一、seabet app name: Shanfa Longcheng Vein Industrial Park Sludge Resource Disposal seabet app Off-site Comprehensive Pipe Network Steam Pipeline seabet app
二、seabet app number: 0627-24020681536
三、Tenderer: Shanfa (Zhucheng) Environmental Protection Energy Co., Ltd.
4. Basic Situation
1、seabet app Overview: The off-site comprehensive pipe network steam pipeline seabet app of Shanfa Longcheng Vein Industrial Park Sludge Resource Disposal seabet app is an ancillary supporting seabet app of Shanfa Longcheng Vein Industrial Park Sludge Resource Disposal seabet app,Mainly includes the construction content of steam delivery pipelines and condensate recovery pipelines necessary for the main seabet app production support。Pipeline path: The steam pipeline is connected to the north side of the main entrance of the sludge resource disposal seabet app of Shanfa Longcheng Vein Industrial Park,Lay along the east side of Wanjie Road from south to north to Shunchang Road,Then lay along the south side of Shunchang Road to the east,Passing through the north gate of the Changtai Packaging Equipment Co., Ltd. factory (the branch pipe is connected to the measurement room within the red line of the enterprise),Continue to lay eastward to the north gate of Planio Men's Clothing Co., Ltd. factory and access the measurement room inside the red line,At the same time, it will be laid to the north along the west side of Shuntai Street,Lay through the east gate of Huixiang Food Co., Ltd. (reserved interface) to the north side of the square in front of the bonded area and turn west (reserved northbound main pipeline interface) to the measurement room of Zhucheng Shengda Electrical Materials Co., Ltd. factory。The condensate recovery pipe is connected to the north side of the existing boiler room in the factory of Plannio Men's Wear Co., Ltd.,Lay from south to north to Shunchang Road,Then lay along the south side of Shunchang Road to the west to Wanjie Road,Lay along the east side of Wanjie Road to outside the red line on the northwest side of the main factory building,The unloading hall of the main factory building within the east-west access red line-6.00m hydrophobic expansion box。
Laying method: pipelines are mainly laid overhead、Partial cross-road direct burial laying method,See the pipeline layout diagram for details。Design seabet app diameter: Z01-Z03,Z05-Z06 steam pipeline diameter DN350/DN300/DN250/DN200/DN150/DN100/DN80,The laying length is about 6.2 kilometers。Overhead pipelines use seamless steel pipes,The seabet app material is 20#,Buried pipelines adopt prefabricated direct-buried steel sleeved steel insulated pipes;Condensate seabet app diameter DN125,Using prefabricated direct-buried plastic-sheathed steel insulation pipes,The laying length is about 5 kilometers。
2、Tender scope: Farmland within the scope of the off-site comprehensive pipe network steam pipeline seabet app of Shanfa Longcheng Vein Industrial Park Sludge Resource Disposal seabet app、Green Belt Clearance List、Cooperating with transplanting、Ground leveling and restoration;Pipeline trench excavation and backfilling within the scope of construction drawings、Trough bottom is flat、Cushion laying、Buttress pouring、Road restoration and construction;Pipelines within the scope of the pipe network、Pipe fittings、Valve、Procurement and welding installation of compensators and other ancillary equipment、Anti-corrosion insulation, etc.;On-site safety and civilized protection during seabet app implementation;Pipeline purging、flush、Insulation、Suppression、Debug、Acceptance、Transfer and maintenance work。
5. Tendering agent: Shandong Tendering Co., Ltd.
Place Address: Room 1112, No. 13, Wenhua West Road, Jinan City
Contact person: Zhang Yan, Song Chenggang
Electricity Tel: 0531-81917627、15054101301
Mail Box: sdtc27698@163.com
6. Bidding method: public bidding
seven、Bid opening time: 14:00 pm on August 21, 2024
8. Winning bid candidates:
The first winning bid candidate: Shandong Taiyin Construction Co., Ltd.
The second winning bid candidate: Shandong Jiuhong Construction Group Co., Ltd.
The third winning candidate: Shandong Yitong Installation Co., Ltd.
The above winning bidders will be announced for three days (from August 23, 2024 to 17:00 on August 25, 2024)。During the public announcement period,If the bidder of this seabet app has objections to the content of the announcement,Please submit it in writing to Shandong Tendering Co., Ltd. during the public notice period。
Shandong Development Investment Holding Group Co., Ltd. Copyright 2019 All rights reserved Lu ICP No. 16018610
Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province