),Monthly project cost review;Construction drawing budget preparation、clear mark;Design changes on site、Visa、Promptly review claims and collect process data;Preparation of monthly items for each project、Quarter、Annual Funding Plan;Prepare the cost management ledger according to the requirements of the client、Monthly Cost Report、Daily cost management work such as cost data compilation;Provide the bidder with real-time price information on industry equipment and materials during the project implementation,Provide a Guangcai.com account for free use by the tenderer。

4、After the project is completed: conduct cost review of all completed projects and issue an review report;

5、Compile the project cost calculation and monitor the whole process of the project cost and provide relevant project cost information, etc.;

6、Decompose the initial project budget estimate as required by the client,Prepare project breakdown estimate;

7. Complete the statistical analysis of cost data;

8、As required by the company’s project department,Carry out cost management related work,Accept unified management by the company's project department。

9、Other requirements: The pricing software must use Bowei software or Glodon software,When the construction unit submits the Weibo or Glodon version of the pricing document,The consulting unit must be equipped with software that can open this file。During the entire project implementation,The construction unit can be opened free of charge as needed、One set of software for browsing Weibo and Glodon documents。

seabet app(2) Bid segment (package) division

This bidding is divided into one bidding section。This project does not accept consortium bids。

3. Bidder qualification requirements

3.1The bidder is a unit or other organization with independent legal personality registered in the People’s Republic of China,Have a valid business license,Must have project performance capabilities,And in staff、Equipment、Having the ability to undertake bidding projects in terms of funds and other aspects,Have a good record of paying taxes and social security funds in accordance with the law。

3.2 Bidders should have management system certification.

3.3 Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2021 to the present (stamped with the company’s official seal);The bidder needs to provide the "China Execution Information Disclosure Network" website (http://zxgk when obtaining documents.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。

3.4 Performance requirements: Provide the performance of at least 3 new energy projects of 100MW and above in the past 3 years (January 1, 2021 to the present) (the three contracts include at least wind power、Two of photovoltaics or energy storage),Including at least one full-process cost consulting performance,And provide contract proof,The scanned copy of the contract must contain at least: the seal page of the contract between the buyer and the seller,Contract signing time,Key information page in performance requirements,Settlement Report、Return visit records or other stamped materials that prove the work has been completed。

3.5Financial status: Provide financial statements issued by audit institutions or certified public accounting firms in the past three years (2021 to 2023);(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2021-2023 audit report or financial statements cannot be provided,Relevant certificates are required,If the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

Qualification requirements for 3.6 personnel:

(1) The project manager is a first-level cost engineer,Under 60 years old,Have at least one performance as the person in charge of cost consulting projects for wind power projects or photovoltaic projects with a capacity of 100MW and above。(Proofing material can be the contract page、Finalization form or owner’s description and other materials)

(2) Each project is guaranteed to have at least two on-site personnel and meet the professional requirements at different stages of the project,The resident time is guaranteed to be more than 28 days per month,One person in each project must have at least a second-level cost engineer qualification or above。

(3) Project participants are all regular employees of the company,Proof of social security payment of the project participants 6 months before the bid opening is required。

Note: The qualifications and performance of parent and subsidiary companies are not allowed to be borrowed from each other;

Consortiums are not accepted in this bidding.

4. Obtaining bidding documents

4.1. How to participate in the bidding: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this project after registration and click to bid to participate,For the operation of the bidding unit, please refer seabet online sports bettingto the "Service Center-Operation seabet myGuide" on the home page (just register,No need to apply for CA lock)。

4.2.Time: 09:00 on July 5, 2024 to 17:00 on July 9, 2024,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license ②System certification certificate ③Legal representative’s power of attorney and authorized person’s ID card、Proof of social security payment of the unit in the past 3 months ④ Proof of social security and tax payment of the bidder for any 3 months within 6 months before the deadline for bidding ⑤ Bidder’s social credit self-examination commitment and the "China Execution Information Disclosure Network" website (http ://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person subject to enforcement⑥Performance contract certification documents⑦Financial status statement⑧Personnel certification materials⑨Tender document fee remittance voucher⑩Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call the agency for review and confirmation。

4.3.Tender document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document expense account: Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on July 26, 2024;

Submission method: paper documents submitted on site;

Submission address: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on July 26, 2024;

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

   This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8. Contact information

Tenderer: Baiyin Jingtai Development New Energy Co., Ltd.

Tenderer’s address: No. 58, Shawo Village, Shangshawo Town, Jingtai County, Baiyin City, Gansu Province

Contact person of the tenderer: Mr. Zhang

Tenderer’s contact number: 17616758749

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 0531-81917677、15069174047

Agent email: sdzb910@163.com






Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share