1. Project Overview

Dongying Economic and Technological Development Zone Geothermal Clean Heating Project General Contracting (EPC),Construction has been approved by relevant departments,The tenderer is Shandong Development Green Clean Energy Co., Ltd.,The source of construction funds is self-raised funds,The project investment ratio is 100%。The project has met the bidding conditions,Now open bidding for the general engineering contracting (EPC) of this project。

2. Basic situation of the project

1、Project name: Dongying Economic and Technological Development Zone Geothermal Clean Heating Project General Contracting (EPC)

2. Project category: Engineering

3. Bidding method: public bidding

4、Project construction scale: 4 medium and deep geothermal energy stations are planned to be built,They are Geothermal Energy Station No. 1、Dongfeng Geothermal Energy Station、Fengshou Geothermal Energy Station and Jinhua Geothermal Energy Station;The project adopts mid-deep geothermal + heat pump technology,Designed heating capacity is about 199MW,The designed heating area is about 5.03 million square meters。The main construction is the civil construction of the energy station (renovation and decoration of the boiler room and ancillary buildings of Station 1 and boiler dismantling、Dongfeng Station Boiler Room Demolition and New Construction、Demolition and construction of boiler room at Fengshou Station)、Energy station equipment installation (heat pump、Heat exchanger、Water pump、High and low voltage power distribution (including outside lines and energy stations)、Automatic control and digital platform、Water treatment system、Valves, instruments and other accessories)、Geothermal well construction (drilling and mud、Down tube, etc.)、Outdoor project (factory road、Wall、Gate、Landscape、Rainwater and sewage pipe network、Firefighting facilities、Identification signage、Barrier gates, etc.)、Production seabet.comand supporting projects seabet sports betting(including heating pipe network、Water supply、Drainage、Power supply and distribution, etc.) and other contents。

5. Tender content

The geothermal clean heating project in Dongying Economic and Technological Development Zone adopts the "design + procurement + construction" engineering general contracting (EPC) model,Including but not limited to:

(1) Survey and mapping within the planning and design scope of this project and subsequent surveys in the preliminary design stage、Design optimization、Construction drawing design、Special design、As-built drawing design、On-site service and all other design-related work。Including but not limited to drawing design and review、Drawing submission、Design explanation、Drawing review、Design changes、Equipment selection、Initial test、All design-related work including intermediate acceptance and final acceptance。Complete the design work in accordance with relevant national and geothermal industry standards and content depth requirements,Provide processing of mining rights、Water Permit、Environmental Impact Assessment、Project construction procedures and other necessary information required for planning and construction reporting。

(2) Equipment and installation scope: Procurement of all equipment and materials required to meet the geothermal resource heating capacity of this project、Supply、Supervision、Urgent delivery、Pick up、Unlucky (including storage yard)、Acceptance of goods (including third-party inspection required by specifications)、Warehousing、Combined installation、Test、Special testing (quality testing、Equipment detection, etc.)、Wiring、Ground、Debugging (including stand-alone debugging within the process system、Sub-system debugging、Joint trial operation and debugging, etc.)、Firefighting、Acceptance、Trial shipment to eliminate defects、Transfer、Performance and production capacity assessment and acceptance、Maintenance、Finished product protection、Safe and civilized construction and supporting technical services (including but not limited to: factory training、On-site training、Onsite service、Civil construction guidance、Technical guidance、Archives, data archiving and transfer, etc.) and all other work,Ensure that the energy station passes full load trial operation、Performance index assessment and completion acceptance。

(3) Construction scope: ①Preliminary preparation work of this project,Including but not limited to five connections and one leveling、Red line fence、Hardening of entry and exit roads and construction of other supporting temporary facilities;②All geothermal wells within the planning and design scope of this project、Geothermal Energy Station、Building unit、Structure、Integrated pipeline、Steel structure、Landscape、Reinforced concrete equipment foundation、Production supporting projects (including thermal power、Water supply、Drainage、Power supply and distribution, etc.)、Dongfeng Fengshou Energy Station boiler room demolition、No. 1 Energy Station Boiler Dismantling、Procurement of materials and equipment for all projects including renovation and decoration of boiler rooms and ancillary buildings、Construction (including earthworks、Drilling and mud engineering、Basic Engineering、Structural Engineering、Decoration and renovation project、Heating pipeline engineering、Strong and weak current engineering、Water supply and drainage project、Fire protection engineering、Intelligent Engineering、Digital Platform、Automatic control system、Communication Engineering、Boiler room renovation project、Environmental protection project、Road Engineering、Landscaping projects, etc.)、Debugging (including stand-alone debugging、Sub-system debugging、Joint trial operation and debugging)、Material testing and testing, etc.,And special monitoring、Finished product protection、seabet online sports bettingSafe and civilized construction、Temporary restoration seabet ioproject after completion of the project、Construction coordination and various coordination during the process、Acceptance (including but not limited to files、Environmental protection、Water Conservation、Municipal、Safety、Firefighting、Planning and other completion acceptance)、Transfer、The crossing (crossing) and protection involved in the transportation of large equipment,And the final construction general contracting for grid-connected heating delivery in accordance with the requirements of the contractor。

(4) Engineering procedures and technical service scope: from the planning permit of the project to the handling of various procedures for the project to be connected to the grid and put into operation,Including but not limited to lightning protection、Environmental protection、Firefighting、File、Occupational hazards、Quality and safety supervision filing、Special acceptance and procedures for grid connection and other matters (obtain relevant documents),And bear the expenses;Apply for project-related construction insurance (including construction and installation project all risks、Third party liability insurance、Safety Liability Insurance、Equipment property liability insurance, etc.) (the beneficiary is the tenderer);Processing completion acceptance and project handover、Related work on the acceptance of archives。The contractor must ensure that the project construction meets the standards and is put into production,Completion acceptance。

(5) Tools and spare parts: The contractor is responsible for purchasing the production operation and maintenance tools necessary for equipment operation and maintenance、Spare parts,Quantity、Specifications are provided according to the technical specifications。

(6) Other work scope: including but not limited to the following: external coordination and cost payment related to the general contracting construction scope;Project temporary construction、Linshui、Following the formalities such as telephony,And entry and exit roads、Coordination of temporary construction roads on site、Construction and acceptance;Road、Railway、River、Line、Communication、Following the procedures for crossing (crossing) underground obstacles;Necessary engineering deficiencies required to ensure the project is put into operation and connected to the grid、Material、Spare parts、Special tools for production safety、Consumables and related technical information and inspection services。

(7) The 10KV high-voltage incoming line of this project is connected to the 10KV incoming line cabinet of each energy station from the ring main unit designated by the State Grid,This project adopts the temporary estimate of professional engineering,Including but not limited to high voltage incoming line design、Purchasing、Construction、Acceptance、Debugging, etc.。

The contractor is responsible for the high-voltage external line access plan、Power supply company docking and other work,Ensure that each energy station has formal power connection before being connected to the grid and put into production。

(8) The contractor’s quality of the general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

(9) This project is a "turnkey project",Procedures encountered during project construction、Coordination、Payment、Work、Acceptance, etc.,Unless the contract clearly stipulates that the contractor is responsible,Regardless of whether it is included in the bidding bill of quantities,All are within the scope of responsibility of the contractor。

6. Maximum bid limit: see the bidding documents for details.

3. Bidder qualification conditions

1、The bidder must have independent legal personality,Have a valid legal person business license。

2、The bidder must have the following designs at the same time、Construction seabet clubqualification requirements:

(1) Design qualifications: Bidders must possess seabet sports bettingthe following ① or ② qualifications:

①Comprehensive Grade A qualification in engineering design.

②Also has Grade A in the engineering design municipal industry、Construction industry Grade B and above qualifications。

(2) Construction qualifications: possess the first-level and above general contracting qualifications for municipal public works construction and the second-level and above general contracting qualifications for construction projects issued by the construction administrative department,And obtain a valid "Safety Production License"。

3、This project accepts consortium bids,The consortium consists of the design unit and the construction unit,Clear the responsibilities and rights of the consortium member units in the consortium agreement。All parties to the consortium shall jointly sign an engineering general contracting (EPC) contract with the contractor,And assume joint and several liability to the contractor for the general contracting project。All parties to the consortium should identify the leading unit and shall not use their own names to participate in other consortium bidding for this project,No changes shall occur after the consortium is formed,Consortium members must not exceed 3。Responsible for design among consortium members、Construction units must meet the above (1)、(2) Minimum qualification requirements。

4、The bidder has the performance of undertaking 1 heating project or municipal project EPC (or design + construction) project with a contract price of not less than 100 million yuan independently or as a consortium since January 1, 2019。The bidder must provide a copy of the key pages of the contract (the key pages include the project name、Name of undertaking unit、Contract price page、Signature page、Signing time)、Project handover production handover letter or completion acceptance certificate。If the bidder is a consortium,At least one member of the consortium meets the above minimum performance requirements。

5. Requirements for the proposed project leader:

(1) General contracting project manager (consortium bidding,Provided by the consortium leader): Obtain the corresponding engineering construction registered professional qualification (registered first-class construction engineer (municipal or mechanical and electrical major) or registered equipment engineer (HVAC or power) or registered supervision engineer),And holds the production safety assessment certificate (Category B)。

(2) Project design leader: must have the titles of national registered equipment engineer (HVAC or power) and senior engineer,8 years and above design work experience (original certificate from the unit must be provided)。

(3) Project construction leader: must have the qualification of a registered first-class construction engineer (municipal or mechanical and electrical professional),8 years and above construction experience (original certificate from the unit must be provided),And holds the production safety assessment certificate (Category B)。

(4)General Contracting Project Manager、Project design leader、Projects managed by the project construction leader must not have quality accidents or production safety accidents。If the bidder conceals the safety incident,Cancellation of bid or winning bid upon discovery。

(5)General Contracting Project Manager、The person in charge of project construction shall not concurrently take on the management of other projects during his tenure in this project。

(General Contracting Project Manager、Project construction manager、The project design leaders shall be held by three persons respectively,The above certificates should be registered in this unit)

6、The bidder should have good business reputation。Not included in the "Credit China" list of dishonest persons subject to enforcement。

7、Good financial and credit status in the past three years (2021-2023),Have sufficient liquidity to undertake this bidding project,Should have financial statements for the last three fiscal years audited seabet mobileby an independent auditor,No property is frozen by receivership、or loss、In bankruptcy status。

8、Has valid quality、Environment、Occupational Health and Safety Management System Certification Certificate。

9. Bidders shall not have the following circumstances:

(1) The bidder is listed as a dishonest person subject to execution by the People’s Court;

(2) The bidder or its legal representative is included in the bribery crime file by the People’s Procuratorate;

(3) The bidder is listed in the list of enterprises with abnormal business operations by the Market Supervision Bureau (especially enterprises with serious violations of law and dishonesty);

(4) The bidder is included in the list of parties to major tax violations by the tax department;

(5) The bidder is included in the list of dishonest entities that seriously default on wages of migrant workers and has not been withdrawn。

10. Qualification review method: post-qualification review.

IV. Receiving Bidding Documents

1、Tender document supply period: 15:00 on July 6, 2024 to 17:00 on July 11, 2024。

2、This project adopts online registration,Anyone who is interested in participating in the bidding must submit the bidding documents within the deadline,Log in to Shandong Province Public Resources Electronic Trading Platform (http://ggzyjyzx.shandong.gov.cn:6001/TPBidder/memberLogin) to register and download the bidding documents。

3、After registration is completed,Use the enterprise digital certificate (CA) identity authentication key to confirm the project and download the bidding documents,Operation steps: The first step is to fill in the information in the "Fill in Bidding Information" menu in the business management item;The second step is to select the corresponding bid section in the "Tender Document Collection" menu to enter the collection page,Click "Download Bidding Documents" to enter the download page to download the bidding documents。

For units that have not applied for an enterprise digital certificate (CA), log in to the Shandong Provincial Public Resources Electronic Trading Platform (http://ggzyjyzx.shandong.gov.cn:6001/TPBidder/memberLogin),Click the CA Application Guide at the bottom right of the login page,Download instructions to apply for enterprise digital certificate (CA)。

System technical support: 0531-51778967

4、This project will be subject to post-qualification review,Success in obtaining the bidding documents does not mean passing the post-qualification review。

5. Submission of bid documents

See the bidding documents for details

6. Bid opening time and place

See the bidding documents for details

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Tendering Public Service Platform、Shandong Provincial Public Resources (State-owned Property) Trading Center-Sunshine Procurement Service Platform、Published on the websites of Shandong Provincial Public Resources Trading Center and Shandong Development Investment Holding Group Co., Ltd.。

8. Contact information

1. Tenderer information:

Tenderer: Shandong Development Green Clean Energy Co., Ltd.

Address: Room 205, Building 73, Dengzhou Road, Dongying District, Dongying City, Shandong Province

Contact: Teacher Xin

Tel: 0531-56065733

2. Bidding agency:

Tendering agency: Shandong Tendering Co., Ltd.

Address: Room 1103, 11th Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Jinan City

Contact: Liu Xu

Tel: 0531-81917620

Email: sdtc7b@163.com

 

 