1. Bidding conditions
The name of this bidding seabet club is Shandong Development Investment Silver 900,000 kilowatt new energy seabet club design,The source of seabet club funds is self-raised funds。The tenderer is Shandong Green Energy Investment Co., Ltd.,The seabet club unit is: Baiyin Jingtai Longlu Development New Energy Co., Ltd.、Baiyin Development Investment New Energy Co., Ltd. (Contract Signing Party)。This seabet club has met the bidding conditions,The current bidding method is public bidding。
2. seabet club Overview and Bidding Scope
2.1Project Overview、Bidding scope and bid section (package) division:
seabet club Overview: Shandong Development Investment Baiyin 900,000 kilowatt new energy seabet club is mainly located in Jingtai County, Baiyin City, Gansu Province,Including 500,000 kilowatt photovoltaic seabet club in Jingtai South area、400,000 kilowatt wind power seabet club in southern Jingtai,The overall seabet club site area is approximately 278km2。
The 500,000-kilowatt photovoltaic seabet club in Jingtai South Area is part of the photovoltaic seabet club in Shandong Development Investment (Jingtai) Area B. The 500,000-kilowatt photovoltaic seabet club in Jingtai South Area,The seabet club is located in Jingtai County, Baiyin City, Gansu Province,Divided into 6 photovoltaic field areas,Respectively: Chengbei Dun、Five Buddhas、Luyang、Lucheng、Temple Beach North、Duanjiajing site,The DC side installed capacity of the Chengbeidun 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;Wufo 150MW photovoltaic seabet club DC side installed capacity is 183.30624 MWp,AC side installed capacity is 150MW;The DC side installed capacity of Luyang 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;The DC side installed capacity of Lucheng 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;The DC side installed capacity of Sitanbei 150MW photovoltaic seabet club is 183.30624 MWp,AC side installed capacity is 150MW;The DC side installed capacity of Duanjiajing 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW。The overall terrain of the seabet club area is relatively flat,There is G338 national highway nearby、G2012 Dingwu Expressway、Wuma Expressway and S201 Provincial Highway pass by,Convenient transportation。
The 400,000 kW wind power seabet club in the southern Jingtai area is the Xiatan 400,000 kW wind farm,The seabet club is located in Xiquan Town, Jingtai County, Baiyin City, Gansu Province,The altitude is between 2020m~3270m,The site area has a large altitude difference。There are G338 national highways near each wind farm site、G2012 Dingwu Expressway、Wuma Expressway and S201 Provincial Highway pass by,Convenient transportation。
The installed capacity of this seabet club is 900,000 kilowatts,Including 500,000 kilowatt photovoltaic projects and 400,000 kilowatt wind power projects,A total of 5 new 110kV booster stations will be built (one new 110kV booster station for every 150,000 or 200,000 capacity)。
Bidding scope and bid section (package) division: This seabet club is divided into 1 bid section
Tender scope: all engineering design and on-site installation services,Includes: seabet club estimate for the 900,000kW new energy seabet club in this bidding section、Micro site selection、Preliminary design (including analysis of scenery resources、Comparison and selection of wind turbines and photovoltaic modules)、Equipment Technical Specification、Construction drawing design、Preparation of as-built drawings;Compilation of special articles on safety facility design、Conduct technical briefing on construction drawings、On-site labor service、Design summary (one year after the unit was put into production,Carry out seabet club design summary work,Summary of the advantages and lessons learned from engineering design,Refining optimization design results,Focus on wind resource assessment、Wind farm microsite selection、Equipment selection、Fan foundation design、Road Optimization、Collection circuit、Boost station design、Wind turbine lightning protection grounding design、Special summary of wind farm monitoring and control, etc.);Prepare bidding documents and bill of quantities (seabet club、Equipment and materials, etc.)、Participate in bid evaluation and contract negotiation、Provide necessary documents and information to the tenderer。
The bidder must seabet club in accordance with the relevant regulations on wind farm construction of Shandong Green Energy Investment Co., Ltd. and meet the requirements。
Contract division: After winning the bid, it will be contracted with Baiyin Jingtai Longlu Development New Energy Co., Ltd. (Jingtai South Area 500,000 kilowatt photovoltaic seabet club、Jingtai South Area 400,000 kilowatt wind power seabet club) signed contract,After the survey, surveying and mapping bidding is completed, it will be transferred to the design unit for management。
Contract signing party | seabet club name | seabet club scale | seabet club location |
Baiyin Jingtai Longlu Development New Energy Co., Ltd. | Chengbeidun 50MW Photovoltaic seabet club | 50MW | Jingtai County, Baiyin City, Gansu Province |
Five Buddhas 150MW Photovoltaic seabet club | 150MW | Jingtai County, Baiyin City, Gansu Province | |
Luyang 50MW Photovoltaic seabet club | 50MW | Jingtai County, Baiyin City, Gansu Province | |
Lucheng50MW Photovoltaic seabet club | 50MW | Jingtai County, Baiyin City, Gansu Province | |
Temple Beach North 150MW Photovoltaic seabet club | 150MW | Jingtai County, Baiyin City, Gansu Province | |
Duanjiajing 50MW Photovoltaic seabet club | 50MW | Jingtai County, Baiyin City, Gansu Province | |
Xiatan 40 10,000 KW Wind farm | 400MW | Xiquan Town, Jingtai County, Baiyin City, Gansu Province |
3. Bidder qualification requirements
3.1The bidder is a unit or other organization with independent legal personality registered in the People’s Republic of China,The business scope of the enterprise business license includes content related to this seabet club,Must have corresponding seabet club performance capabilities,And in staff、Equipment、Have the ability to undertake bidding projects in terms of funds and other aspects;
3.2The bidder should also have the comprehensive Grade A qualification for engineering seabet club issued by the construction authority、Comprehensive Grade A Qualification for Engineering Survey;
3.3 Credibility requirements: The bidder’s commitment to self-examination of social credibility from January 1, 2019 to the present (stamped with the company’s official seal);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。;
3.4Performance requirements: from January 1, 2017 to present,The bidder must have the survey and design performance of three wind power projects of 200MW and above and the survey and design performance of three photovoltaic projects of 100MW and above (the time shall be subject to the time of contract signing,If the copy of the contract cannot identify the signing time and/or seabet club capacity, it will not be approved)。
3.5Financial status: Provide financial statements issued by audit institutions or certified public accounting firms from 2018 to 2020;(need to include balance sheet、Cash flow statement、Copy of income statement),If established less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by audit institutions or certified public accounting firms since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement)。
3.6 seabet club staff:
(1) Design chief: comprehensive management、Coordinated Photovoltaics、Wind power seabet club design work。Must have more than 10 years of engineering design experience,And has served as the main person in charge of the design of at least three wind power or photovoltaic engineering projects of 100MW and above。
(2) seabet club Manager (General Manager): Must have more than 10 years of engineering design experience,And has served as the main person in charge of the design of at least three wind power or photovoltaic engineering projects of 100MW and above。The 500,000-kilowatt photovoltaic and 400,000-kilowatt wind power projects have separate seabet club design offices (if concurrently serving),Requires separate photovoltaics、Performance of the main person in charge of the design of wind power projects)。
(3) Main designers: must have more than 5 years of engineering seabet club experience,And have participated in the seabet club of at least 2 wind power or photovoltaic engineering projects of 100MW or above。
3.7Others: The bidder should have no bad record of contract performance and safe and civilized construction,No adverse litigation record,No record of being punished for violations in bidding activities。
3.8Consortiums are not accepted in this tender。Unless required by the owner,This seabet club design does not allow subcontracting。
4. Obtaining bidding documents
4.1.How to participate in the bidding (registration): log in to the supplier system of the Sunshine Procurement Service Platform to participate in the online bidding。For supplier operations, please refer to the home page "Service Center-Operation Guide"。
4.2Time: April 27, 2022 09:00 to May 5, 2022 17:00,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license ②Qualification certificate ③Legal representative’s power of attorney and authorized person’s ID card ④The bidder’s social credit self-examination commitment and the "China Execution Information Disclosure Network" website (http:// zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person ⑤Similar seabet club performance contract ⑥Financial status statement ⑦Relevant supporting materials required by seabet club personnel ⑧Tender document fee remittance voucher ⑨Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。
The bidder shall send a scanned copy of the original documents or a scanned copy of the official seal (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After successful sending, call the agency for review and confirmation。
4.3.Tender document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。
Tender document expense account: Company name: Shandong Tendering Co., Ltd.
Account opening bank: Bank of China Jinan Wenhua Road Branch
Bank account number: 227305483177
Line number: 104451038330
4.4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。
5. Submission of bid documents
Submission deadline: 14:00 on May 25, 2022;
Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。
6. Bid opening time and place
Bid opening time: 14:00 on May 25, 2022;
Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。
7. Media for publishing announcements
This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。
8. Contact information
Tenderer: Shandong Green Energy Investment Co., Ltd.
Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province
Contact person of the tenderer: Zhou Ruotong
Tenderer’s contact number: 0531-86195997
Agency: Shandong Tendering Co., Ltd.
Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City
Agent Contact: Li Gong
Agent contact number: 0531-81917677、18763988068
Agent email: sdzb1110@163.com