The name of this bidding project is Shandong Green Energy Investment Co., Ltd. Heze 200,000 kilowatt wind power project equipment supervision service,The source of project funds is self-raised funds,The tenderer is Shandong Green Energy Investment Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview

Shandong Green Energy Investment Heze 200,000-kilowatt wind power project is located in Dingtao County and Dongming County, Heze City, Shandong Province,The 200,000-kilowatt project consists of three projects,Dingtao 50MW wind power project、Dongming Phase I 50MW and Dongming Phase II 100MW Wind Power Project,Where:

1) Dingtao 50MW wind power project is located in Rantan Town, Dingtao District、Nanwangdian Town、In Maji Town,The wind farm site area is about 30km2。The project site range is about 27km from east to west,North and South 8km,There is highway G35 near the venue、Lancao Expressway (under construction) and Provincial Highway S351、S259、S261,There is also a road connecting the village to the outside world,The altitude is between 45m~55m。

The construction scale of this project seabet myis 50MW,A total of 5 wind turbine units with a single unit capacity of 3600kW and 8 units with a single unit capacity of 4000kW (13 units in total) are installed。13 wind turbines are connected to the established 110/35kV step-up substation through 2 35kV collector lines, 35kV incoming line interval。A new 110kV booster station has been built in the preliminary project,A 50MW main transformer and corresponding 110kV/35kV intervals have been built at the booster station,In this phase, a 50MW main transformer and corresponding 110kV/35kV intervals will be expanded。Main electrical wiring: The 110kV side is expanded from line transformer group wiring to single busbar wiring in this phase,Newly build a 50MW main transformer,The 50MVA main transformer on the 35kV side adopts single busbar segmented wiring。

2) Dongming 50MW wind power project is located in Xiaojing Town, Dongming County, Heze City, Shandong Province、Matou Town、Within Sanchun Market Town。Wind turbines are scattered throughout the project site,Altitude between 60m and 65m。Planned development capacity 150MW,This phase of the project is 50MW。This project plans to install 13 units 3.85MW wind turbine,It is planned to build a 220kV booster station,Voltage level is 220/35kV。

The construction scale of this project is 50MW,A total of 13 units installed with a capacity of 3.85MW wind turbine unit。Project equipment covers wind turbines、Tower (including tower bolts、Anchor bolts and other supporting tools)、Box type transformer、cable、Collector lines and main transformers in booster stations、Power distribution device (including 220kV、35kV、400V)、Reactive power compensation、Grounding transformer, station transformer and grounding resistance device、Construction transformer、Electrical secondary equipment (including comprehensive automation、Network-related equipment、Communication Equipment、Primary frequency modulation equipment、DC and uninterruptible power supply system equipment, etc.)、All software and hardware equipment including wind power prediction equipment。

3) Dongming 100MW wind power project is located in Xiaojing Town, Dongming County, Heze City, Shandong Province、Matou Town、Sanchun Market Town、Within Dongming Market Town and Datun Town。Wind turbines are scattered throughout the project site,Altitude between 60m and 65m。Planned development capacity 150MW,This phase of the project is 100MW。This project plans to install 22 units 4.55MW wind turbine,Connected to the 220kV booster station built in the first phase,Voltage level is 220/35kV。

The construction scale of this project is 100MW,A total of 22 units installed with a capacity of 4.55MW wind turbine unit。Project equipment covers wind turbines、Tower (including tower bolts、Anchor bolts and other supporting tools)、Box type transformer、cable、Collector lines and main transformers in booster stations、Power distribution device (including 220kV、35kV、400V)、Reactive power compensation、Grounding transformer, station transformer and grounding resistance device、Construction transformer、Electrical secondary equipment (including comprehensive automation、Network-related equipment、Communication Equipment、Primary frequency modulation equipment、DC and uninterruptible power supply system equipment, etc.)、All software and hardware equipment including wind power prediction equipment。

2.2 Bidding scope and division of bid sections (packages)

This project is a bidding section,Divided into Dingtao 50MW wind power project、Dongming Phase I 50MW Wind Power Project 、Dongming Phase II 100MW Wind Power Project;Bidders should quote prices separately for the three items,The total price of the three projects shall not exceed the bidding control price。

Project 1: Dingtao 50MW wind power project

Project equipment supervision service bidding scope,Including but not limited to: 13 hosts involved in the project (5 units with a single machine seabet betting platformcapacity of 3.6MW and 8 units 4.0MW (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Key manufacturing supervision of power cables and other equipment and materials、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

Project 2: Dongming Phase I 50MW Wind Power Project     

Project equipment supervision service bidding scope,Including but not limited to: single machine capacity involved in the project 3.13 85MW main engines (including engine room、wheel hub、Blade)、Tower、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Key manufacturing supervision of power cables and other equipment and materials、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

Project 3: Dongming Phase II 100MW Wind Power Project

Project equipment supervision service bidding scope,Including but not limited to: single machine capacity involved in the project 4.22 55MW main engines (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Key manufacturing supervision of power cables and other equipment and materials、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.3 Service Period

Project 1: The planned service period is 6 months (from the beginning of supervision until the completion of supervision of all equipment,The specific date shall be subject to the written notice of the tenderer)。

Project 2: The planned service period is 6 months (from the start of supervision until the completion of supervision of all equipment,The specific date shall be subject to the written notice of the tenderer)。

Project 3: The planned service period is 6 months (from the start of supervision until the completion of supervision of all equipment,The specific date shall be subject to the written notice of the tenderer)。

3. Bidder qualification requirements

3.1、The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided;

3.2、The bidder must have the CNAS17020 inspection and accreditation qualification issued by the China National Accreditation Service for Conformity Assessment (the inspection scope of the attachment must include "wind power" or "wind power generation" related equipment);

3.3、The bidder should be equipped with no less than 20 project director engineers and various professional equipment supervision engineers,Both are in employment status,The project director engineer must have similar practical supervision experience for no less than 5 years,Participated in no less than 3 similar projects at the same time;

3.4、Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2018 to 2020 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the company has been established for less than three years,Unable to provide the 2018-2020 audit report or financial statements,Need to provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided);

3.5、Reputation requirements: The bidder’s social credibility self-examination commitment from January 1, 2019 to the present (stamped with the company’s official seal、Customized format);Bidders need to seabet loginprovide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

3.6、Performance requirements: April 1, 2019 to present (subject to the time of contract signing),The bidder must provide at least 3 or more projects with similar wind power equipment supervision performance (note: the contract performance must include at least the wind power main engine、Blade、Supervision of tower type 3 equipment),And each contract should list the execution performance list (specific to the project name、Equipment type and quantity),Performance contract certification documents must include the contract cover page、Main work content or technical agreement、Contract signature page、Signing time,Performance certification documents that are not provided in accordance with the above requirements will be deemed invalid。

4. Obtaining bidding documents

4.1.Time: 09:00 on May 13, 2022 to 17:00 on May 17, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ①Business license、Qualification certificate ② Authorization letter of legal representative and ID card of the authorized person ③ Statement of financial status ④ Performance contract certification documents ⑤ Bidder’s credit self-examination commitment and the "China Execution Information Disclosure Network" website (http://zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a dishonest person subject to execution ⑥ Relevant certification materials required by project personnel ⑦ Bidding document fee remittance voucher ⑧ Bidder information registration form,Customized format,Including bidder’s name、Contact、Contact information、Basic information such as email address。

The bidder shall send the original or scanned copy of the above information (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After sending successfully, call the agency for review and confirmation。

4.2.Tender document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document fee account:

Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.3.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on June 2, 2022 (Beijing time);

Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on June 2, 2022 (Beijing time);

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。

8.Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com