(Project number: 0627-24101401500)

1.Tender conditions

The name of this bidding project is Jingyuan Shanfa Investment New Energy Co., Ltd. Jing'an 200,000 kilowatt wind power project general contracting (EPC),The tenderer is Jingyuanshan Fatou New Energy Co., Ltd.,The source of funds is self-raised funds,The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1Project Overview、Bidding scope and bid section (package) division:

2.1.1 Project Overview:

This bidding project is Jingyuan Shanfa Investment Jing’an 200,000 kilowatt wind power project,The project is located about 56km northeast of Jingyuan County,The specific location of the site is 104°33 East Longitude'51.8"~105°6'34.64", north latitude 36°39'46.78"~36°59'32.54"between,The altitude of the wind farm area is between 1850m and 2150m,The site area is land terrain。The S205 provincial highway passes through the north of the wind farm、There is G6 Beijing-Tibet Expressway in the northwest、The G341 national highway passes through the southeast,Convenient transportation conditions。

The total installed capacity of this project is 200MW,Planned to install 32 units 6.25MW wind turbine,Supporting installation of 32 box-type transformers,Newly build a 110kV booster station,110kV booster station installation plan and installation of 2 100MVA transformers,Built in one go,No expansion in the later stage。This project is connected to the newly built 110kV booster station through a 35kV collector line,Connect one 110kV line to the 110kV side of the 330kV booster station of Canghai Substation,Through Canghai substation 330kV booster station main transformer boost and then connected to the grid。110kV electrical main wiring: single busbar wiring form;The 35kV side of the main transformer adopts single busbar wiring form,Each transformer is equipped with a section of 35kV busbar on the 35kV side,Each 35kV bus section is connected to the fan incoming line、Reactive power compensation、Station electricity, etc.;Each main transformer low-voltage side 35kV busbar is equipped with a set of ±30MvarSVG reactive power compensation device。

2.1.2 Bidding scope and bid section (package) division:

This project has a total of 1 bid section.

Tender scope:

Jingyuanshan Development Investment Jing’an 200,000 kilowatt wind power project construction general contracting (EPC) project (new 200MW wind farm、Newly build a 110kV booster station、New approximately 33.4km 110kV transmission line) all designs involved from construction preparation to completion acceptance、Purchasing (except equipment supplied by A)、Processing、Construction、Test、Debug、Trial run、Training、Transfer to production、Performance Quality Assurance、Project quality warranty period services and other contents。Including but not limited to:

(1) Equipment procurement scope: all equipment and materials that meet the installation requirements of this project (wind turbines、Tower、After the anchor bolts and other materials are purchased through bidding by the contractor,Perform contract transfer,Incorporated into the management scope of EPC general contractor),Including but not limited to: wind farm equipment required for this project、The primary and secondary electrical equipment of the booster station (the secondary equipment of the booster station includes comprehensive automation、Network-related equipment expansion、Boost station video surveillance and fire alarm system expansion, etc.)、On-site collector circuit、110kV transmission line (including tower seabet betting platformmaterials、Cable、Optical cable) and other hardware and software equipment and corresponding technical services、Network security situational awareness equipment、Intelligent station equipment、Firefighting facilities and corresponding technical services,Various equipment, materials and services that meet the technical requirements of smart wind farms and expedited delivery of equipment within the procurement scope (including equipment and materials supplied by A)、Transportation (except equipment supplied by A)、Pick up、Unlucky (including storage yard)、Acceptance of goods、Management work such as warehousing and storage (including supplying equipment and materials);Fan for this project、Anchor、Except main transformer, etc.,The bidder is responsible for the supervision of the rest of the equipment,The equipment purchased by the contractor must meet the grid connection requirements of the local power grid company。See Appendix 4 for the recommended short list of major equipment manufacturers purchased。Annex 20 Network security situational awareness equipment needs to meet the attachment "GB/T 42453-2023 Information security technology - General technical requirements for network security situational awareness"、Annex 25 "Notice on Issuing a Work Arrangement for the Construction of the Energy Industry Internet Platform" (State-owned Assets Supervision and Administration Commission [2021] No. 287)。

(2) Design Scope: Responsible for including but not limited to the design and review of the entire construction drawing、Preparation of as-built drawings;Special article on safety facility design、Soil and water conservation design、Firefighting special article、Compilation of special articles on occupational disease hazards、Preparation of equipment technical specifications (including preparation of bidding documents);Technical explanation of construction drawings、On-site engineering service (on-site engineering agency is the chief designer of each major);Cooperate with on-site construction permit procedures to handle drawing review、Land use procedures work。The contractor must design in accordance with the relevant regulations on wind farm construction of Jingyuanshan Fatou New Energy Co., Ltd. and meet the requirements。

(3) Construction scope:

Road engineering of this project (including approach road、Roads within the venue、Inbound road,Including newly built roads and reused and renovated roads)、Fan foundation and box transformer foundation project、Installation, commissioning and trial operation of all equipment (including fans、Tower)、35kV collector line construction project (crossing)、110kV booster station construction and installation project、110kV transmission line project、Large equipment (fans、Excluding tower equipment) spanning (crossing) involved in the transportation process,Including railway、Highway、National Highway、Provincial Road、County Road、Various situations such as rural roads and overhead lines)、Relocation line、Demolition、Coordination, etc.,Fire protection engineering、Grounding works and ancillary works、Construction of on-site communication engineering and water and power supply (surrounding ecological environment protection during the process、Domestic water source protection and management (if any)、Water Conservation、Environmental protection measures guarantee)、Finished product protection、Reclamation project (vegetation restoration) after completion of the project、Environmental Protection Project、Soil and water conservation project (meeting relevant requirements for approval and acceptance)、Safety、Occupational health and all other work,Domestic water and electricity、Coordination of land acquisition and various coordination during construction、Acceptance (including files、Environmental protection、Water Conservation、Complete acceptance of fire protection, etc.),Complete wind turbine generation、Send、Trial operation of substation system、The defect elimination and fan successfully passed the 250-hour trial operation、Grid-connected commercial operation and completion acceptance,And finally deliver the whole process contracting of grid-connected power generation in accordance with the requirements of the contractor。Various tests during the construction process (including pile foundation testing) are included in the scope of the general contract。The production scheduling data is respectively connected to the production operation center of the project company and shareholder unit。

(4) Scope of procedures: except land use pre-examination、Project Approval、Social Stability Registration、Environmental impact assessment (including electromagnetic radiation) report and approval、Safety pre-evaluation、Three Simultaneous Occupational Health、Overburden Minerals Report and Approval、Soil and Water Conservation Report and Approval、Outside of Earthquake,Other procedures shall be handled by the bidder,Including but not limited to:

①Land use procedures: The contractor is responsible for handling permanent land use、All procedures for long-term land lease and temporary land use (including forest and grass) and payment of various compensations for above-ground and underground attachments (such as compensation for young crops、Forest land compensation、Graveyard compensation、Production reduction compensation、Forest and grass vegetation restoration fees, etc.),And the coordination costs during the processing。All land use costs during the project construction and operation periods shall be borne by the contractor (including seabet appthe contractor responsible for paying the permanent land transfer fee、Land use tax、Farmland occupation tax, etc.)。The scope of land acquisition includes but is not limited to the roads within the site、Level crossing、Boost station、Wind turbine platform and foundation、Collection circuit tower base and working surface、Construction access road、Temporary facility、Equipment storage yard and other land。The long-term land lease term includes the construction period and operation period stipulated in the contract,The operation period is considered to be 20 years。

②Special procedures、Special acceptance and warrant processing: all preliminary special construction procedures before the start of construction (including but not limited to construction project planning license、Construction Land Planning Permit、Construction permit)、Special acceptance (water conservation acceptance、Environmental Impact Assessment Acceptance、Fire protection acceptance、Safety facility acceptance evaluation、Special acceptance such as file acceptance and acceptance certificate)、Electricity Business License、Processing of real estate certificates, etc.。Please see the attachment for the preliminary procedures entrusted by the contractor,All other procedures shall be completed by the contractor。

③Responsible for handling including provincial transfer、Ground-grid connection dispatching agreement,Electricity purchase and sale contract、Full set of grid connection procedures including high-voltage power supply contract。

④Technical services related to this project,such as micro site selection review、Factory training、On-site training、Device debugging、Unit trial operation and operation and maintenance services during construction period、Electrical equipment warranty service, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electricity secondary security protection evaluation、Network-related tests (including but not limited to power quality tests、Active power control capability test、Wind farm reactive power/voltage control capability test、Dynamic reactive power compensation device grid connection performance test、Wind farm inertia response and primary frequency modulation test、Electrical simulation model、Voltage/frequency adaptability test)、Grid-connected trial operation、Elimination、Acceptance,Complete acceptance and project handover、Related work on the acceptance of archival materials,And all work related to general contracting projects。

⑤ Handle all construction and safety risks related to the project、Third party liability insurance、Safety Production Liability Insurance、Personal accident insurance and other insurance。

(5) Other scope of work: including but not limited to all government coordination、Local relationship processing、Civil Coordination;Processing procedures for project start,Soil and Water Conservation Supervision、Soil and Water Conservation Monitoring、Environmental Protection Supervision;Project acceptance;All special acceptance related to this project (including but not limited to: planning、Firefighting、Environmental protection、Water Conservation、File、Occupational disease hazards, etc.)、Safety、Quality supervision inspection and acceptance、Project data file organization、All work including transfer and special acceptance of files、Transfer and service during the warranty period,And meet the requirements of the contracting party to meet the standards and start production、Passed acceptance by the contractor。Also includes all necessary engineering deficiencies、Material、Spare parts、Special tools for production safety、Consumables and related technical information and personnel training,Various meetings during the construction period,Project data includes but is not limited to process data、Completion Information。

(6) Production preparation scope: necessary production tools required for site operation and maintenance、Instrumentation、Insulated tools、Grounding wire facilities and various production preparations。The production preparation tools listed in the production preparation tool list in the attachment are all purchased by the bidder,And bear the corresponding expenses。

(7) This bidding does not include project supervision services.

(8) The contractor’s quality of the general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

(9) The quality warranty period of the complete fan of this project is five years,Main variable、GIS、Main power transformation and distribution equipment such as reactive power compensation、Protective equipment、Comprehensive self-system、Communication equipment and accessories for two years,The rest are one year。

(10) Procedures encountered during project construction、Coordination、Payment、Work、Acceptance, etc.,Unless the contract clearly stipulates that Party A is responsible,Regardless of whether it is included in the bidding bill of quantities,all belong to the scope of work of Party B。If the bidder cannot respond to all the requirements of the bidding documents,Discrepancies should be clearly stated in a separate document,Otherwise, regardless of whether the content of the bidding document is consistent with the requirements of the bidding document,It is deemed that the bidder has responded to all requirements of the bidding documents。

2.2 Project duration: The actual start time of work shall be subject to the start time of work specified in the supervisor’s start of work notice; seabet online sports bettingRequires full-capacity grid-connected power generation conditions on December 31, 2024。

3. Bidder qualification requirements

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

①Bidder registered in the territory of the People’s Republic of China,A branch with independent legal personality or established in accordance with the law,The bidder must have a business license issued by the relevant department and it is valid。

②The bidder must have the ability to perform the corresponding project,And in staff、Equipment、Have the ability to undertake bidding projects in terms of funds and other aspects,Have a good record of paying taxes and social security funds in accordance with the law。

③The bidder should have both ac or bc qualifications:

a) Engineering design comprehensive qualification Class A、Engineering Survey Comprehensive Qualification Class A、Power engineering construction general contracting qualification level two or above;

b) The bidder should have the first-level or above general contracting qualification for power engineering construction issued by the construction administrative department and the installation (repair) qualification issued by the National Energy Administration.、Trial) Level 1 Electric Power Facilities License。

c) Valid safety production license.

④The person in charge of the unit is the same person or has a controlling stake、Different units that manage relationships,Not allowed to participate in the bidding of this project at the same time。

[2]Performance requirements: Bidders should have cumulative completion of at least 2 EPC general contracting performance of onshore wind power projects of 50MW or above from January 1, 2021。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;The project completion certificate should be one of the following certificates: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion acceptance report。

[3] Financial requirements: Provide financial statements issued by an audit agency or certified public accounting firm from 2021 to 2023;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2021-2023 audit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: Bidder’s social credibility self-examination commitment from January 1, 2021 to present (stamped with company seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major)。

(2) The proposed project manager must have the performance of at least two EPC general contracting project managers of onshore wind farms of 50MW and above,The bidder must provide supporting documents that can prove the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Project Manager、Completion/operation time and unit name),Current appointment document or certification document issued by the owner;Scan copy of full-capacity grid connection certificate or completion acceptance report issued by the owner or a third party。At the same time, it is necessary to provide the social security certificate of the project manager who has worked for the bidding unit for 6 consecutive months before bidding。

[6] Qualification requirements for the design person in charge (bidders with only construction qualifications are not required at this bidding stage):

(1) Bidders must provide registered engineering design qualifications or senior or above (including senior) engineer qualifications。

(2) The design leader must have at least 2 working experiences as the design leader for onshore wind farm projects of 50MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the design,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Design person in charge、Completion/operation time and unit name);Current appointment document or certification document issued by the owner;Scan copy of full-capacity grid connection certificate or completion acceptance report issued by the owner or a third party。

[7] Qualification requirements for the construction person in charge (bidders with only design qualifications are not required at this bidding stage):

(1) The bidder must have a first-class registered construction engineer qualification (construction engineering or mechanical and electrical engineering major)。

(2) The construction leader must have at least 2 experiences as project manager or deputy project manager seabet loginor construction leader of onshore wind farms of 50MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Construction manager、Completion/operation time and unit name)。

[8] Qualification requirements for the safety director: Qualification requirements for the safety director: Should have a registered safety engineer certificate,Served as safety director (or general safety manager, etc.) for at least one onshore wind power project of 50MW or above。The bidder must provide supporting documents proving the performance of the project safety director,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Project Manager、Completion/operation time and unit name),Current appointment document or certification document issued by the owner;Scan copy of full-capacity grid connection certificate or completion acceptance report issued by the owner or a third party。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

Except for force majeure,The winning bidder will start from the deadline for bidding to the date when the contracted quantity of work is completed,The key personnel mentioned in this article shall not be replaced or evacuated。

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

Acquisition time: from 09:00 on July 11, 2024 to 17:00 on July 16, 2024

How to obtain:

4.1.How to participate in the bidding: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this project after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (register and click on bidding to participate,No need to apply for CA lock)。

4.2.Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding project completion certification materials ④ Financial status statement ⑤ Bidder's credibility self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty ⑥ Personnel qualification certificate and relevant supporting materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After sending successfully, call the agency for review and confirmation。

4.3 Bidding document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.4Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:00 on August 1, 2024 (Beijing time);

Submission method: Submit paper documents in the conference room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:00 on August 1, 2024 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Jingyuanshan Fatou New Energy Co., Ltd.

Tenderer’s address: No. 157, Guangchang South Road, Wulan Town, Jingyuan County, Baiyin City, Gansu Province

Contact person of the tenderer: Liang Zhishuai

Tenderer’s contact number: 18954060116

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 0531-81917677、15069174047

Agent email: sdzb910@163.com