seabet mobile
seabet live casino
seabet online casino

seabet live casino

seabet mobile


1. Bidding conditions

The name of this bidding project is Baiyin Jingtai Development New Energy Co., Ltd. Jingtai、Pingchuan regional new energy project and supporting power transmission and transformation engineering equipment supervision service project,The source of project funds is self-raised funds,The tenderer is Baiyin Jingtai Development New Energy Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview

2.1.1 Overview of the 200,000-kilowatt wind power project in Pingchuan Area B

Baiyin Development Investment New Energy Co., Ltd. (Pingchuan) Area B 200,000 kilowatt wind power project is located in Pingchuan District, Baiyin City, Gansu Province,The project is an important part of the Longdong DC UHV project,Construction scale: 200,000 kilowatts,Newly build a 110kV booster station。The straight-line distance from the southeast of the wind farm center to the center of Pingchuan District is about 10.5km,The booster station is about 8 meters away from the center of the wind farm.About 5km,The wind farm is in a mountainous area,There is National Highway G109 on the west side of the wind farm、G6 high-speed passing,Good transportation conditions。Pingchuan District,Located in central Gansu Province、Central Baiyin City,Connected to Huining County and Haiyuan County of Ningxia Hui Autonomous Region in the east,South、The north is connected to Jingyuan County,Neighboring Jingtai County to the west。Located at 104°18 East'~105°26', 36°10N'~37°00'between. The total area is 2126 square kilometers.

The total installed capacity of this project is 200MW,Planned to install 32 units 6.25MW wind turbine set。Set up 32 6600kVA box-type booster stations as unit transformers,Change the generator voltage from 1.14kV is increased to 35kV and connected to the 35kV bus of the on-site booster station through the collector line。One machine and one transformer unit wiring method is used between the wind turbine unit and the box-type booster station。This project will build a new 110kV booster station,Two 100MVA main transformers are installed in the station。The 110kV side of the booster station adopts single busbar wiring,Connected to the grid with one 110kV line,The 35kV side of the main transformer adopts single busbar wiring。

2.1.2 Overview of the 200,000-kilowatt wind power project in Jingtai Area C

Jingtai C Area 200,000 wind power project is located in Jingtai County, Baiyin City, Gansu Province,The straight-line distance between the wind farm and Jingtai County is about 20km,About 80km seabet sports bettingfrom Baiyin City。There is highway G2012 on the north side of the wind farm area,There are highway G1816 Uma Expressway and national highway G338 passing by on the west side,External transportation is more convenient。

The installed capacity of this project is 200MW,A total of 32 units installed with a single machine capacity of 6.25MW wind turbine,Each fan is installed with a capacity of 6900kVA and a voltage level of 35/1.14kV box transformer。The fan outlet voltage is 1.14kV,After 32 wind turbines are boosted to 35kV through box-type transformers,The collector lines are divided into 8 groups and merged into the newly built 110kV booster station supporting the Gangdongliang Wind Farm。The booster station is temporarily planned to be connected to the new 330kV aggregation station with one 110kV power cable。

2.1.3 Overview of the 350,000 kilowatt photovoltaic project in Jingtai D District

The 350,000 photovoltaic project site in Jingtai D Zone is located in Jingtai County, Baiyin City,Located in the northern border of the hinterland of Gansu Province,Southern edge of Tengger Desert,Located in the transition zone between the Loess Plateau and the Tengger Desert,is the gateway to the east end of the Hexi Corridor。Bordering the Yellow River and Jingyuan County in the east、Pingchuan District faces each other,South and Baiyin District、Gaolan County and Yongdeng County border,Adjacent to Tianzhu Tibetan Autonomous County and Gulang County in the west,Borders with Alxa Left Banner of Inner Mongolia Autonomous Region and Zhongwei County of Ningxia Hui Autonomous Region to the north。

Jingtai D District 350,000 photovoltaic project is divided into three phases。The third phase of the project will build a 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),New 2-circuit 110kV line connected to the 110kV side of 330kV Jingtai North Station。

Jingtai D Zone Phase I 150,000 kilowatt photovoltaic project. This project is located in Jingtai County, Baiyin City, Longdong Prefecture, Gansu Province,The project installed capacity is 187.504720MWp,A total of 323,284 585Wp monocrystalline N-type bifacial photovoltaic modules installed,AC side capacity is 150MW。The total land area for this photovoltaic array layout is 567.4218hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 48 sub-arrays,Contains 44 3.3MW power generation unit、2 1MW power generation units、1 1.25MW power generation unit、1 1.6MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit is equipped with a 1000kVA box-type transformer;After each box transformer sets the voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi booster station through cable parallel connection and grouping,A total of 6 collector circuits,The current collection line adopts the laying method of direct buried cable + overhead wire。

The second phase 100,000 kilowatt photovoltaic project site in Jingtai D Zone is located at about 6 west of Manshuitan Township, Jingtai County.0km,The center coordinate of the field is 37°28 North latitude'56.0895",103°55 East Longitude'44.2543",35 miles from Jingtai County.0km;The booster station is located in the southeast corner of the photovoltaic factory,The center coordinate of the site is 37°28 North latitude'14.1289",103°57 East Longitude'26.4066"。S308 nearby、S315 provincial road passed,There is a wind farm maintenance road accessible near the station site,Convenient transportation。This project is located in Jingtai County, Baiyin City, Longdong Prefecture, Gansu Province,The project installed capacity is 125.0132MWp,A total of 215,540 585Wp monocrystalline N-type bifacial photovoltaic modules installed,AC side capacity is 100MW。In this project area and Phase I、One public 110kV booster station will be built in the third phase,Located in this phase of the project。The total land area for this photovoltaic array layout is 344.5222hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 31 sub-arrays,Contains 30 3.3MW power generation unit and 1 1MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit is equipped with a 1000kVA box-type transformer;After each box transformer sets the voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi booster station through cable parallel connection and grouping。This project is based on 10% photovoltaic power generation capacity,Energy storage system configured with 4-hour peak shaving capacity,Total 10MW/40MWh to build an independent power station together with other wind and solar projects of the group,The access system plan is: build a new 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),New 2-circuit 110kV line connected to the 110kV side of 330kV Jingtai North Station。

Jingtai seabet mobilePhase III 100,000 kilowatt photovoltaic project is located in Jingtai County, Baiyin City, Longdong Region, Gansu Province,The project installed capacity is 125.0132MWp,A total of 215,540 585Wp monocrystalline N-type bifacial photovoltaic modules installed,AC side capacity is 100MW。The total land area for this photovoltaic array layout is 304.0164hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 31 sub-arrays,Contains 30 3.3MW power generation unit and 1 1MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit is equipped with a 1000kVA box-type transformer;After each box transformer sets the voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi booster station through cable parallel connection and grouping,A total of 4 collector lines,The current collection line adopts the laying method of direct buried cable + overhead wire。

2.1.4 330kV substation project

Baiyin Jingtai Development New Energy Co., Ltd. (Jingtai) Wufo Township 330kV Substation Project (hereinafter referred to as: Jingtai East 330kV Substation) is a project planned and constructed based on the Baiyin Longdong DC Supporting New Energy Project,This project is located in Wufo Township, Jingtai County, Baiyin City,The project is 26 kilometers away from Jingtai City,County Road X209 is directly connected to National Road G338,Jiangxi Copper has convenient transportation,Conducive to construction。This site collects 200,000 wind power from Gangdongliang、350,000 photovoltaic projects and other new energy projects,Connecting to the 330kV Shicheng substation with a 330kV line。

This project plans to install two 240MVA transformers and one 360MVA transformer at the end of the project,330kV outgoing line will return to Shicheng 330kV in this period,Reserve once,8 final outgoing lines for the 110kV side in this period,Reserved for 3 times。No outlet on the 35kV side,Only reactive power compensation and station power supply equipment。Based on site location and system planning,330kV、110kV、35kV all use overhead outlets。

2.2 Bidding Scope

2.2.1 Jingtai Pingchuan Area B 200,000 kilowatt wind power project

Project equipment supervision service bidding scope,Including but not limited to: 32 units involved in the project 6.25MW main engine (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical Terms)、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.2 Jingtai D District 200,000 kilowatt wind power project

Project equipment supervision service bidding scope,Including but not limited to: 32 units involved in the project 6.25MW main engine (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical Terms)、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.3 Jingtai D District 350,000 kilowatt photovoltaic project

Project equipment supervision service bidding scope,Including but not limited to: photovoltaic modules involved in the project、Inverter、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、35kV switch cabinet、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical Terms)、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.4 Jingtai East 330kV Substation Project

Project equipment supervision service bidding scope,Including but not limited to: main transformers involved in the project (including station transformers and other transformers)、GIS combination electrical appliances、SVG reactive power compensation device、Key point manufacturing supervision as well as cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical Terms)、Witness,Mainly including material preparation、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

This project is divided into one bidding section.

2.3 Service Period

The planned service period is 10 months (from the beginning of supervision until the completion of supervision of all equipment,The specific date shall be subject to the written notice of the tenderer)。

3. Bidder qualification requirements

3.1The bidder is a unit or other organization with independent legal personality registered in the People’s Republic of China,Have a valid business license,Must have project performance capabilities,And in staff、Equipment、Having the ability to undertake bidding projects in terms of funds and other aspects,Have a good record of paying taxes and social security funds in accordance with the law。

3.2The bidder must have the Class A qualification for "Wind Power Station Equipment" issued by the China Equipment Supervision Association and have the CMA qualification,Or have the CNAS17020 inspection and accreditation qualification issued by the China National Accreditation Service for Conformity Assessment。

3.3The project director engineer and professional equipment supervision engineers provided by the bidder for each project shall meet the equipment supervision on-site staffing requirements for each project,And they are all current employees of the bidding unit,Proof of social security payment for the past three months in the bidding unit is required。The proposed chief construction engineer must provide a valid registered equipment supervisor qualification certificate。

3.4、Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2021 to 2023 are required;(need to include balance sheet、Cash flow seabet loginstatement、Copy of income statement,Missing any item is considered not provided),If the company has been established for less than three years,Unable to provide the 2021-2023 audit report or financial statements,Financial statements issued by an auditing agency or certified public accounting firm since the company’s establishment are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided);

3.5、Reputation requirements: The bidder’s social credibility self-examination commitment from January 1, 2021 to the present (stamped with the company’s official seal、Customized format);The bidder needs to provide the "China Execution Information Disclosure Network" website (http://zxgk when obtaining documents.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons subject to enforcement in accordance with laws and regulations that restrict participation in service project bidding activities。

3.6. Performance requirements:

(1) Bidding deadline on January 1, 2021 (subject to the time of contract signing),The bidder must provide at least 2 copies of equipment supervision contract results for wind power projects of 100MW and above and equipment supervision contracts for photovoltaic projects of 50MW and above,The content of the wind power project supervision contract must include at least the host、Blade、Steel tower/tower、Main variable、Box transformer equipment;The content of the photovoltaic project supervision contract must include at least photovoltaic modules、Bracket、Box transformer\inverter equipment。Performance contract certification documents must include the contract cover、Main work content or technical agreement、Contract signature page、Signing time,Performance certification documents that are not provided in accordance with the above requirements will be deemed invalid。

(2) February 2019 to the bidding deadline (subject to the time of contract signing),Wind power project chief engineering engineer must have at least one performance as chief engineering engineer of equipment for wind power projects of 100MW and above,Photovoltaic project chief manufacturing engineer has at least 1 PV project equipment chief manufacturing engineer performance of 50MW and above,The chief manufacturing engineer of the booster station project has at least 1 performance of the chief manufacturing engineer of the booster station equipment。The bidder must provide supporting documents proving the performance of the chief engineering engineer,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Chief supervisory engineer and unit name)。

Consortium bids are not accepted for this project.

4. Obtaining bidding documents

4.1.Time: 09:00 on August 16, 2024 to 17:00 on August 21, 2024,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Power of attorney of legal representative and ID card of the authorized person、Proof of social security payment of the unit in the past 3 months ③ Proof of social security and tax payment of the bidder for any 3 months from February 2024 to present ④ Statement of financial status ⑤ Documents proving corporate performance contract ⑥ Proof of project personnel qualifications、Performance certification materials ⑦ The bidder’s credibility self-examination commitment and the "China Execution Information Disclosure Network" website (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a dishonest person subject to execution ⑧ Bidding document fee remittance voucher ⑨ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。The bidder shall send the original or scanned copy of the above information (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call (15069174047) to notify the agency for review and confirmation。

4.2.Tender document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330。

4.3.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 14:00 on September 6, 2024 (Beijing time);

Submission method and address: Paper document submission;No. 13, Wenhua West Road, Lixia District, Jinan City

6. Bid opening time and place

Bid opening time: 14:00 on September 6, 2024 (Beijing time);

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Baiyin Jingtai Development New Energy Co., Ltd.

Tenderer’s address: Project Department on the third floor of the rear apartment of Shuiyunchuan Hotel, Pingchuan District, Baiyin City, Gansu Province

Contact person of the tenderer: Mr. Xia

Tenderer’s contact number: 13099109557

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 15069174047、0531-81917677

Agent email: sdzb910@163.com






Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share