The name of this bidding project is wind turbine equipment procurement for Shandong Development Investment (Jingtai) 600,000 kilowatt wind power project,The source of project funds is self-raised funds,The tenderer is Shandong Green Energy Investment Co., Ltd.,The project unit is: Baiyin Jingtai Longlu Development New Energy Co., Ltd. (contract signing party)。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Construction location: Jingtai County, Baiyin City, Gansu Province

2.2 bid sections: This project is one bid section,Divided into Xiatan 400MW project、Laohushan 200MW Project;Bidders should bid for the corresponding units separately according to project requirements。

2.3 Project Overview: Shandong Green Energy Xiatan 400MW Wind Farm is located about seabet myseabet sports betting30km south of Jingtai County,The specific location of the site is 103°35 East longitude'42"~104°9'41", north latitude 36°47'37"~37°0'17"between,The altitude of the wind farm area is between 2020m and 2600m,The site area is mountainous terrain。There is S201 provincial road inside the wind farm、S217 Provincial Highway passes by,Convenient external transportation conditions,This phase of the project is 400MW。Installed single machine capacity 4.Wind turbines of 0MW and above,Mixed arrangement can be used,The wheel hub height is not less than 105 meters,Impeller diameter is not less than 180 meters,The number of seats does not exceed 100。

Shandong Green Energy Laohushan 200MW Wind Farm is located in the Laohushan area about 30km southeast of Jingtai County,The specific location of the site is 103°37 East longitude'27.9"~103°57'34.83", north latitude 37°0'23"~37°7'2.45"between,The altitude of the wind farm area is between 2200m and 3270m,The site area is mountainous with complex terrain。There is G2012 Dingwu Expressway in the north of the wind farm,There is S217 highway in the east、S201 Provincial Highway passes by,Convenient transportation conditions,This phase of the project is 200MW。Installed single machine capacity 4.Wind turbines of 0MW and above,Mixed arrangement can be used,The wheel hub height is not less than 105 meters,Impeller diameter is not less than 180 meters,The number of seats shall not exceed 50。(including alternative seats)

Tender scope: Complete sets of wind turbine units required for wind power project procurement (except towers,But with anchor bolt、Cabin and tower、Connecting bolts between tower sections (including test bolts from the same batch)),Elevator (using ladder guide rail elevator,The ladder guide rails are purchased and supplied by the tower factory),Automatic fire protection (including cables in the tower、Lighting system, etc.) and the requirements in the smart wind power technical specifications of Shandong Green Energy Investment Co., Ltd.,and contains control、Design standards for surveillance systems、Technical specifications、Scope of work、Delivery schedule and other requirements。

2.4The winning bidder needs to respond to the local government’s requirements for industrial development and tax policy needs of the local government where the project is located。

Supporting industry requirements:

1、In response to the local government’s requirements for industrial development,Bidders for this bidding must submit a special industrial implementation plan and industrial investment commitment letter in the bidding documents,And sign an investment agreement with the local government after winning the bid,Implement the commitments of the bidding plan,If the first-ranked bid-winning seabet online casinocandidate fails to sign an investment agreement with the local government seabet casino reviewwithin 30 days after the bid-winning notice is issued,The tenderer has the right to terminate the contract as it considers that it has automatically given up the qualification to win the bid,The tenderer can determine other winning candidates as the winning bidder in sequence according to the list of winning candidates proposed by the bid evaluation committee,The bid deposit is not refundable,All consequences arising therefrom shall be borne by Party B。Sign the contract with the tenderer after signing the investment agreement,The commitments of the bidding plan will be specified in the contract,And agree on the corresponding liability for breach of contract。

2、In response to local government’s tax requirements,The winning bidder needs to establish a local sales company,It is agreed that the tax to be paid shall not be less than 2% of the value of the equipment provided by the procurement bidder;If the project is completed,There is a difference in tax payment,The difference will be deducted by the buyer from the property landing acceptance payment。

3、After winning the bid, the industrial supporting plan will be included as an attachment to the contract,And make it clear in the contract between the two parties,Agree on the corresponding liability for breach of contract and the amount of breach of contract。

2.5 Others:

Delivery location: Delivery at the airport or the location designated by the buyer.

Delivery time: Xiatan project: February to July 2023。

Laohushan Project: February to June 2023.

The specific supply plan is subject to the tenderer’s written notice 2 months in advance。                                                         

3. Bidder qualification requirements

3.1 Bidder qualifications, capabilities and credibility requirements:

[1]Qualification requirements:

(1) The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

(2) The bidder must have and provide a valid quality management system certification certificate。

[2]Performance requirements: 

(1) Have more than 200 (inclusive) onshore wind turbines、4.Achievements in contract orders for wind turbines with capacity levels above 0MW (inclusive) or with more than 100 (inclusive) units、5.240-hour trial operation performance of wind turbines with capacity levels above 0MW。

(2) As of the end of 2020, the bidder’s cumulative installed capacity in China is more than 1,000 kilowatts (inclusive) (the installed capacity is subject to the data publicly announced by the China Wind Energy Association)。

The bidder must provide a scanned copy of the performance contract and the corresponding scanned copy of the user certificate that can prove the requirements of this bidding。The scanned copy of the contract must be clearly legible and contain at least: the seal page of the contract between the buyer and the seller、seabet loginContract signing date、Material name, model, quantity, key technical seabet mobileparameters and other information;User certificate is 240 hours trial operation certificate。

[3] Financial requirements: Financial statements issued by an auditing agency or certified public accounting firm from 2018 to 2020 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the company has been established for less than three years,Unable to provide the 2018-2020 audit report or financial statements,Financial statements issued by an audit agency or certified public accounting firm since the company’s establishment are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided)。

[4] Credibility requirements: The bidder’s social credibility self-examination commitment from January 1, 2019 to the present (stamped with company seal);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

[5]Other requirements: The model the bidder has invested in has obtained the design certification report (including the component certification part) and the type certification report (including the component certification part) issued by the authoritative organization。If the type certification report is not obtained when bidding,Must promise to obtain before supply。

Note: The qualifications and performance of parent and subsidiary companies are not allowed to be borrowed from each other.

3.2 This project does not accept consortium bids.

3.3 This project does not accept agency bids.

4. Obtaining bidding documents

4.1. Time:  April 26, 2022 09:00 to May 5, 2022 17:00,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、System certification certificate ② Power of attorney of legal representative and ID card of the authorized person ③ Performance contract certification documents and corresponding user certification documents、Documents proving the cumulative installed capacity in China, ④ financial position statement, ⑤ bidder’s social credibility self-examination commitment and the "China Execution Information Disclosure Network" website (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to enforcement for dishonesty ⑥ Design certification report and type certification report (if the type certification report is not obtained when bidding,A letter of commitment must be obtained before supply。) ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,seabet loginIncluding bidder’s name、Contact、Contact information、seabet appBasic information such as email address。

The bidder shall send a scanned copy (pdf format) of the above information with official seal to sdzb1110@163.com,After successful sending, call the agency for review and confirmation。

4.2.Tender document price: 500 yuan/copy,No refund upon sale (requires business-to-business transfer,Personal transfers are not accepted)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd. 

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents and bid opening

Submission deadline: 09:30 on May 23, 2022;

Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on May 23, 2022;

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。

8. Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share