The name of this bidding project is Shandong Development Investment (Jingtai) Laohushan 200,000-kilowatt wind power project general contracting (EPC) project,The tenderer is Shandong Green Energy Investment Co., Ltd.,The source of funds is self-raised funds,The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1Project Overview、Bidding scope and bid section (package) division:

2.1.1 Project Overview:

The supporting new energy base of "Long Power to Shandong" Shandong Development Baiyin Wind and Solar Energy Demonstration Project (Phase I) is located in Baiyin City, Gansu Province,Planned capacity is 3 million kilowatts,The overall project location is Tainan、Jingtai North、Development of four areas in Jingyuan and Pingchuan,The 1.1 million kilowatt new energy projects in Jingtai South area include 500,000 kW photovoltaic projects and 600,000 kW wind power projects。The 600,000-kilowatt wind power project in Shandong Development Investment (Jingtai) Zone A is part of the wind power project in the southern Jingtai area,Includes two wind power site areas,Xiatan 400,000kW project and Laohushan 200,000kW project respectively。

This bidding project is Shandong Development Investment (Jingtai) Zone A Laohushan 200,000 kW project,The terrain of the site is mountainous and hilly terrain,The altitude is between 1670m~3270m,The site area has a large altitude difference。There is G338 National Highway near the wind farm site、G2012 Dingwu Expressway、Wuma Expressway and S201 Provincial Highway pass by,Convenient transportation。

The total installed capacity of this project is 200MW。Planned to install 40 units 5.0MW wind turbine set,Supporting installation of 40 box-type transformers,This project will build a new 110kV booster station,Construct and install two 1000 MVA three-phase double winding power transformers in the booster station。The 110kV side of the 110kV booster station is planned to adopt a single busbar wiring method with simple and clear wiring,Construction of main transformer incoming line 2 times,Outgoing line and busbar protection intervals are 1 each;The 35kV side of the main transformer adopts single busbar wiring,Each transformer is equipped with 1 section of 35kV busbar on the 35kV side,35kV bus connected to the fan incoming line、Reactive power compensation、Energy storage、Grounding transformer and station power supply, etc.;Each seabet appmain transformer low-voltage side is equipped with one set of ±30Mvar SVG reactive power compensation device for each 35kV busbar。The low-voltage side of each main transformer is configured with a total SVG capacity of 30 Mvar。The booster station is connected to the 110kV side of Jingtai South 330kV booster station with one 110kV line,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。

2.1.2 Bidding scope and bidding section (package) division:

This project is divided into 1 bidding section.

Tender scope:

Shandong Development Investment (Jingtai) Laohushan 200,000-kilowatt wind power project survey and design、Purchasing、Construction general contracting project,Mainly including but not limited to:

(1) Equipment procurement scope: all equipment and materials that meet the installation requirements of this project (wind turbines、Tower、After the anchor bolts and other materials are purchased through bidding by the contractor,Perform contract transfer,Included into the management scope of EPC general contractor),Including but not limited to: wind turbine sets and supporting towers/flanges、Box type transformer、Anchor、cable、Collector lines and main transformers in booster stations、Power distribution device、Reactive power compensation、Switch cabinet、Electrical secondary equipment (including comprehensive automation、Network-related equipment、Communication Equipment、Primary frequency modulation equipment, etc.)、All software and hardware equipment including wind power prediction equipment、Firefighting facilities and corresponding technical services,Various equipment, materials and services that meet the technical requirements of smart wind farms in the bidding documents,And supervision of equipment within the procurement scope、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard)、Acceptance of goods、Warehousing, storage, etc.。

(2) Survey and design scope: All survey and design of this project,Including but not limited to: 1:2000 topographic map measurement (including 1:500 topographic map measurement of booster station)、Geological Survey、Hydrology、Micro site selection、Equipment Technical Specification、Construction drawing design、Preparation of as-built drawings;Preparation of a special article on safety facility design;Conduct technical briefing on construction drawings、On-site engineering service work,Excluding 110KV transmission project and opposite station transformation。The bidder must design in accordance with the relevant regulations on wind farm construction of Shandong Green Energy Investment Co., Ltd. and meet the requirements。

(3) Construction scope: road engineering of this project (including approach road、Roads within the venue、Inbound road,Including new roads and old road repairs)、Wind turbine foundation project、Installation, commissioning and trial operation of all equipment (including fans、Tower)、Wind power forecast、35kV collector line construction project、New construction and installation project of a 110kV booster station、Spanning (crossing) involved in the transportation of large equipment、Relocation line、Demolition、Coordination, etc.,Fire protection engineering、Grounding works and ancillary works、Construction of on-site communication engineering and water and power supply (surrounding ecological environment protection during the process、Domestic water source protection and management、Water Conservation、Environmental protection measures guarantee)、Finished product care、Green vegetation restoration project after completion、Environmental Protection Project、Soil and water conservation project (meeting relevant requirements for approval and acceptance),Domestic water and electricity、Coordination of land acquisition and various coordination during construction、Acceptance (including files、Environmental protection、Water Conservation、Complete acceptance of fire protection, etc.),And finally deliver the whole process contracting of grid-connected power generation in accordance with the requirements of the contractor,That is, all related construction contents before the 110kV substation sends out the line。

The scope of this bidding does not include the 110kV transmission line and the opposite station reconstruction project。The dividing point between the 110kV booster Seabetstation and the outgoing line is the insulator string of the first outgoing portal frame line side hanging point in the wall of the booster station,This insulator string belongs to the scope of the contractor。110kV booster station inner door frame and jumpers、The relevant line protection system in the booster station belongs to the contractor's scope of work。System remote control、System communication、Secondary systems such as relay protection and automatic devices,Bounded by the upper incoming terminal of the line optical cable terminal box,The installation and testing of the outgoing line are within the scope of the contractor。Design of the secondary system on the booster station side within the incoming terminal (including optical cable terminal box)、Purchasing、Construction、Install、Debugging, etc. are within the scope of the contractor。

(4) Scope of procedures:

①The whole construction period of the project and the long-term leased forest land、Land、Grassland、Demolition、Relocation of above-ground and underground lines、Cemetery、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation、Forest grassland vegetation restoration fees, etc.)、Reclamation fee、Coordination、All fees and procedures involved in surface attachments (land transfer fee、Except farmland occupation tax and land use tax)。Including construction period and long-term expropriation、Lease coordination fee,As well as construction period and long-term land lease fees,Excluding land transfer fee、All costs involved in land acquisition except farmland occupation tax and land use tax。The scope of land acquisition includes but is not limited to roads、Wind turbine platform and foundation、Collection circuit tower base and working surface、Approach Road、Boost station and pit road、Temporary facilities, etc.。The long-term land lease term includes the construction period and operation period stipulated in the contract,The operation period is considered to be 20 years。

② Various procedures from the early stage of the project to the project put into operation (such as: construction permit,Grid connection, etc.),Relocation line、Meteorology (Lightning Protection)、Energy saving、Firefighting、Quality Supervision、Special acceptance and procedures for grid connection and other special procedures (obtain relevant documents),And bear the expenses。Assist the tenderer to apply for the construction land approval letter、Land planning permit、Project Planning Permit、Real estate certificate, etc.。Please see Appendix 14 for the preliminary procedures entrusted by the contractor,All other procedures shall be completed by the contractor。

③Technical services related to this project,such as micro site selection review、Factory training、On-site training、Equipment debugging、Unit trial operation and operation and maintenance services during construction period、Warranty services for other electrical equipment except wind turbines and towers, etc.。Equipment installation、Debug、Test、Inspection and testing required by power grid companies at all levels、Electricity secondary security protection evaluation、Test、Grid-connected trial operation、Defect elimination、Acceptance,Handle all construction and safety risks related to the project、Third party liability insurance。Complete acceptance and project handover、Related work on the acceptance of archive materials,And all work related to general contracting projects。

(5) Production preparation scope: necessary production tools required for site operation and maintenance、Instrumentation、Insulated tools、Grounding wire facilities and various production preparations。

(6) This bidding does not include project supervision.

(7) Quality of the contractor’s general contracting project、Safety、Construction period、Be fully responsible for cost and environmental protection。

The warranty period of this project shall comply with relevant national regulations (the warranty period of the complete fan is 5 years)。

See Chapter 5 for details.

2.2 Project construction period: Construction start time: April 30, 2022 (the specific construction period shall be subject to the construction start date issued by the contractor),Meet full capacity grid connection conditions by the end of September 2023。

2.3according to country、Gansu Province、Jingtai County local government epidemic prevention control seabet appsystem and requirements,The bidding unit needs to investigate the control requirements of the project location,Develop a special "Epidemic Prevention and Control System for the Whole Process of Construction",Guarantee projects continue to advance steadily in accordance with national epidemic prevention requirements。

3. Bidder qualification requirements

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) The bidder should have the first-level qualification for general contracting of power engineering construction and also have the following qualifications:

a) Engineering design comprehensive qualification Class A;

b) Class A comprehensive engineering survey qualification. 

(3) The bidder must have and provide effective quality、Environment、Occupational Health and Safety Management System Certification Certificate。

[2]Performance requirements: Bidders should have cumulative completion of at least 2 EPC general contracting performance of wind power projects of 48MW and above since January 1, 2018。The bidder must provide a contract that can prove the performance requirements of this bidding and corresponding project completion certification materials,Contract materials must contain at least: page with seals of both parties to the contract、Contract signing date、Contract scope content and key technical parameters and other information;Proof of project completion should be one of the following certificates: State Electricity Regulatory Commission document、Project Start Handover Signature、Transfer of appraisal certificate、Production certificate、Completion certificate、Grid connection certificate、Completion Acceptance Report。

【3】Financial requirements provide financial statements issued by an audit institution or certified public accounting firm from 2018 to 2020;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2018-2020 audit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by audit institutions or certified public accounting firms since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: Bidder’s social credibility self-examination commitment from January 1, 2019 to present (stamped with company seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid registered first-class construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major)。

(2) The proposed project manager must have the performance of at least one EPC general contracting project manager for wind farms of 48MW and above,The bidder must provide supporting documents proving the performance of the project manager,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the project name、Project Manager、Completion/completion time and unit name)。At the same time, the social security certificate of the project manager who has worked for the bidding unit for the past one year must be provided。

[6] Qualification requirements of the design leader:

(1) The bidder must provide a valid survey and design registration practice certificate of the proposed design person in charge。

(2) The design person in charge must have at least 2 working experiences as the design person in charge of EPC general contracting projects for wind farms of 48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the design,It can be a contract or acceptance certificate or user certificate and other stamped materials (the above materials must reflect the project name、Design person in charge、Completion/completion time and unit name)。

[7]Qualification requirements for construction leaders:

(1) The bidder must provide a valid first-class registered construction engineer qualification certificate (construction engineering or mechanical and electrical engineering major) of the proposed construction leader。

(2) The construction leader must have at least 2 experiences as the construction leader of wind farms of 48MW and above,The bidder must provide supporting documents that can prove the performance of the person in charge of the construction,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Construction manager、Completion/completion time and unit name)。

The qualifications and performance of parent and subsidiary companies shall not be borrowed from each other.

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1 Time: 09:00 on April 3, 2022 to 17:00 on April 8, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Performance contract and corresponding project completion certification materials ④ Financial status statement ⑤ Bidder's credit self-examination commitment and the "China Execution Information Disclosure Network" website ( http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty ⑥ Personnel qualification certificate and relevant certification materials required by the personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After sending successfully, call the agency for review and confirmation

4.2 Bidding document price: 750 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on April 26, 2022 (Beijing time);

Submission method: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on April 26, 2022 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (//www.sdfztz.com/)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Mr. Zhou

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com