Shandong Development Investment Baiyin 900,000 kilowatt new energy seabet club survey and bidding announcement

Category: Notices and Announcements Release Time: 2022-05-20 Number of Viewers:0 Share


1. Bidding conditions

Shandong Development Investment Baiyin 900,000 kilowatt new energy seabet club survey,The source of seabet club funds is self-raised funds。The tenderer is Shandong Green Energy Investment Co., Ltd.,The seabet club unit is: Baiyin Jingtai Longlu Development New Energy Co., Ltd.、Baiyin Development Investment New Energy Co., Ltd. (Contract Signing Party),This seabet club has met the bidding conditions,The current bidding method is public bidding。

2. seabet club Overview and Bidding Scope

seabet club overview: Shandong Development Investment Baiyin 900,000 kilowatt new energy seabet club is mainly located in Jingtai County, Baiyin City, Gansu Province,Including 500,000 kilowatt photovoltaic seabet club in Jingtai South area、400,000 kilowatt wind power seabet club in southern Jingtai area,The overall seabet club site area is approximately 278km2。

The 500,000 kilowatt photovoltaic seabet club in Jingtai South Area is part of the 500,000 kilowatt photovoltaic seabet club in Shandong Development Investment (Jingtai) Area B,The seabet club is located in Jingtai County, Baiyin City, Gansu Province,Divided into 6 photovoltaic field areas,Respectively: Chengbei Dun、Five Buddhas、Luyang、Lucheng、Temple Beach North、Duanjiajing site,The DC side installed capacity of the Chengbeidun 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;Wufo 150MW photovoltaic seabet club DC side installed capacity is 183.30624 MWp,AC side installed capacity is 150MW;The DC side installed capacity of Luyang 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;The DC side installed capacity of Lucheng 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW;The DC side installed capacity of Sitanbei 150MW photovoltaic seabet club is 183.30624 MWp,AC side installed capacity is 150MW;The DC side installed capacity of Duanjiajing 50MW photovoltaic seabet club is 61.10208 MWp,AC side installed capacity is 50MW。The overall terrain of the seabet club area is relatively flat,There is G338 national highway nearby、G2012 Dingwu Expressway、Wuma Expressway and S201 Provincial Highway pass by,Convenient transportation。

The 400,000-kilowatt wind power seabet club in the southern Jingtai area is the Xiatan 400,000-kilowatt wind farm,The seabet club is located in Xiquan Town, Jingtai County, Baiyin City, Gansu Province,The altitude is between 2020m~3270m,The site area has a large altitude difference。There are G338 national highways near each wind farm site、G2012 Dingwu Expressway、Wuma Expressway and S201 Provincial Highway pass by,Convenient transportation。

The installed capacity of this seabet club is 900,000 kilowatts,Including 500,000 kilowatt photovoltaic projects and 400,000 kilowatt wind power projects,A total of 5 new 110kV booster stations will be built (one new 110kV booster station for every 150,000 or 200,000 capacity)。

Bidding scope and bid section (package) division: This seabet club is divided into 1 bid section

Bidding scope: Engineering geological survey of this phase (including wind turbine area、Photovoltaic field area (including test piles)、Collection line area、110kV booster station area)、Surveying and mapping (the topographic map of the entire wind farm area is surveyed and mapped at a scale of 1:2000,The topographic map of the photovoltaic field is mapped according to the scale of 1:500;Wind farm road、Wind turbine platform、The surveying and mapping ratio of the booster station site area is 1:500)、On-site installation service,Participate in contract negotiations、Provide necessary documents and information to the tenderer。

Contract division: After winning the bid, it will cooperate with Baiyin Jingtai Longlu Development New Energy Co., Ltd. (Jingtai South Area 500,000 kilowatt photovoltaic seabet club、Jingtai South Area 400,000 kilowatt wind power seabet club) signed contract。After signing the contract,Move to design unit for management。

Contract signed by: Baiyin Jingtai Longlu Development New Energy Co., Ltd.;seabet club name: Chengbeidun 50MW photovoltaic seabet club (Scale: 50MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Wufo 150MW photovoltaic seabet club (Scale: 150MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Luyang 50MW photovoltaic seabet club (Scale: 50MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Lucheng 50MW photovoltaic seabet club (Scale: 50MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Si Tan North 150MW photovoltaic seabet club (Scale: 150MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Duanjiajing 50MW photovoltaic seabet club (Scale: 50MW),seabet club location: Jingtai County, Baiyin City, Gansu Province;seabet club name: Xiatan 400,000 kilowatt wind farm (Scale: 400MW),seabet club location: Xiquan Town, Jingtai County, Baiyin City, Gansu Province。

3. Bidder qualification requirements

3.1The bidder is a unit or other organization with independent legal personality registered in the People's Republic of China,The business scope of the enterprise business license includes content related to this seabet club,Must have corresponding seabet club performance capabilities,And in staff、Equipment、Ability to undertake bidding projects in terms of funds and other aspects;

3.2The bidder should have the Class A comprehensive engineering survey qualification issued by the construction authority,And also have a Class B or above surveying and mapping qualification certificate (the professional scope must include engineering surveying、Geographic Information Systems Engineering),And also has the geological disaster qualification survey issued by the Ministry of Natural Resources、Design、Hazard Assessment Class A Certificate;

3.3 Credibility requirements: The bidder’s commitment to self-examination of social credibility from January 1, 2019 to the present (self-made format,With official company seal);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty;

3.4Performance requirements: From January 1, 2017 to the present, complete three major surveys of wind power\photovoltaic projects with a capacity of 100MW and above、Similar performance in surveying and mapping work (time is subject to the time of contract signing),Or have undertaken key national large-scale infrastructure projects (such as highways、Railway、Large comprehensive parks, etc.)。

3.5 Financial status: Provide financial statements issued by audit institutions or certified public accounting firms from 2018 to 2020;(need to include balance sheet、Cash flow statement、Copy of income statement),If established less than three years,Resulting in the inability to provide the above financial statements,Provide financial statements issued by an audit agency or certified public accounting firm since the company’s establishment;(need to include balance sheet、Cash flow statement、Copy of income statement)。

3.6 seabet club staff:

(1) General person in charge of survey: comprehensive management、Coordinated Photovoltaics、Wind power seabet club survey work。Must have more than 10 years of engineering design experience,And has served as the main person in charge of the survey of at least 3 wind power or photovoltaic engineering projects with a scale of 100MW and above。

(2) seabet club manager (person in charge of exploration): must have more than 10 years of engineering exploration experience,And have served as the main person in charge of the investigation of at least 3 or more 100MW wind power/photovoltaic engineering projects of equal or larger scale。

(3) Main survey personnel: must have more than 5 years of engineering survey experience,And have participated in at least 2 wind power/photovoltaic engineering seabet club surveys of 100MW or above scale,Or have undertaken more than 2 national key roads、Bridge、Industrial and civil construction seabet club survey。

3.7Others: The bidder should have no bad record of contract performance and safe and civilized construction,No adverse litigation record,No record of being punished for violations in bidding activities。

3.8Consortiums are not accepted in this tender。Unless requested by the owner,No subcontracting or subcontracting is allowed during the survey of this seabet club。

4. Obtaining bidding documents

4.1.How to participate in the bidding (registration): log in to the supplier system of the Sunshine Procurement Service Platform to participate in the online bidding。For supplier operations, please refer to the home page "Service Center-Operation Guide"。

4.2.Time: 09:00 on May 21, 2022 to 17:00 on May 25, 2022,(Beijing time,Except legal holidays),Information required to obtain documents: ① Business license ② Qualification certificate ③ Power of attorney of legal representative and authorized person’s ID card ④ Bidder’s social credit self-examination commitment and the "China Execution Information Disclosure Network" website (http:// zxgk.court.gov.cn/shixin/) Screenshot of the webpage to check whether the unit is a dishonest person ⑤Performance contract certification documents ⑥Financial status statement ⑦Relevant certification materials required by seabet club personnel ⑧Tender document fee remittance voucher ⑨Bidder information registration form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。

The bidder shall send a scanned copy of the original documents or a scanned copy of the official seal (the picture must be clear and legible) (pdf format) to sdzb1110@163.com,After successful sending, call the agency for review and confirmation。

4.3.Tender document price: 500 yuan/copy,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。

Tender document expense account: Company name: Shandong Tendering Co., Ltd.

Account opening bank: Bank of China Jinan Wenhua Road Branch

Bank account number: 227305483177

Line number: 104451038330

4.4.Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 14:00 on June 10, 2022;

Submission method and address: Paper document submission;Conference Room on the 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 14:00 on June 10, 2022;

Bid opening location: Conference Room on the 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com)。

8. Contact information

Tenderer: Shandong Green Energy Investment Co., Ltd.

Tenderer’s address: Building 108, Guohua Dongfangmei County, Jinan City, Shandong Province

Contact person of the tenderer: Zhou Ruotong

Tenderer’s contact number: 0531-86195997

Agency: Shandong Tendering Co., Ltd.

Agent address: No. 13, Wenhua West Road, Lixia District, Jinan City

Agent Contact: Li Gong

Agent contact number: 0531-81917677、18763988068

Agent email: sdzb1110@163.com





Shandong Development Investment Holding Group Co., Ltd. Copyright 2019 All rights reserved Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province

Share