Shandong Development Investment (Jingtai) Zone A 400,000 kilowatt wind power project、Zone F 200,000 kilowatt wind power project、200,000 kilowatt photovoltaic projects in Lucheng, District B、The equipment supervision service project of the 330kV substation project in Fangcao Village, Luyang Town has been approved by the project approval/approval/recording authority,The source of project funds is self-raised funds,The tenderer is Baiyin Jingtai Longlu Development New Energy Co., Ltd.。This project has met the bidding conditions,The current bidding method is public bidding。

2. Project Overview and Bidding Scope

2.1 Project Overview

2.1.1 Overview of the 400,000-kilowatt wind power project in Jingtai Area A

The total installed capacity of this project is 400MW。This project plans to install 72 units 5.56MW wind turbine,Supporting installation of 72 box-type transformers,This project will build a new 110kV booster station,110kV booster station installs four 150MVA three-phase three-winding power transformers。In this phase, three 150MVA main transformers will be constructed and the installation position of one 150MVA main transformer will be reserved。This station is connected to Seabetthe 110kV side of seabet ioJingtai South 330kV booster station with 2 circuits of 110kV lines,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。110kV electrical main wiring: adopting the form of "one station and two stations",Set two 110kV power distribution devices with single busbar connections in the booster station;The 35kV side of the main transformer adopts single busbar wiring,Each transformer is equipped with a section of 35kV bus on the 35kV side,35kV bus connected to the fan incoming line、Reactive power compensation、Energy storage、Station electricity, etc.;Each main transformer low-voltage side is equipped with one set of ±45MvarSVG reactive power compensation device for each 35kV busbar。

2.1.2 Overview of the 200,000-kilowatt wind power project in Jingtai Area F

The installed capacity of this project is 200MW,Connected to the Shandong Development Investment (Jingtai) Zone A 400,000 kilowatt wind power project booster station through 35kV collector lines,50MW of which is connected to the 35kV side of the main transformer of the wind farm in Area A,The remaining 150MW is connected to a 150MVA three-phase three-winding (the third winding is a balanced winding) power transformer installed in the booster station in Zone A of this project。The main transformer is connected to the 110kV bus of the booster station at a 110kV main transformer incoming line interval,Sent out uniformly from the Zone A wind farm project。Consider the expansion cost and cost sharing of the booster station in this project。

2.1.3 Overview of 200,000 kilowatt photovoltaic projects in Lucheng, District B, Jingtai

The total installed capacity of this project is 200,000 kilowatts。110kV booster station installs two 100MVA three-phase three-winding power transformers。This station is connected to Seabetthe 110kV side of seabet ioJingtai South 330kV booster station with one 110kV line,Through the main transformer of Jingtai South 330kV booster station, it is boosted and then connected to the power grid。110kV electrical main wiring: adopting the form of "one station and two stations",Set two 110kV power distribution devices with single busbar connections in the booster station;The 35kV side of the main transformer adopts single busbar wiring,Each transformer is equipped with a section of 35kV bus on the 35kV side,35kV bus connected to the fan incoming line、Reactive power compensation、Energy storage、Station electricity, etc.;Each main transformer low-voltage side is equipped with one set of ±24MvarSVG reactive power compensation device for each 35kV busbar。

2.1.4 330kV substation project

Shandong Development Investment (Jingtai) 330kV substation in Fangcao Village, Luyang Town plans to connect to new energy with an installed capacity of about 1200MW。This project plans to install two 360MVA transformers and two 240MVA transformers at the end of the project,330kV final outgoing line 2 times,110kV side final outgoing line 8 times。No outlet on the 35kV side,Only reactive power compensation and station power supply equipment。Based on site location and system planning,330kV、110kV all use overhead outlets。

The construction scale of this phase: installation of 2 360MVA transformers and 1 240MVA transformer,330kV outgoing line once,110kV outlet 4 times,No outlet on the 35kV side,Only reactive power compensation and station power supply equipment。Among them,110kV only includes spacer equipment,excluding outgoing lines。

2.2 Bidding scope and division of bid sections (packages).

2.2.1 Jingtai Area A 400,000 kilowatt wind power project

Project equipment supervision service bidding scope,Including but not limited to: 72 hosts involved in the project, single machine capacity 5.56MW (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Prefabricated cabin for primary/secondary equipment、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical seabet sports bettingTerms)seabet online sports betting、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.2 Jingtai F Zone 200,000 kilowatt wind power project

Project equipment supervision service bidding scope,Including but not limited to: 36 hosts involved in the project, single machine capacity 5.56MW (including engine room、wheel hub、Blade)、Tower、Anchor、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Prefabricated cabin for primary/secondary equipment、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical seabet sports bettingTerms)seabet online sports betting、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.3 Jingtai B District Lucheng and other 200,000 kilowatt photovoltaic projects

Project equipment supervision service bidding scope,Including but not limited to: photovoltaic modules involved in the project、Inverter、Main transformer、Box transformer、GIS combination electrical appliances、Switch cabinet、SVG reactive power compensation device、Prefabricated cabin for primary/secondary equipment、35kV switch cabinet、Key point manufacturing supervision of power cables and other equipment and materials (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical seabet sports bettingTerms)seabet online sports betting、Witness,Mainly including material preparation、put into production、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

2.2.4 330kV substation project and 330kV overhead lines

Project equipment supervision service bidding scope,Including but not limited to: main transformers involved in the project (including station transformers and other transformers)、GIS combination electrical appliances、SVG reactive power compensation device、Prefabricated cabin for primary/secondary equipment、Key point manufacturing supervision of equipment and materials such as cables (for details, please refer to the manufacturing supervision outline in Annex 2 of Chapter 6 Technical Specifications and Technical seabet sports bettingTerms)seabet online sports betting、Witness,Mainly including material preparation、Processing、Test、Inspection、Key nodes from assembly to factory,At the same time, provide actual production progress information to the owner。

This project is divided into one bid section, and consortium bids are not accepted.

3. Bidder qualification requirements

3.1、The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided;

3.2、The bidder must have the Class A wind power qualification issued by the China Supervision Association and have the CMA qualification。

3.3、The bidder shall have at least 5 project director engineers and professional equipment supervision engineers for each project,All are in-service status,Provide social security certificate for the past three months。The project director engineer must have similar actual supervision experience for no less than 5 years,Participated in no less than 3 similar projects at the same time;

3.4、Financial requirements: Financial statements issued by an audit agency or certified public accounting firm from 2020 to 2022 are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided),If the company has been established for less than three years,Unable to provide the 2020-2022 audit report or financial statements,Financial statements issued by an auditing agency or certified public accounting firm since the company’s establishment are required;(need to include balance sheet、Cash flow statement、Copy of income statement,Missing any item is considered not provided);

3.5、Reputation requirements: The bidder’s social credibility self-examination commitment from January 1, 2020 to the present (stamped with the company’s official seal、Customized format);Bidders need to provide the "China Execution Information Disclosure Network" website (http://zxgk when registering.court.gov.cn/shixin/) Screenshot of the webpage to check whether this unit is a person subject to execution for dishonesty。The tenderer shall impose restrictions on dishonest persons who are restricted from participating in bidding activities for engineering construction projects in accordance with laws and regulations。

3.6、Performance requirements: January 1, 2020 to present (subject to the time of contract signing),The bidder must provide at least 3 or more projects with similar performance seabet betting platformin supervising the manufacturing of 100MW wind power equipment,And provide at least 2 or more projects with similar performance in seabet sports betting50MW photovoltaic project equipment supervision (Note: wind power contract performance must include at least wind power host、Blade、Supervision of manufacturing of tower type 3 equipment;PV contract performance includes at least modules、Bracket、Manufacturing supervision of inverter type 3 equipment),And each contract should list the execution performance list (specific to the project name、Equipment type and quantity),Performance contract certification documents must include the contract cover、Main work content or technical agreement、Contract signature page、Signing time,Performance certification documents that are not provided in accordance with the above requirements will be deemed invalid。

4. Obtaining bidding documents

Acquisition time: from 09:00 on August 10, 2023 to 17:00 on August 14, 2023

How to obtain:

1、How to participate in the bidding (registration): Bidding units need to register on the Sunshine Procurement Service Platform,Search for the project after registration and register,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (just register and register,No need to apply for CA lock)。 2、Materials required to obtain bidding documents: ①Business license、Qualification certificate ② Authorization letter of the legal representative and ID card of the authorized person ③ Relevant certification materials for the project director engineer and various professional equipment supervision engineers ④ Financial status statement ⑤ Self-examination commitment of the bidder's social credibility ⑥ "China Implementation Information Disclosure "Net" website (http://zxgk.court.gov.cn/shixin/) Web page screenshot ⑦ performance certification materials ⑧ cost remittance voucher ⑨ bidder information registration form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。The bidder shall send the scanned copy (pdf format) of the above information (in order of serial number) with official seal to sdzb910@163.com,After successful sending, call (15726160669) to notify the agency for review and confirmation。 3、Tender document price: 500.00 yuan/serving,No refund upon sale (only business-to-business transfers accepted,Personal transfers are not accepted,Please note the item number when remitting)。  Tender document expense account: Company name: Shandong Tendering Co., Ltd.   Account opening bank: Bank of China Jinan Wenhua Road Branch  Bank account number: 227305483177   Line number: 104451038330  4、Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents

Submission deadline: 09:30 on August 31, 2023

Submission method and address: Submission of paper documents in the conference room, 2nd floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Submission deadline: 09:30 on August 31, 2023

Submission method: Conference Room, 2nd Floor, Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement and Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

Tenderer: Baiyin Jingtai Longlu Development New Energy Co., Ltd.

Tenderer’s address: No. 21, Beitan Village, Xiquan Town, Jingtai County, Baiyin City, Gansu Province

Contact person of the tenderer: Mr. Zhang

Tenderer’s contact number: 17616758749

Tendering agency: Shandong Tendering Co., Ltd.

Address: No. 13, Wenhua West Road, Lixia District, Jinan City

Contact: Li Min

Tel: 15726160669

Email: sdzb910@163.com





Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share