seabet mobile
seabet live casino
seabet online casino

seabet live casino

seabet my


seabet club

The name of this bidding project is the construction of Shandong green energy, wind and solar integrated centralized operation service platform,The sources of project funds are self-raised funds and bank loans,The tenderer is Shandong Green Energy Investment Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview: The seabet clubconstruction content of Shandong Green Energy Wind and Solar Integrated Centralized Operation Service Platform includes: Shandong Green Energy Investment Co., Ltd. centralized terminal computer room construction and Dongming Phase II 100MW、Data access for two wind farms, Wucheng 100MW and Jilin 500MW wind farms, each with a capacity of 100MW;Software development of operation service platform applications、Installation and Debugging、UAV HD image modeling、System acceptance、After-sales service and other related work。

2.2 Bidding Scope: Business Requirements Scheme Design of Wind and Solar Integrated Centralized Operation Service Platform,Software Development、Transplantation、Test;Software installation、Debugging and system joint debugging with the new energy operation center intelligent operation and maintenance platform and third-party software;Provide on-site training and supporting after-sales services at the implementation site;Undertake the design liaison meeting held at the location of the winning bidder;For the long-term expansion of the implementation location、Upgrade to provide corresponding technical services, etc.。System deployment must be based on centralized construction,Level 2 deployment,Three-level application considerations,Should cover all new energy power stations owned by the company;Can remotely and centrally monitor the operating status of all the company's photovoltaic power stations and wind farm equipment,Equipped to provide 25-year full life cycle data storage for all the company’s new energy power stations;

2.3 Main work contents

(1) Business requirement solution design,Software Development、Transplantation、Test;

(2) Responsible for establishing an intelligent operation and maintenance platform for development and application、Interfaces and data exchange between other application systems;;

(3) Undertake the on-site installation of this system、Debug、Joint debugging and trial operation;

(4) Provide on-site training and supporting after-sales services;

(5) Undertake the design liaison meeting held at the location of the winning bidder;

(6) Provide relevant technology and achievement reports of this project;

(7) Others.

2.4 Project construction time schedule

(1) Demand research

Complete detailed demand research within 15 working days after signing the contract,Optimization demand analysis,Refined system construction time nodes and detailed implementation plan。 

(2) Development and seabet sports bettingimplementation of basic system functions

Complete the development and implementation of the first phase of the basic system functions within 3 months after the contract takes effect。That is, to achieve access to factory and station data,Complete and intelligent operation and maintenance platform、Interface design and data exchange of other application software,The system has and can realize data access to the factory and site、Intelligent operation and maintenance platform、Interface design of other application software,Realize equipment operating status monitoring、Operation Analysis Management、UAV HD image modeling、Intelligent inspection。

(3) Development and implementation of the remaining functions of the system

After the first phase is completed,The development of remaining functions that require customized development should be completed within 6 months after the contract takes effect。

(4) Preliminary acceptance

After all required functions of the application software of this project have been developed and implemented,The contractor will organize preliminary acceptance of the project。

(5) Trial operation and completion acceptance

Enter the 3-month trial operation period after passing the preliminary acceptance。Complete acceptance after trial operation,After passing the completion acceptance,The project is completely handed over to the contractor。

(6) Software delivery location and method

Jinan: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province,On-site delivery。

3. Bidder qualification requirements

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements: Bidders must be registered with the industrial and commercial administration department of the People’s Republic of China,Computer information system integration enterprise with independent legal status and general taxpayer qualifications。

[2] Performance requirements: The bidder has provided at least 1 or more sets of supply performance related to the centralized operation system of the new energy industry since January 1, 2019。(A copy of the contract must be attached and user certification materials must be provided)。

[3] Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2018 to 2020 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the 2018-2020 seabet online casinoaudit report or financial statements cannot be provided,Relevant certificates are required if the company has been established for less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: Bidder’s social credibility self-examination commitment from January 1, 2019 to present (stamped with company seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1.How to participate in the bidding (registration): log in to the supplier system of the Sunshine Procurement Service Platform to participate in the online bidding。For supplier operations, please refer to the home page "Service Center-Operation Guide"。

4.2.Time: 09:00 on April 7, 2022 to 17:00 on April 11, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license ②Power of attorney of legal representative and ID card of the authorized person ③Similar performance contract ④Statement of financial status ⑤Bidder's social credit self-examination commitment and the "China Execution Information Disclosure Network" website (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person ⑥ Bidding document fee remittance voucher ⑦ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy of the above information with the official seal (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After successful sending, call the agency for review and confirmation。

4.3.Tender document price: 500 yuan/copy,No refund upon sale (only seabet live casinobusiness-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd. 

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents and bid opening

Submission deadline: 14:00 on April 27, 2022 (Beijing time);

Submission method: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 14:00 on April 27, 2022 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Tenderer contact person: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share