seabet mobile
seabet live casino
seabet online casino

seabet io

seabet online sports betting


1.Tender conditions

The name of this bidding project is: Baiyin Jingtai Development New Energy seabet ioCo., Ltd. Jingtai D Zone seabet online casino350,000 kilowatt photovoltaic project photovoltaic module equipment procurement public bidding,Project bidding number is: 0627-24101871920,The tenderer is: Baiyin Jingtai Development New Energy Co., Ltd.,The project unit is: Baiyin Jingtai Development New Energy Co., Ltd.,The source of funds is self-raised。The bidding agency is: Shandong Tendering Co., Ltd.。This project has met the bidding conditions,The project is now undergoing domestic public bidding。

2. Project Overview and Bidding Scope

2.1 Bid segment (package) division:

The public bidding project for the procurement of photovoltaic module equipment for the seabet online casino350,000 kilowatt photovoltaic project in Jingtai D District of Baiyin Jingtai Development New Energy Co., Ltd. includes 1 bid section (package),That is, Baiyin Jingtai Development New Energy seabet ioCo., Ltd. Jingtai D Zone 350,000 kilowatt photovoltaic project phase one 150MW photovoltaic project、Phase II 100MW photovoltaic project、Phase III 100MW photovoltaic project,Bidders should bid for corresponding complete sets of photovoltaic modules according to project requirements。

2.2 Project Overview:

Jingtai D Area seabet online casino350,000 kilowatt photovoltaic project site is located in Jingtai County, Baiyin City,The project is divided into three phases for registration: Baiyin Jingtai Development New Energy seabet ioCo., Ltd. Jingtai D Zone 350,000 kilowatts, phase 1, 150,000 kilowatts photovoltaic project、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase II 100,000 kilowatt photovoltaic project、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase III 100,000 kilowatt photovoltaic project,The third phase project starts construction simultaneously,Plan to build a 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),The newly built 2-circuit 110kV line is connected to the 110kV side of the newly built Jingtai North 330kV substation supporting the project。

Jingtai D Zone Phase I 150,000 kilowatt photovoltaic project. This project is located in Jingtai County, Baiyin City, Longdong Prefecture, Gansu Province,The installed capacity of the project is 187.5089MWp,Planned to use 320,528 pieces of 585Wp monocrystalline N-type bifacial photovoltaic modules,AC side capacity is 150MW。The total land area for this photovoltaic array layout is 567.4218hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 48 sub-arrays,Contains 44 3.3MW power generation unit、2 1MW power generation units、1 1.25 MW power generation unit、1 1.6 MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit is equipped with a 1000kVA box-type transformer;After each box transformer sets the voltage to 35kV,The 35kV power distribution room is sent to the 110kV booster station through cable parallel connection and grouping,6 collector circuits in total,The collector line adopts the laying method of direct buried cable + overhead wire。

The second phase of Jingtai D area 100,000 kilowatt photovoltaic project site is located at about 6 west of Manshuitan Township, Jingtai County.0km,The project installed capacity is 125.011MWp,213,694 585Wp monocrystalline N-type bifacial photovoltaic modules are planned to be used,AC side capacity is 100MW。In this project area and Phase 1、One public 110kV booster station will be built in the third phase,Located in this phase of the project。The total land area for this photovoltaic array layout is 344.5222hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 31 sub-arrays,Includes 30 3.3MW power generation unit and 1 1MW power generation unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit equipped with a 1000kVA box transformer;After seabet live casinoeach box transformer adjusts seabet mobilethe voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi Booster Station through cable parallel connection。 This project is based on 10% photovoltaic power generation capacity,Energy storage system configured with 4-hour peak shaving capacity,A total of 10MW/40MWh to build an independent power station together with other wind and solar projects of the group,The access system plan is: build a new 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),New 2-circuit 110kV line connected to 330kV Jingtai North Station 110kV side 。

Jingtai Phase III 100,000 kilowatt photovoltaic project is located in Jingtai County, Baiyin City, Longdong Region, Gansu Province,The project installed capacity is 125.011MWp,213,694 585Wp monocrystalline N-type bifacial photovoltaic modules are planned to be used,AC side capacity is 100MW。The total land area for this photovoltaic array layout is 304.0164hm2,The production area of ​​the site includes photovoltaic module arrays、Box transformers and maintenance roads, etc.。The photovoltaic area of ​​this project is divided into 31 sub-arrays,Includes 30 3.3MW generating unit and 1 1MW generating unit,3.The 3MW power generation unit is equipped with a 3300kVA box-type transformer,1MW power generation unit equipped with a 1000kVA box transformer;After seabet live casinoeach box transformer adjusts seabet mobilethe voltage to 35kV,Sent to the 35kV power distribution room of the 110kV Hongxi Booster Station through cable parallel connection,Total 4 collector lines,The collector line adopts the laying method of direct buried cable + overhead wire。

2.3 Bidding scope: Complete sets of photovoltaic modules required for photovoltaic project procurement (compatible with MC4 connectors、Special Tools、Spare parts、Drawings and information、Transportation、Insurance、On-site guidance and installation、Technical training、Design liaison meeting and factory acceptance, etc.) and the requirements in the smart photovoltaic technical specifications of Baiyin Jingtai Development New Energy Co., Ltd.,and contains control、Design standards for surveillance systems、Technical specifications、Scope of work、Delivery progress and other requirements。For details, please refer to Chapter 5 Supply Requirements。

2.4 The winning bidder must respond to the requirements of the local government where the project is located for industrial development and tax policy needs。

2.5 Others:

①Delivery plan:

Jingtai Zone D Phase I Photovoltaic Project: January to March 2025。

Jingtai Zone D Phase II Photovoltaic Project: January to March 2025。

Jingtai Zone D Phase III Photovoltaic Project: January to March 2025。

The actual delivery time and quantity are subject to the buyer’s written notification.

②Delivery location: The specific delivery location shall be subject to the buyer’s written notification。

3. Bidder qualification requirements

 3.1 Qualifications and performance requirements:

[1]Qualification requirements: The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

[2]Financial requirements:/

[3] Performance requirements: April 2021 to the bidding deadline (subject to the time of contract signing),The bidder must have at least 3 domestic supply contract performance of (monocrystalline bifacial or monocrystalline double glass of 585Wp and above) photovoltaic modules of 350MW and above。The bidder must provide a contract that can prove the performance requirements of this bidding、Invoices corresponding to the contract (at least 1) and screenshots of the inspection results seabet app downloadof the State Administration seabet ioof Taxation’s invoice inspection platform,The scanned copy of the contract must contain at least: the seal page of the contract between the buyer and the seller、Key information page in contract signing time and performance requirements。If the scanned copy of the contract cannot cover the above information,You also need to provide a scanned copy of the key page of the technical agreement corresponding to the contract or other supporting documents。

[4] Other requirements: Bidders must provide CQC or CGC or TUV product certification certificates for the solar modules they invest in (the certificate content includes at least the homepage、Certified product page and certification page that reflects the product model of this bidding)。

3.2 This project does not accept agency bids.

3.3 This project does not accept consortium bids.

4. Obtaining bidding documents

Getting time:  August 30, 2024 09:00 to September 03, 2024 17:00;

4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for this project after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (register and click on bidding to participate,No need to apply for CA lock)。

4.2 Information required to obtain documents: ①Business license ②Power of attorney of legal representative and ID card of the authorized person、Proof of social security payment in the past 3 months③Performance contract certification documents and corresponding invoice documents④Proof of certification of invested products⑤Remittance voucher for bidding document fees⑥Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy (pdf format) of the above information stamped with the official seal to sdzb910@163.com,After successful sending, call the agency for review and confirmation。

4.3 Bidding document price: 500 yuan/copy,No refund upon sale (requires business-to-business transfer,Personal transfers are not accepted)。Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330。

4.4 Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents and bid opening

Submission deadline: 09:30 on September 19, 2024;

Submission method and address: Paper document submission;seabet clubConference Room on the seabet app download2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on September 19, 2024;

Bid opening location: seabet clubConference Room on the seabet app download2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (https://www.sdbidding.org.cn/home)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Baiyin Jingtai Development New Energy Co., Ltd.

Place    Address: Project Department on the third floor of the rear apartment of Shuiyunchuan Hotel, Pingchuan District, Baiyin City, Gansu Province

Mail    Editor: 730900

Contact person: Xia Weidong

Electricity    Word: 13099109557

Email: 1452337444@qq.com

Tendering agency: Shandong Tendering Co., Ltd.

Place    Address: No. 13, Wenhua West Road, Lixia District, Jinan City

Mail    Editor: 250002

Agency contact: Manager Liu

Agent contact number: 0531-81917677、15069174047

Agent email: sdzb910@163.com 






Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share