1.Tender conditions
The name of this bidding seabet my is: Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt photovoltaic seabet my photovoltaic module equipment procurement public bidding,seabet my bidding number is: 0627-24101871920,The tenderer is: Baiyin Jingtai Development New Energy Co., Ltd.,The seabet my unit is: Baiyin Jingtai Development New Energy Co., Ltd.,The source of funds is self-raised。The bidding agency is: Shandong Tendering Co., Ltd.。This seabet my has met the bidding conditions,The seabet my is now undergoing domestic public bidding。
2. seabet my Overview and Bidding Scope
2.1 Bid segment (package) division:
The public bidding seabet my for the procurement of photovoltaic module equipment for the 350,000 kilowatt photovoltaic seabet my in Jingtai D District of Baiyin Jingtai Development New Energy Co., Ltd. includes 1 bid section (package),That is, Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt photovoltaic seabet my phase one 150MW photovoltaic seabet my、Phase II 100MW photovoltaic seabet my、Phase III 100MW photovoltaic seabet my,Bidders should bid for corresponding complete sets of photovoltaic modules according to seabet my requirements。
2.2 seabet my Overview:
Jingtai D Area 350,000 kilowatt photovoltaic seabet my site is located in Jingtai County, Baiyin City,The seabet my is divided into three phases for registration: Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatts, first phase, 150,000 kilowatts photovoltaic seabet my、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase II 100,000 kilowatt photovoltaic seabet my、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase III 100,000 kilowatt photovoltaic seabet my,The third phase seabet my starts construction simultaneously,Plan to build a 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),The newly built 2-circuit 110kV line is connected to the 110kV side of the newly built Jingtai North 330kV substation supporting the seabet my。
Jingtai Zone D Phase I 150,000 kilowatt photovoltaic seabet my This seabet my is located in Jingtai County, Baiyin City, Longdong Prefecture, Gansu Province,The seabet my installed capacity is 187.5089MWp,Planned to use 320528 pieces of 585Wp monocrystalline N-type bifacial photovoltaic modules,AC side capacity is 150MW。The total land area for this photovoltaic array layout is 567.4218hm2,The production area of the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of this seabet my is divided into 48 sub-arrays,Contains 44 3.3MW power generation unit、2 1MW power generation units、1 1.25 MW power generation unit、1 1.6 MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit is equipped with a 1000kVA box-type transformer;After each box transformer sets the voltage to 35kV,The 35kV power distribution room is sent to the 110kV booster station through cable parallel connection and grouping,A total of 6 collector circuits,The current collection line adopts the laying method of direct buried cable + overhead wire。
The second phase of Jingtai D area 100,000 kilowatt photovoltaic seabet my site is located at about 6 west of Manshuitan Township, Jingtai County.0km,The seabet my installed capacity is 125.011MWp,213,694 585Wp monocrystalline N-type bifacial photovoltaic modules are planned to be used,AC side capacity is 100MW。In this seabet my area and Phase I、One public 110kV booster station will be built in the third phase,Located in this phase of the seabet my。The total land area for this photovoltaic array layout is 344.5222hm2,The production area of the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of this seabet my is divided into 31 sub-arrays,Includes 30 3.3MW power generation unit and 1 1MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit equipped with a 1000kVA box transformer;After each box transformer adjusts the voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi Booster Station through cable parallel connection and grouping。 This seabet my is based on 10% photovoltaic power generation capacity,Energy storage system configured with 4-hour peak shaving capacity,A total of 10MW/40MWh to build an independent power station together with other wind and solar projects of the group,The access system plan is: build a new 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),New 2-circuit 110kV line connected to the 110kV side of 330kV Jingtai North Station 。
Jingtai Phase III 100,000 kilowatt photovoltaic seabet my is located in Jingtai County, Baiyin City, Longdong Region, Gansu Province,The seabet my installed capacity is 125.011MWp,213,694 585Wp monocrystalline N-type bifacial photovoltaic modules are planned to be used,AC side capacity is 100MW。The total land area for this photovoltaic array layout is 304.0164hm2,The production area of the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of this seabet my is divided into 31 sub-arrays,Contains 30 3.3MW generating unit and 1 1MW generating unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit equipped with a 1000kVA box transformer;After each box transformer adjusts the voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi Booster Station through cable parallel connection and grouping,Total 4 collector lines,The current collection line adopts the laying method of direct buried cable + overhead wire。
2.3 Bidding scope: Complete sets of photovoltaic modules required for photovoltaic seabet my procurement (compatible with MC4 connectors、Special Tools、Spare parts、Drawings and information、Transportation、Insurance、On-site guidance and installation、Technical training、Design liaison meeting and factory acceptance, etc.) and the requirements in the smart photovoltaic technical specifications of Baiyin Jingtai Development New Energy Co., Ltd.,and contains control、Design standards for surveillance systems、Technical specifications、Scope of work、Delivery progress and other requirements。For details, please refer to Chapter 5 Supply Requirements。
2.4 The winning bidder must respond to the requirements of the local government where the seabet my is located for industrial development and tax policy needs。
2.5 Others:
①Delivery plan:
Jingtai Zone D Phase I Photovoltaic seabet my: January to March 2025。
Jingtai Zone D Phase II Photovoltaic seabet my: January to March 2025。
Jingtai Zone D Phase III Photovoltaic seabet my: January to March 2025。
The actual delivery time and quantity are subject to the buyer’s written notification.
②Delivery location: The specific delivery location shall be subject to the buyer’s written notification。
3. Bidder qualification requirements
3.1 Qualifications and performance requirements:
[1]Qualification requirements: The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。
[2]Financial requirements:/
[3] Performance requirements: April 2021 to the bidding deadline (subject to the time of contract signing),The bidder must have at least 3 domestic supply contract performance of (monocrystalline bifacial or monocrystalline double glass of 585Wp and above) seabet my modules of 350MW and above。The bidder must provide a contract that can prove the performance requirements of this bidding、Invoices corresponding to the contract (at least 1) and screenshots of the inspection results of the State Administration of Taxation’s invoice inspection platform,The scanned copy of the contract must contain at least: the seal page of the contract between the buyer and the seller、Key information page in contract signing time and performance requirements。If the scanned copy of the contract cannot cover the above information,You also need to provide a scanned copy of the key page of the technical agreement corresponding to the contract or other supporting documents。
[4] Other requirements: Bidders must provide the CQC or CGC or TUV product certification certificate of the solar cell module they invested (the certificate content includes at least the home page、Certified product page and certification page that reflects the product model of this bid)。
3.2 This seabet my does not accept agency bids.
3.3 This seabet my does not accept consortium bids.
4. Obtaining bidding documents
Getting time: August 30, 2024 09:00 to September 03, 2024 17:00;
4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this seabet my after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (register and click on bidding to participate,No need to apply for CA lock)。
4.2 Information required to obtain documents: ①Business license ②Power of attorney of legal representative and ID card of the authorized person、Proof of social security payment in the past 3 months ③Performance contract certification documents and corresponding invoice documents ④Proof of certification of invested products ⑤Remittance voucher for bidding document fees ⑥Bidder information registration form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy (pdf format) of the above information with official seal to sdzb910@163.com,After successful sending, call the agency for review and confirmation。
4.3 Bidding document price: 500 yuan/copy,No refund upon sale (requires business-to-business transfer,Personal transfers are not accepted)。Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330。
4.4 Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。
5. Submission of bid documents and bid opening
Submission deadline: 09:30 on September 19, 2024;
Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。
6. Bid opening time and place
Bid opening time: 09:30 on September 19, 2024;
Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。
7. Media for publishing announcements
This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。
8.Contact information
Tenderer: Baiyin seabet my Development New Energy Co., Ltd.
Place Address: seabet my Department on the third floor of the apartment behind Shuiyunchuan Hotel, Pingchuan District, Baiyin City, Gansu Province
Mail Editor: 730900
Contact person: Xia Weidong
Electricity Word: 13099109557
Email: 1452337444@qq.com
Tendering agency: Shandong Tendering Co., Ltd.
Place Address: No. 13, Wenhua West Road, Lixia District, Jinan City
Mail Editor: 250002
Agency contact: Manager Liu
Agent contact number: 0531-81917677、15069174047
Agent email: sdzb910@163.com
Shandong Development Investment Holding Group Co., Ltd. Copyright 2019 All rights reserved Lu ICP No. 16018610
Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province