seabet mobile
seabet live casino
seabet online casino

seabet.com

seabet casino review


seabet app

The name of this bidding project is Shandong Green Energy Dongming 100MW Wind Power Project Construction General Contracting,The tenderer is Shandong Green Energy Investment Co., Ltd.,The project unit is Dongming Green Energy New Energy Co., Ltd. (contract signing party),The source of funds is self-raised by the enterprise,The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1 Project Overview

Shandong Green Energy Dongming 100MW wind power project is located in Xiaojing Town, Dongming County, Heze City, Shandong Province、Matou Town、Sanchun Market Town、Dongming Market Town、Within Datun Town。Wind turbines are scattered throughout the project site,Altitude between 60m and 65m。Planned development capacity 150MW,This phase of the project is 100MW。This project plans to install 22 units 4.55MW wind turbine,Connected to the first phase 220kV booster station through four-circuit collector lines,Connected to the State Grid Yule Station through the first phase 220kV transmission line。

2.2 Bid segment (package) division

This project is divided into 1 bidding section.

2.3 Bidding Scope:

Shandong Green Energy Dongming 100MW Wind Power Project Construction General Contracting Project,Mainly including but not limited to:

(1) Equipment procurement scope: all equipment and materials that meet the installation requirements of this project (wind turbines、Tower、After the anchor bolts and other materials are purchased through bidding by the contractor,Perform contract transfer,Included into the management scope of PC general contractor),Including but not limited to: fans、Tower、22 sets (sets) of anchor bolts and box-type transformers;Cables and collector line equipment;Main transformer for the expansion part of the booster station (1 unit)、Power distribution device (220kV incoming line interval and 35kV switch cabinet, etc.)、Reactive power compensation (2 units)、Ground transformer and ground resistance device、Electrical secondary equipment and capacity expansion (including comprehensive automation、Network-related equipment expansion、All software and hardware equipment including booster station video surveillance and fire alarm system expansion, etc. and corresponding technical services,Various equipment, materials and services that meet the technical requirements of smart wind farms in the bidding documents,And supervision of equipment within the procurement scope、Urgent delivery、seabet online sports bettingTransportation、Pick up、Unlucky (including storage yard)、Acceptance of goods (including third-party inspection required by specifications)、Warehousing, etc.。

(2) Construction scope: road engineering of this project (including approach road、Roads within the venue,Including new roads and renovation of old roads、Fixed)、Renovation and later fencing of the wind turbine hoisting platform、Fan foundation and box transformer foundation project、Boost station expansion equipment foundation;Installation, commissioning and commissioning of all electrical equipment (including fans、Tower)、35kV collector line construction project、Boost station electrical equipment installation project (to meet the centralized control requirements of the Green Energy Company)、Boost station fire protection and video surveillance expansion project、Grounding works and ancillary works (extension part);Spanning (crossing) involved in the transportation of large equipment、Relocation line、Demolition、Reinforcement、Coordination, etc.,On-site production、Construction of daily communication line and water and power supply (surrounding ecological environment protection during the process、Protection and management of domestic water sources、Water Conservation、Environmental protection measures guarantee)、Pile foundation inspection、Finished product care;Reclamation project (reclamation deposit shall be paid by the contractor、Refund)、Environmental protection projects and soil and water conservation projects (meet the relevant requirements for approval and acceptance),Coordination and cooperation in land acquisition, construction coordination and various coordination in the process、Acceptance (including files、Environmental protection、Water Conservation、Complete acceptance of fire protection, etc.),And finally deliver the whole process contracting of grid-connected power generation in accordance with the requirements of the contractor。

The scope of this bidding does not include the 220kV transmission line and the opposite station reconstruction project。This part has been completed in the preliminary engineering。

(3) Scope of procedures:

①The whole construction period of the project and the long-term leased forest land、Land、Demolition、Relocation of above-ground and underground lines、Cemetery、Greenhouse、Well、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation, etc.)、Lease fee、Reclamation fee、Coordination、All fees and procedures involved in surface attachments (land transfer fee、Except farmland occupation tax and land use tax)。The contractor’s scope of responsibility includes the construction period and long-term expropriation、Lease coordination fee,As well as construction period and long-term land lease fees,Excluding land transfer fee、All costs involved in land acquisition except farmland occupation tax and land use tax。The scope of land acquisition includes but is not limited to roads、Wind turbine platform and foundation、Collection circuit tower base and working surface、Approach Road、Temporary facilities, etc.。The long-term land lease term includes the construction period and operation period stipulated in the contract,The operation period is considered to be 20 years。

② Various procedures from the early stage of the project to the project put into operation: relocation line、Meteorology (Lightning Protection)、Energy saving、Real Estate Certificate、Construction Land Planning Permit、Project Planning Permit、crossing (drilling) administrative license、Quality Supervision、Grid connection、Environmental Impact Assessment、Water Conservation、Fire protection and other special acceptance and procedures (obtain relevant documents),And bear the expenses。See Appendix 14 for the preliminary procedures entrusted by the contractor,All other procedures shall be completed by the contractor。

③Technical services related to this project,If designed to cooperate、Micro-site selection review、Factory training、On-site training、Device debugging、Unit trial operation、Warranty services for towers and other electrical equipment, etc.。Equipment installation、Debug、Acceptance、Inspection and testing required by power grid companies at all levels、Electricity secondary security protection evaluation、Acceptance、Grid-connected trial operation、Eliminate defects、Acceptance,Handle seabet live casinoall construction and safety risks related to the project、Third party liability insurance。Complete acceptance and project handover、Related work on the acceptance of archive materials,And all work related to general contracting projects。

(4) Tools:

Party B is responsible for purchasing the production operation and maintenance tools necessary for equipment operation and maintenance、Spare parts,Subject to Party A’s final approval。

(5) Other scope of work: including but not limited to: all government coordination、Local relationship processing、Civil Coordination、External coordination and cost payment such as temporary and long-term land acquisition coordination,Equipment procurement for wind power projects、Material Procurement、Transportation and on-site storage management、Construction (including preliminary preparations for construction)、Debug、Complete Acceptance;Temporary and permanent land acquisition procedures and fees (except land transfer fee、All expenses related to land acquisition except farmland occupation tax and land use tax) payment,Excluding preliminary bidding procedures;In all wind farms、Project construction in booster station;Approach Road、Temporary construction road on site、Construction and acceptance of permanent maintenance roads;Installation and debugging of fans and ancillary equipment;Wind turbine generator、Send、Trial operation of substation system、The defect elimination and wind turbine successfully passed 240 hours of grid-connected commercial operation and completion acceptance;Path protocol for collector lines in the field、Construction and acceptance;Construction period engineering insurance;Processing procedures for project start;Processing land procedures;Road、Railway、River、Line、Communication、Following the procedures for crossing (crossing) underground obstacles;Soil and Water Conservation Supervision、Soil and Water Conservation Monitoring;Project acceptance;All special acceptance related to this project (including but not limited to: planning、Energy saving、Firefighting、Environmental protection、Water Conservation、File、Occupational disease hazards, etc.)、Safety and quality supervision, inspection and acceptance、Grid connection and related procedures、Power quality detection、Classification protection assessment and filing、Project data file organization、All work including transfer and special acceptance of files、Transfer and service during the warranty period,And meet the requirements of the contracting party to meet the standard and start production、Passed acceptance by the contractor。Also includes all necessary engineering deficiencies、Material、Spare parts、Special tools for production safety、Consumables and related technical information and personnel training,Various meetings during the construction period,Project data includes but is not limited to process data、Completion Information。

(6) This bidding does not include project supervision, survey and design.

(7) The contractor’s quality of the general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

(8) All income from the electricity sales of this project belongs to Party A.

(9) Procedures encountered during project construction、Coordination、Payment、Work、Acceptance, etc.,Unless the contract clearly stipulates that Party A is responsible,Regardless of whether it is included in the bidding bill of quantities,all belong to the scope of work of Party B。If the bidder cannot respond to all the requirements of the bidding documents,Differences should be clearly stated in a separate document,Otherwise, regardless of whether the content of the bidding document is consistent with the requirements of the bidding document,It is deemed that the bidder has responded to all requirements of the bidding documents。

(10) The warranty period of this project shall comply with relevant national regulations。(The warranty period of the whole fan is 5 years)。

For other details, please refer to the employer’s requirements.

2.4 project duration

Start time: April 30, 2022 (the specific construction period shall be subject to the start date issued by the contractor)。

It is tentatively scheduled that all civil construction parts will be completed before September 10, 2022,Full capacity grid connection by the end of November 30, 2022。

2.5 Epidemic Prevention

According to country、Shandong Province、seabet online sports bettingHeze City and Dongming County Local Government Epidemic Prevention and Control Systems and Requirements,The bidding unit needs to investigate the control requirements of the project location,Develop a special "whole-process epidemic prevention and control system",Guarantee projects continue to advance steadily in accordance with national epidemic prevention requirements。

3. Bidding conditions

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) Bidders should have the following qualifications:

(a) Special-grade qualification for power engineering construction general contracting,Decoration (Repair、Trial) Level 1 Qualification,Engineering design power industry Class A;

(b) Valid safety production license.

(3) The bidder must have and provide effective quality、Environment、Occupational Health and Safety Management System Certification Certificate。

[2]Performance requirements: Bidders should have completed PC general contracting or EPC general contracting performance of at least 400,000 kilowatt wind power projects since January 1, 2016 (the time shall be subject to the completion acceptance time)。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of project completion should be one of the following certificates: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion Certificate、Grid connection certificate、Completion Acceptance Report。

[3] Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2018 to 2020 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2018-2020 audit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2019 to the present (stamped with company seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (mechanical and electrical engineering major)、Valid Class B safety production assessment certificate and senior engineer title。

(2) The proposed project manager must have the performance of at least one PC general contracting or EPC general contracting project manager for wind farms of 48MW and above,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the project name、Project Manager、Completion/completion time and unit name)。At the same time, the social security certificate of the project manager who has worked for the bidding unit for the past one year must be provided。

[6] Qualification requirements for construction leaders:

(1) The bidder must provide the proposed construction responsible person with a valid first-class registered construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major) and a valid Class B safety production assessment certificate。

(2) The construction leader must have at least 2 experiences as the construction leader of wind farms of 48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Construction manager、Completion/completion time and unit name)。

[7] Project management organization and personnel: The bidder must provide the valid "Safety Management Personnel Qualification Certificate" C certificate of the proposed safety person in charge。

[8] Requirements for purchasing goods: The contractor’s subcontracting procurement bidding method and scoring standards are required to be consistent with the PC general contracting bidding methods and scoring standards,The subcontracting bidding plan must be reviewed and approved by the contractor。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1 Time: 09:00 on April 3, 2022 to 17:00 on April 8, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding project completion certification materials ④ Financial status statement ⑤ Bidder's credit self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a person subject to execution for dishonesty ⑥Personnel qualification certificate and relevant certification materials required by the personnel ⑦Tender document fee remittance voucher ⑧Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After sending successfully, call the agency for review and confirmation。

4.2 Bidding document price: 750 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on April 25, 2022 (Beijing time);

Submission method: Conference Room on the Second Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on April 25, 2022 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (//www.sdfztz.com/)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agency Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share