The name of this bidding project is Baiyin Jingtai Longlu Development New Energy Co., Ltd. Jingtai South (Ruizhu) 330 kV Substation No. 4 Main Transformer Expansion Project General Contracting (EPC) Project,The tenderer is Baiyin Jingtai Longlu Development New Energy Co., Ltd.,The source of funds is self-raised funds,The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1Project Overview、Bidding scope and bid section (package) division:

2.1.1 Project Overview:

Jingtai South 330 kV substation (named 330 kV Ruizhu substation by dispatch) will be completed and put into operation in December 2023。Long-term planning and construction of main transformer 2×360MVA+2×240MVA、330 kV outlet line 2 times、8 times of 110 kV outlet,The 330 kV power distribution device area adopts single busbar wiring,The 110 kV power distribution device area adopts double bus and double segment wiring,The low voltage side of the main transformer of this site adopts unit wiring,There is no connection between the low-voltage side busbars of each transformer。

The power distribution device area of ​​the substation is arranged for outdoor AIS,The 330 kV power distribution device area is arranged on the north side of the station area,110 kV power distribution device area is arranged on the south side of the station area,The main transformer and 35 kV power distribution device area are arranged in the middle of the station area,SVG dynamic reactive power compensation device is arranged on the west side of the station area,The office and living area is arranged on the east side of the station area。Land acquisition for the substation has been completed according to the final scale,And reserve the No. 4 main transformer and its interval、Related sites for 110 kV outgoing line intervals。

The first phase has been completed with 2×360MVA+1×240MVA seabet casino reviewmain transformer,The first phase of the outgoing line interval has been completed in Xiatan 1、Xiatan 2、Luchengyi、Si Tan North and other four 110 kV outgoing line intervals,The 330 kV outgoing line interval from Ruizhu transformer to Shicheng transformer。

This issue is to meet the demand for new energy power generation projects,It is necessary to reserve space in the Ruizhu 330 kV substation to expand the No. 4 main transformer and its main transformer interval,Expand a 110kV outlet bay (Lucheng 2 110kV outlet bay)。

2.1.2 Bidding scope and bidding section (package) division:

This project is divided into 1 bidding section.

Tender scope:

General Contracting (EPC) Project of Baiyin Jingtai Longlu Development New Energy Co., Ltd. Jingtai South (Ruizhu) No. 4 Main Transformer Expansion Project of 330 kV Substation,Mainly including but not limited to:

(1) Equipment procurement scope: all equipment, materials and services required for the operation of this project,Supervision of all equipment within the procurement scope、Urgent delivery、Transportation、Pick up、Unlucky,See the attachment for the recommended short list of major equipment manufacturers purchased,Including but not limited to: the new No. 4 main transformer capacity in this issue is 240MVA,Configured with 2 sets of ±30MVarSVG dynamic reactive power compensation devices,The neutral point of the main transformer is configured with a 5 ohm small reactance (refer to the first phase configuration,The final approval of system access shall prevail),Construct the high, middle and low voltage side corresponding to the No. 4 main transformer interval 、Secondary equipment、Main transformer fixed fire extinguishing and fire fighting facilities、Cable laying、Lightning protection grounding、Oil chromatography, etc.。

The electrical primary related to the expansion of Lucheng 2 110kV outlet bay in this phase (located in the fourth 110kV outlet bay from west to east of the substation)、Electrical secondary、Communication and other related equipment、Cable laying、Lightning protection grounding, etc.。The 110 kV line project corresponding to the 110 kV interval is not within the scope of this construction,Bounded by the insulator string outside the gantry of the 110kV power distribution device outlet (this insulator string is calculated by the line engineering),But including the leads and fittings of the line side voltage transformer。

(2) Design scope: Design of each stage of this project,Including but not limited to: Equipment Technical Specifications、Construction drawing design (including entrusting a third party to conduct drawing review)、Preparation of as-built drawings;Safety facility design and other special articles、Program preparation;Conduct technical briefing on construction drawings、On-site engineering service work。

(3) Construction scope: The civil construction part includes the new main transformer and the main transformer interval、Electrical primary related to Lucheng 2 110 kV outlet line interval、Basics of secondary equipment、Equipment Stand、Cable Trench、Changping、Water supply and drainage facilities、Firefighting facilities、Grounding projects and ancillary projects, etc.。

(4) Scope of procedures:

① Handling various procedures from the early stage of the project to the project put into operation。All procedures after the approval procedures are completed,That is, all procedures and relationship coordination other than the list of procedures that the contractor has invited for bidding in the attachment (including but not limited to some procedures that need to be supplemented in the early stage but have not been tendered,And various procedures that need to be completed before and after the start of construction),Including but not limited to meteorology (lightning protection)、Energy saving、Firefighting、Quality Supervision、Related grid connection procedures, etc.,Processing various special acceptance and procedures (obtaining relevant documents) and bearing the costs。

②Technical services related to this project,Like factory training、On-site training、Device debugging、Unit trial operation seabet.comand operation and maintenance services during construction period、Electrical equipment warranty service, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electric secondary security protection evaluation、Test、Grid-connected trial operation、Elimination、Acceptance,Handle all construction and safety risks related to the project、Third party liability insurance。Complete acceptance and project handover、Related work for the acceptance of archival materials,And all work and expenses related to the general contracting project。

(5) This issue conducts a special study on the stability control strategy of Ruizhu Variation,According to the approval of Gansu Electric Power Company on the topic of stability control,Upgrade the software and hardware related to stability control of the substation and adjust the strategies,At the same time, jointly debug regional stability control。

3. Bidder qualifications

3.1 General Qualification Requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law within the territory of the People’s Republic of China,Have a valid business license,Has the necessary equipment to perform the contract、Professional technical capabilities and project implementation capabilities,In staff、Equipment、Capacity and other aspects can provide reliable quality assurance and perfect after-sales service。

(2) Have a good record of paying taxes and social security funds in accordance with the law。

(3) No fraudulent bidding or serious breach of contract in the past three years,There are no major or higher quality accidents or major or higher safety accidents caused by its projects as determined by the appraisal department。

3.2 specific qualification requirements:

[1]Qualification requirements:

(1) Requirements for bidder qualifications,The bidder should meet one of the following specified qualifications:

a) Comprehensive Class A qualification in engineering design or engineering design in the electric power industry (power transformation engineering、Power Transmission Engineering) Professional Grade A Qualification;

b) Possess the first-level or above general contracting qualification for power engineering construction issued by the construction administrative department and a valid safety production license and have the decoration (repair) license issued by the National Energy Administration、Trial) Electric Power Facilities Level One License Construction Qualification。

The qualifications and performance of parent and subsidiary companies are not allowed to be borrowed from each other;Any affiliation、Illegal activities such as leasing qualifications,Disqualified from bidding upon discovery,The tenderer reserves the right to pursue legal liability;

[2] Performance requirements: From January 2021 to present, bidders should have at least one general contracting performance (construction or design) of 330kV and above substation projects。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of project completion should be one of the following certificates: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion Acceptance Report;

[3] Financial requirements: Provide financial statements issued by an audit agency or certified public accounting firm from 2021 to 2023;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If established less than three years,Resulting in the inability to provide the above financial seabet betting platformstatements,Provide financial statements issued by audit institutions or certified public accounting firms since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2021 to the present (stamped with the company’s official seal、Customized format);The bidder needs to provide the "China Execution Information Disclosure Network" website (http://zxgk when obtaining documents.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major)。

(2) The proposed project manager must have at least the performance of a general contracting project manager for 330kV and above substation projects,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Project Manager、Completion/operation time and unit name)。At the same time, it is necessary to provide the social security certificate of the project manager who has worked for the bidding unit for three consecutive months in the past six months。

[6] Qualification requirements for the design person in charge (bidders with only construction qualifications are not required at this bidding stage):

(1) The bidder must provide a valid registered electrical engineer (power transmission and transformation major) to be the person in charge of design

(2) The proposed design person in charge must have at least the performance of a 330kV and above substation engineering design person in charge,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Design person in charge、Completion/operation time and unit name)。At the same time, it is necessary to provide the social security certificate of the person in charge of the design who has worked for the bidding unit for three consecutive months in the past six months。

[7] Qualification requirements for the construction leader (bidders with only design qualifications are not required at this bidding stage):

(1) The bidder must provide a valid first-class registered construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major) of the proposed construction leader。

(2) The proposed construction leader must have at least the performance of a general contracting construction manager for 330kV and above substation projects,The bidder must provide supporting documents proving the performance of the construction manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the name of the project、Construction manager、Completion/operation time and unit name)。At the same time, it is necessary to provide the social security certificate of the construction leader who has worked for the bidding unit for three consecutive months in the past six months。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

Illegal subcontracting or subcontracting is not allowed in this project.

3.3 This project does not accept consortium bids.

4. Obtaining bidding documents

Time: 09:00 on September 26, 2024 to 17:00 on September 30, 2024。

4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for the project after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (register and click on bidding to participate,No need to apply for CA lock)。

4.2 Information required to obtain documents: ①Business license、Qualification Certificate、The bidder’s social security and tax payment certificate for any three months from March 2024 to now ②Legal representative’s power seabet myof attorney and authorized person’s ID card、Proof of social security payment of the unit in the past 3 months ③Performance contract and corresponding project completion certification materials ④Financial status statement ⑤Bidder's credibility self-examination commitment and the "China Execution Information Disclosure Network" website (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a dishonest person subject to execution ⑥ Personnel qualification certificate and relevant supporting materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call the agency for review and confirmation。

4.3.Tender document price: 500 yuan/copy,No refund upon sale (requires business-to-business transfer,Personal transfers are not accepted)。Tender document expense account: Company name: Shandong Tendering Co., Ltd.;Account opening bank: Bank of China Jinan Wenhua Road Branch;Bank account number: 227305483177;Line number: 104451038330。

4.4Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 14:00 on October 17, 2024 (Beijing time);

Submission method: Submit paper documents in the conference room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 14:00 on October 17, 2024 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Baiyin Jingtai Longlu Development New Energy Co., Ltd.

Tenderer’s address: 8th Floor, Jinwo Kaidi Building, Baiyin District, Baiyin City, Gansu Province

Contact person of the tenderer: Mr. Zhang

Tenderer’s contact number: 17616758749

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency contact: Manager Liu

Agent contact number: 0531-81917677、15069174047

Agent email: sdzb910@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share