1.Tender conditions

The name of this bidding project is: Baiyin Jingtai Development New Energy Co., Ltd. (Jingtai) District D 350,000 kilowatt photovoltaic project construction general contracting (PC) project,The tenderer is Baiyin Jingtai Development New Energy Co., Ltd.,The project unit is: Baiyin Jingtai Development New Energy Co., Ltd.,The source of funds is self-raised by the enterprise。The bidding agency is Shandong Tendering Co., Ltd.。This project has met the bidding conditions,Now open bidding for this project。

2. Project Overview and Bidding Scope

2.1 Project Overview、Bid section (package) division and bidding scope:

2.1.1 Baiyin Jingtai Development New Energy Co., Ltd. Jingtai County D District plans to build a total of 350,000 kilowatt photovoltaic projects,Divided into three phases: Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatts, first phase, 150,000 kilowatts photovoltaic project、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase II 100,000 kilowatt photovoltaic project、Baiyin Jingtai Development New Energy Co., Ltd. Jingtai D Zone 350,000 kilowatt phase III 100,000 kilowatt photovoltaic project。The third phase of the project will build a 110kV booster station,Planning and construction of 2×180MVA main transformer (330/35kV),The newly built 2-circuit 110kV line is connected to the 110kV side of Jingtai North 330kV substation,Length of line is approximately 2×6.93km,Using 2×300mm2 cross-section wire。

2.1.2 Bid segment (package) division:

This bidding is divided into three bidding sections.

2.png

2.1.3 Bidding Scope

First bid section: Jingtai D area 350,000 kilowatt phase I 150,000 kilowatt photovoltaic project photovoltaic area construction general contracting (PC) project scope,Mainly including but not limited to:

1. Equipment and material procurement:

The scope of equipment and material procurement includes but is not limited to the following:

1.Provide all equipment that meets the installed capacity of this project,Including but not limited to: all equipment except A supply equipment and A control equipment,Including but not limited to photovoltaic brackets、PV module DC cable、String inverter、Box-type low-voltage cables (including testing) and cable accessories,And corresponding spare parts、Special tools、Instrumentation,And the production operation and maintenance tools necessary for equipment operation and maintenance、Safety equipment and emergency supplies (see attachments for details), all software and hardware equipment and corresponding technical services and fire protection、Security facilities。Purchased by the bidder from the tenderer’s recommended list,Included into total bid price。Equipment procurement should be strictly carried out in accordance with the technical specifications and recommendation list provided by the tenderer。All equipment and services must meet the technical requirements of the smart power station in the bidding documents。Specific requirements shall be implemented in accordance with the technical specifications of the design institute。The equipment purchased by the bidder must ensure that it meets the requirements of local power grid access。

2. Supply equipment: photovoltaic module equipment

3.A control equipment: photovoltaic bracket、String inverter、Cables, etc.

4.Including the production schedule of the above equipment、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard)、Acceptance of goods、Warehousing, storage, etc. (The equipment purchased by the contractor is also entrusted to the contractor for production scheduling、Expediting goods、Receive goods、Keeping、Full process control including bad luck),The contractor is responsible for equipment relocation and storage site coordination and expenses caused by any reason。

5.The tenderer arranges for the supervision of the equipment supplied by A,The bidder’s supervision does not relieve the bidder from its responsibility for the supervision and quality control of the purchased equipment。The bidder arranges the supervision and inspection of equipment other than A control equipment。Out of consideration for procurement quality,The tenderer has the right to purchase equipment within the scope of the tender、Exercise supervision and decision-making rights over the process and results of service and professional engineering procurement。The tenderer has the right to control all equipment within the bidding scope based on the progress of the project。

6.All supplies within the bidding scope of this section、Transportation of A control equipment、Loading and unloading、Installation and Debugging、Keeping、The bidder shall be responsible for the second bad luck。

7.Please see the attachment to the bidding document for the recommended list of equipment procurement。Construction unit before equipment procurement、The supervision unit will review the construction drawings and technical specifications,Only after the review is correct, the general contractor can proceed with bidding, procurement and construction。The bidder must be comprehensive、Comprehensive consideration of quotation。

8.Bidders should consider the period and before and after major national, provincial and municipal events,Major equipment production and transportation,The bidder must make the lead time for large equipment transportation according to the overall construction period requirements of the bidder。

9.Above equipment、Material、Spare parts and other technical services、Performance testing and provision of related technical information, etc.。

II. Engineering Construction

Civil construction that meets the grid-connected operation and acceptance of the project、Electrical installation、Debug、Grid connection、Trial run,Acceptance and defect elimination at each stage of the project,Water Conservation、Environmental protection、Safety、Firefighting、Occupational health “Three Simultaneities” and other related work,Special acceptance of each project,Personnel training and final delivery operations,Quality warranty service during the warranty period,Cooperate with project settlement、Completion final accounts audit and all related work。Specifically include but are not limited to the following:

1.Civil works: including site leveling and earthworks、Stent foundation project、Bracket installation project、Box transformer inverter basic project、Water Conservation and Greening Project、field fence project、Gate project、Cable trench project、Ancillary facilities engineering and other related work。Including temporary construction and demolition、Repairing of roads damaged by construction,Vegetation restoration in the construction area,On-site production and living communication line and water and power supply construction (surrounding ecological environment protection during the process、Protection and management of domestic water sources、Water Conservation、Environmental protection measures guarantee),Finished Product Protection,Reclamation project (reclamation deposit shall be paid by the contractor、Return),Environmental protection projects and soil and water conservation projects (meet the relevant requirements for approval and acceptance)。

2.Electrical installation project: installation of all equipment within the bidding scope of this bidding section、Debug,Including but not limited to component installation engineering、Inverter installation project、Cable construction on the low voltage side of box transformer、Photovoltaic area grounding system project、Debugging and unit testing of video surveillance system and other equipment、Overall system debugging、Complete system performance test after grid connection、Power quality detection、All equipment signage projects and all electrical equipment installation related work。

3.According to the quality acceptance management system of the group and Baiyin Jingtai Development New Energy Co., Ltd.,Complete key node acceptance、Phase acceptance and defect elimination work。

4. Handover, personnel training, and maintenance work within the warranty period.

5.Complete archives that meet the requirements of the construction unit’s archives management system,And complete the filing and transfer as required on schedule。

6.Others not specified but belong to the construction of this project、Trial run、Acceptance、Transfer、Warranty service during the warranty period、Related work such as settlement auditing。All projects before project handover、The equipment will be kept and cared for by the winning bidder,Any damage、If lost, the winning bidder will be responsible for repair or replacement,And bear the corresponding expenses。

7.Projects must refer to the company's "Safety Visualization Standard Management Manual for New Energy Power Generation Enterprises"、"Wind Farm seabet appSafety and Civilized Construction Manual"、"Technical Requirements for Quality Control of Photovoltaic Power Generation Projects"、Photovoltaic power station construction quality inspection and acceptance regulations、 Provisions on the acceptance management of photovoltaic power station projects of superior companies、Related documents about contractor management and other matters between our company and its superior companies,Meet the relevant requirements of the above documents,And related fees are included in the total price。

3. Procedures (including but not limited to the following):

1.Responsible for the forest land occupied by the project construction、Land、Grassland、Demolition、Relocation of above-ground and underground lines、Cemetery、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation、Forest grassland vegetation restoration fees, etc.)、Coordination、Reclamation、Review、Acceptance、All procedures involved in surface attachments and payment of related fees (except for the land transfer fee for land acquisition in the photovoltaic area、Farmland occupation tax and land use tax as well as long-term land rental fees for photovoltaic fields shall be paid by the contractor)。Responsible for handling procedures for highway openings and crossings (crossings) and restoring facilities after construction,And bear related expenses。

2.Meet the procedures for the entire process from the start of project construction to grid-connected operation,Including but not limited to: environmental protection construction、Monitoring、Review and Acceptance;Soil and water conservation construction、Monitoring、Review and Acceptance;Safe and civilized facilities、Implementation of occupational disease protection facilities、Review and Acceptance。

3.All civil work on site、Local coordination,Civil、Related expenses incurred in processing local relations。The current on-site land can meet the layout and construction of 125MW photovoltaic modules on the photovoltaic AC side,The land for subsequent 25MW photovoltaic module construction must be determined by the contractor of the first bidding section,If the remaining 25MW construction land cannot be confirmed within two months after receiving the bid winning notice,The contractor has the right to reorganize and re-contract the unimplemented photovoltaic capacity,Cancel the corresponding contract。

4.Be responsible for handling the above procedures (including costs related to temporary land use、Report preparation fee、Assessment fee、Conference fees, etc.)、Acceptance、All expenses incurred in the process of handling civil relations (land reclamation deposit、Compensation costs for the use of woodland and grassland shall be borne by the bidder)。If the construction period is delayed due to the bidder's failure to complete the required relevant procedures in time、Criminal、All administrative penalties and fines shall be borne by the bidder。

5.The bidder follows environmental protection、Requirements for Soil and Water Conservation Approval Plan,Responsible for the repair of all environmental impacts such as soil erosion or vegetation damage caused during the construction process,And complete land reclamation and vegetation restoration work and meet environmental protection requirements、Soil and water conservation acceptance requirements,Implement the three simultaneous tasks of environmental protection, water conservation and water conservation,The required costs should be fully included in the bid quotation。In principle, fixed unit price bidding can be done using the bill of quantities,Settlement will be based on the actual engineering volume;Requires an assessment of the current status of the site before starting work,If the contractor fails to perform construction in accordance with the requirements, causing damage to water, soil and vegetation beyond the project itself,The resulting costs shall be borne by the contractor and the contracting party has the right to impose penalties,The contractor needs to bear the penalties, fines and other expenses incurred by the local government against the owner。Responsible for handling all construction and safety risks related to the project、Third party liability insurance;Responsible for project handover、Archive data acceptance、Project completion acceptance and other related work,And all work related to general contracting projects。

6.Because this project is divided into three bidding sections,for fast、Perform the above procedures efficiently,When the entire project needs to be uniformly oriented to the government or regulatory agency (safety supervision、Quality Supervision) When completing procedures,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project;When the entire project needs to go through the grid connection procedures for the power grid,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project。Relevant procedure fees shall be borne by the contractor of the third bid section。When the procedures for each bid section do not involve other bid sections or can be handled independently,Do it yourself and bear the cost。For details, please refer to the quotation list and attachments to the bidding documents: Principles for Division of Project Procedures。

Second bid section: Jingtai D area 350,000 kilowatt phase II 100,000 kilowatt photovoltaic project、Jingtai D District 350,000 kilowatt phase III 100,000 kilowatt photovoltaic project photovoltaic area construction general contracting (PC) project scope,Mainly including but not limited to:

1. Equipment and material procurement:

The scope of equipment and material procurement includes but is not limited to the following:

1.Provide all equipment that meets the installed capacity of this project,Including but not limited to: all equipment except A supply equipment and A control equipment,Including but not limited to photovoltaic brackets、PV module DC cable、String inverter、Box-type low-voltage cables (including testing) and cable accessories,And corresponding spare parts、Special tools、Instrumentation,And the production operation and maintenance tools necessary for equipment operation and maintenance、Safety equipment and emergency supplies (see attachments for details), all software and hardware equipment and corresponding technical services and fire protection、Security facilities。Purchased by the bidder from the tenderer’s recommended list,Included into total bid price。Equipment procurement should be strictly carried out in accordance with the technical specifications and recommendation list provided by the tenderer。All equipment and services must meet the technical requirements of the smart power station in the bidding documents。Specific requirements shall be implemented in accordance with the technical specifications of the design institute。The equipment purchased by the bidder must ensure that it meets the requirements of local power grid access。

2. Supply equipment: photovoltaic module equipment

3.A control equipment: photovoltaic bracket、String inverter、Cables, etc.

4.Including the production schedule of the above equipment、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard)、Acceptance of goods、Warehousing, storage, etc. (The equipment purchased by the contractor is also entrusted to the contractor for production scheduling、Expediting goods、Receive goods、Keeping、Full process control including bad luck),The contractor is responsible for equipment relocation and storage site coordination and expenses caused by any reason。

5.The tenderer arranges for the supervision of the equipment supplied by A,The bidder’s supervision does not relieve the bidder from its responsibility for the supervision and quality control of the purchased equipment。The bidder arranges the supervision and inspection of equipment other than A control equipment。Out of consideration for procurement quality,The tenderer has the right to purchase equipment within the scope of the tender、Exercise supervision and decision-making rights over the process and results of service and professional engineering procurement。The tenderer has the right to control all equipment within the bidding scope based on the progress of the project。

6.All supplies within the bidding scope of this section、Transportation of A control equipment、Loading and unloading、Installation and Debugging、Keeping、The bidder shall be responsible for the second bad luck。

7.Please see the attachment to the bidding document for the recommended list of equipment procurement。Construction unit before equipment procurement、The supervision unit will review the construction drawings and technical specifications,Only after the review is correct, the general contractor can proceed with bidding, procurement and construction。The bidder must be comprehensive、Comprehensive consideration of quotation。

8.Bidders should consider the period and before and after major national, provincial and municipal events,Major equipment production and transportation,The bidder must make the lead time for large equipment transportation according to the overall construction period requirements of the bidder。

9.Above equipment、Material、Spare parts and other technical services、Performance testing and provision of related technical information, etc.。

II. Engineering Construction

Civil construction that meets the grid-connected operation and acceptance of the project、Electrical installation、Debug、Grid connection、Trial run,Acceptance and defect elimination at each stage of the project,Water Conservation、Environmental protection、Safety、Firefighting、Occupational health “Three Simultaneities” and other related work,Special acceptance of each project,Personnel training and final delivery operations,Quality warranty service during the warranty period,Cooperate with project settlement、Completion final accounts audit and all related work。Specifically include but are not limited to the following:

1.Civil works: including site leveling and earthworks、Stent foundation project、Bracket installation project、Box transformer inverter basic project、Water Conservation and Greening Project、field fence project、Gate project、Cable trench project、Ancillary facilities engineering and other related work。Including temporary construction and demolition、Repairing of roads damaged by construction,Vegetation restoration in the construction area,On-site production and living communication line and water and power supply construction (surrounding ecological environment protection during the process、Protection and management of domestic water sources、Water Conservation、Environmental protection measures guarantee),Finished Product Protection,Reclamation project (reclamation deposit shall be paid by the contractor、Return),Environmental protection projects and soil and water conservation projects (meet the relevant requirements for approval and acceptance)。

2.Electrical installation project: installation of all equipment within the bidding scope of this bidding section、Debug,Including but not limited to component installation engineering、Inverter installation project、Cable construction on the low voltage side of box transformer、Photovoltaic area grounding system project、Debugging and unit testing of video surveillance system and other equipment、Overall system debugging、Complete system performance test after grid connection、Power quality detection、All equipment signage projects and all electrical equipment installation related work。

3.According to the quality acceptance management system of the group and Baiyin Jingtai Development New Energy Co., Ltd.,Complete key node acceptance、Phase acceptance and defect elimination work。

4. Handover, personnel training, and maintenance work within the warranty period.

5.Complete archives that meet the requirements of the construction unit’s archives management system,And complete the filing and transfer as required on schedule。

6.Others not specified but belong to the construction of this project、Trial run、Acceptance、Transfer、Warranty service during the warranty period、Related work such as settlement auditing。All projects before project handover、The equipment will be kept and cared for by the winning bidder,Any damage、If lost, the winning bidder will be responsible for repair or replacement,And bear the corresponding expenses。

7.Projects must refer to the company's "Safety Visualization Standard Management Manual for New Energy Power Generation Enterprises"、"Wind Farm seabet appSafety and Civilized Construction Manual"、"Technical Requirements for Quality Control of Photovoltaic Power Generation Projects"、Photovoltaic power station construction quality inspection and acceptance regulations、 Provisions on the acceptance management of photovoltaic power station projects of superior companies、Related documents about contractor management and other matters between our company and its superior companies,Meet the relevant requirements of the above documents,And related fees are included in the total price。

3. Procedures (including but not limited to the following):

1.Responsible for the forest land occupied by the project construction、Land、Grassland、Demolition、Relocation of above-ground and underground lines、Cemetery、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation、Forest grassland vegetation restoration fees, etc.)、Coordination、Reclamation、Review、Acceptance、All procedures involved in surface attachments and payment of related fees (except for the land transfer fee for land acquisition in the photovoltaic area、Farmland occupation tax and land use tax as well as long-term land rental fees for photovoltaic fields shall be paid by the contractor)。Responsible for handling procedures for highway openings and crossings (crossings) and restoring facilities after construction,And bear related expenses。

2.Meet the procedures for the entire process from the start of project construction to grid-connected operation,Including but not limited to: environmental protection construction、Monitoring、Review and Acceptance;Soil and water conservation construction、Monitoring、Review and Acceptance;Safe and civilized facilities、Implementation of occupational disease protection facilities、Review and Acceptance。

3.All civil work on site、Local coordination,Civil、Related expenses incurred in processing local relations。Phase II (preliminary planned land area of ​​4491 acres)、The construction land for the third phase photovoltaic project must be implemented by the contractor of the second bidding section,According to the second phase land use implementation and component layout,Organize the photovoltaic layout of the third phase project。If the contractor still fails to finalize the construction land within two months after winning the project,The contractor has the right to reorganize and re-contract the unimplemented photovoltaic capacity,Cancel the corresponding contract。

4.Be responsible for handling the above procedures (including costs related to temporary land use、Report preparation fee、Assessment fee、Conference fees, etc.)、Acceptance、All expenses incurred in the process of handling civil relations (land reclamation deposit shall be borne by the bidder)。If the construction period is delayed due to the bidder's failure to complete the required relevant procedures in time、Criminal、All administrative penalties and fines shall be borne by the bidder。

5.The bidder follows environmental protection、Requirements for Soil and Water Conservation Approval Plan,Responsible for the repair of all environmental impacts such as soil erosion or vegetation damage caused during the construction process,And complete land reclamation and vegetation restoration work and meet environmental protection requirements、Soil and water conservation acceptance requirements,Implement the three simultaneous tasks of environmental protection, water conservation and water conservation,The required costs should be fully included in the bid quotation。In principle, fixed unit price bidding can be done using the bill of quantities,Settlement will be based on the actual engineering volume;Requires an assessment of the current status of the site before starting work,If the contractor fails to perform construction in accordance with the requirements, causing damage to water, soil and vegetation beyond the project itself,The resulting costs shall be borne by the contractor and the contracting party has the right to impose penalties,The contractor needs to bear the penalties imposed on the owner by the local government、Fine and other fees。Responsible for handling all construction and safety risks related to the project、Third party liability insurance;Responsible for project handover、Archive data acceptance、Project completion acceptance and other related work,And all work related to general contracting projects。

6.Because this project is divided into three bidding sections,for fast、Perform the above procedures efficiently,When the entire project needs to be uniformly oriented to the government or regulatory agency (safety supervision、Quality Supervision) When completing procedures,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project;When the entire project needs to go through the grid connection procedures for the power grid,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project。Relevant procedure fees shall be borne by the contractor of the third bid section。When the procedures for each bid section do not involve other bid sections or can be handled independently,Do it yourself and bear the cost。For details, please refer to the quotation list and attachments to the bidding documents: Principles for Division of Project Procedures。

Third bid section: Jingtai D area 350,000 kilowatt phase I 150,000 kilowatt photovoltaic project、Jingtai D District 350,000 kilowatt phase II 100,000 kilowatt photovoltaic project、Jingtai D District 350,000 kilowatt phase III 100,000 kilowatt photovoltaic project collection line、Supported 110kV booster station、Scope of the general contracting (PC) construction of the 110kV transmission line connected to the Jingtai North 330kV substation,Mainly including but not limited to:

1. Equipment and material procurement:

The scope of equipment and material procurement includes but is not limited to the following:

1.Provide all the equipment that meets the installed capacity of this project、Secondary equipment,Including but not limited to: all equipment except A supply equipment and A control equipment,Including but not limited to internal transformation in booster station、Power distribution device、Newly added related equipment at the new (expanded) construction interval of the peer station to be accessed、Switch cabinet、Boost station secondary cable、All equipment and materials of the collector line (including tower materials、Gold tools、Wire、Insulator、Attachment、Optical cable、Cables, etc.),Electrical secondary equipment (including comprehensive automation、Network-related equipment、Communication Equipment、Remote control system、Security monitoring equipment, etc.)、Material (Server、Switch、Firewall、router、Longitudinal encryption device, etc.) and corresponding spare parts、Special tools、Instrumentation,And the production operation and maintenance tools necessary for equipment operation and maintenance、Safety equipment and emergency supplies (see attachments for details) all soft、Hardware equipment and corresponding technical services and fire protection、Security facilities。Purchased by the bidder from the tenderer’s recommended list,Included into total bid price。Equipment procurement should be strictly carried out in accordance with the technical specifications and recommendation list provided by the tenderer。All equipment and services must meet the technical requirements of the smart power station in the bidding documents。Specific requirements shall be implemented in accordance with the technical specifications of the design institute。The equipment purchased by the bidder must ensure that it meets the requirements of local power grid access。

2.A supply equipment:/

3.A control equipment: main transformer、Box transformer、SVG、GIS、High voltage switch cabinet、Station use variable、Cables and some electrical secondary equipment;

4.Including the production schedule of the above equipment、Urgent delivery、Transportation、Pick up、Unlucky (including storage yard)、Acceptance of goods、Warehousing, storage, etc. (The equipment purchased by the contractor is also entrusted to the contractor for production scheduling、Expediting goods、Receive goods、Keeping、Full process control including bad luck),The contractor is responsible for equipment relocation and storage site coordination and expenses caused by any reason。

5.The tenderer arranges for the supervision of the equipment supplied by A,The bidder’s supervision does not relieve the bidder from its responsibility for the supervision and quality control of the purchased equipment。The bidder arranges the supervision and inspection of equipment other than A control equipment。Out of consideration for procurement quality,The tenderer has the right to purchase equipment within the scope of the tender、Exercise supervision and decision-making rights over the process and results of service and professional engineering procurement。The tenderer has the right to control all equipment within the bidding scope based on the progress of the project。

6.All supplies within the bidding scope of this section、Transportation of A control equipment、Loading and unloading、Installation and Debugging、Keeping、The bidder shall be responsible for the second bad luck。

7.Please see the attachment to the bidding document for the recommended list of equipment procurement。Construction unit before equipment procurement、The supervision unit will review the construction drawings and technical specifications,Only after the review is correct, the general contractor can proceed with bidding, procurement and construction。The bidder must be comprehensive、Comprehensive consideration of quotation。

8.Bidders should consider the period and before and after major national, provincial and municipal events,Major equipment production and transportation,The bidder must make the lead time for large equipment transportation according to the overall construction period requirements of the bidder。

9.Above equipment、Material、Spare parts and other technical services、Performance testing and provision of related technical information, etc.。

II. Engineering Construction

Civil construction that meets the grid-connected operation and acceptance of the project、Electrical installation、Debug、Grid connection、Trial run,Acceptance and defect elimination at each stage of the project,Water Conservation、Environmental protection、Safety、Occupational health and other “three simultaneous” and other related work,Special acceptance of each project,Personnel training and final delivery operations,Quality warranty service during the warranty period,Cooperate with settlement、Completion final accounts audit and all related work。Specifically include but are not limited to the following:

1.Civil engineering: including civil engineering of 110kV booster station、35kV collector line basics、110kV transmission line foundation and opposite end interval expansion and renovation and other civil construction related work。

2.Electrical installation project: installation of all primary and secondary equipment in the booster station、Debugging and testing;Installation of new equipment at the new (expanded) construction interval of the peer station to be accessed、Testing and Debugging;Box transformer installation project、Construction of high voltage side cables of box transformer、Box transformer and collector line grounding system engineering、Video surveillance system engineering、Collection line engineering、Comprehensive Automation System、Protection system、Metering system、Communication System Engineering、Scheduling Data Network、Remote control system、Secondary security equipment installation and commissioning、Access to the centralized control center interface and channel reservation work、Monitoring background monitoring system、All equipment debugging and unit testing、Overall system debugging、Complete system performance test after grid connection、Power quality detection、All equipment signage projects and all electrical equipment installation related work。

3.Project quality acceptance management system,Complete key node acceptance、Phase acceptance and defect elimination work。

4. Handover, personnel training, and maintenance work within the warranty period.

5.Complete archives that meet the requirements of the construction unit’s archives management system,And complete the filing and transfer as required on schedule。

6.Others not specified but belong to the construction of this project、Trial run、Acceptance、Transfer、Warranty service during the warranty period、Related work such as settlement auditing。All projects before project handover、The equipment will be kept and cared for by the winning bidder,Any damage、If lost, the winning bidder will be responsible for repair or replacement,And bear the corresponding expenses。

7.Projects must refer to the company's "Safety Visualization Standard Management Manual for New Energy Power Generation Enterprises"、"Wind Farm seabet appSafety and Civilized Construction Manual"、"Technical Requirements for Quality Control of Photovoltaic Power Generation Projects"、Photovoltaic power station construction quality inspection and acceptance regulations、 Provisions on the acceptance management of photovoltaic power station projects of superior companies、Related documents about contractor management and other matters between our company and its superior companies,Meet the relevant requirements of the above documents,And related fees are included in the total price。

3. Procedures (including but not limited to the following):

1.Responsible for the forest land occupied by the project construction、Land、Grassland、Demolition、Relocation of above-ground and underground lines、Cemetery、Compensation (such as young crop compensation、Forest land compensation、Production reduction compensation, etc.)、Coordination、Reclamation、Review、Acceptance、All procedures involved in surface attachments and payment of related fees (except for the land transfer fee for land acquisition for booster stations、Farmland occupation tax, land use tax and power collection lines、The basic long-term land lease fee for the outgoing line shall be paid by the contractor)seabet online casino。Collection circuit、Procedures for sending out lines and communication lines,Processing procedures for highway openings and crossings,Procedure for crossing power and communication lines;Processing procedures for connecting to the substation;Power grid company procedures;Classification guarantee evaluation (clear fees) and filing;Relevant procedures required to obtain the grid connection notice and other projects from the power grid company within 5 working days after grid connection (re-described)。

2.Meet the procedures for the entire process from the start of project construction to grid-connected operation,Including but not limited to: Lin、Preparation and approval of grassland plan、Preparation and approval of land procedures plan、Construction Land Approval、Land planning permit、Project Planning Permit、Engineering construction permit (if not involved,Provide corresponding supporting documents)、Real Estate Certificate;Responsible for environmental protection construction,Review and Acceptance;Soil and water conservation monitoring review and acceptance;Fire protection design filing、Construction、Acceptance;Safe and civilized facilities、Implementation of occupational disease protection facilities、Review and Acceptance;Settlement observation of booster station、Project Quality Supervision;Application from power grid company、Plan review、Complete all procedures including acceptance;Signing and coordinating power purchase and sale contracts and grid-connected dispatch agreements with the power grid and related companies;Protection setting value calculation through grid connection acceptance、Protect the approval of fixed value orders, etc.;Secondary security and grade protection evaluation、Filing procedures;Complete the project lightning protection grounding test in accordance with the requirements of the local meteorological department,Obtain approval document。

3.All civil work on site、Local coordination,Civil、Related expenses incurred in processing local relations。

4.Be responsible for handling the above procedures (including costs related to temporary land use、Report preparation fee、Assessment fee、Conference fees, etc.)、Acceptance、All expenses incurred during the handling of civil relations (land reclamation deposit shall be borne by the contractor)。If the construction period is delayed due to the bidder's failure to complete the required relevant procedures in time、Criminal、All administrative penalties and fines shall be borne by the bidder。

5.The bidder follows environmental protection、Requirements for Soil and Water Conservation Approval Plan,Responsible for the repair of all environmental impacts such as soil erosion or vegetation damage caused during the construction process,And complete land reclamation and vegetation restoration work and meet environmental protection requirements、Soil and water conservation acceptance requirements,Implement the three simultaneous tasks of environmental protection, water conservation and water conservation,The required costs should be fully included in the bid quotation。In principle, fixed unit price bidding can be done using the bill of quantities,Settlement will be based on the actual engineering volume;Requires an assessment of the current status of the site before starting work,If the contractor fails to perform construction in accordance with the requirements, causing damage to water, soil and vegetation beyond the project itself,The resulting costs shall be borne by the contractor and the contracting party has the right to impose penalties,The contractor needs to bear the penalties, fines and other expenses incurred by the local government against the owner。Responsible for handling all construction and safety risks related to the project、Third party liability insurance;Responsible for project handover、Archive data acceptance、Project completion acceptance and other related work,And all work related to general contracting projects。

6.Because this project is divided into three bidding sections,for fast、Perform the above procedures efficiently,When the entire project needs to be uniformly oriented to the government or regulatory agency (safety supervision、Quality Supervision) When completing procedures,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project;When the entire project needs to go through the grid connection procedures for the power grid,The contractor of the third bidding section will take the lead in handling the process,The contractor of the first bid section cooperates with the specific work of the first phase project,The contractor of the second bid section cooperates 2、Specific work of the third phase project。Relevant procedure fees shall be borne by the contractor of the third bid section。When the procedures for each bid section do not involve other bid sections or can be handled independently,Do it yourself and bear the cost。For details, please refer to the quotation list and attachments to the bidding documents: Principles for Division of Project Procedures。

2.1.4 Planned construction period

Planned start time: September 30, 2024,Completion time: May 30, 2025 (the specific start time shall be subject to the written notice of the tenderer,No matter when construction starts,Projects must be completed before May 30, 2025,The bidder needs to fully consider the risks of the construction period)。

Milestone node:

1) Complete the main transformer of the booster station before January 22, 2025、SVG、GIS、Basic construction of equipment such as station transformers and architecture areas;

2) Complete the pile foundation of the 125MW photovoltaic area on the AC side of the first bidding section (Phase I photovoltaic project) before January 22, 2025、Construction of box transformer foundation;

3) Complete the connection of the collection line and the transmission line before May 20, 2025、Having the conditions to be charged;

4) Complete the reverse power transmission of the booster station before May 30, 2025;

5) The first project before May 30, 2025、The second bid section has the conditions for power transmission;

The contractor has the right to evaluate the completion of the photovoltaic project milestone plan during the construction period。

2.1.5Quality requirements: Project quality standards must comply with the current national requirements for acceptance specifications and standards for project construction quality,Realizing engineering and equipment safety、Stable、Economy、Environmental protection、Long cycle operation。

2.2 Others:/

3. Bidder qualification requirements

3.1 Qualifications and performance requirements:

[1]Qualification requirements:

(1) No. 1 in this project、The bidder for the second bid section shall have the following abc qualifications;

(2) Bidders for the third bid section of this project should have the following abcd qualifications;

a.The bidder must be an independent legal person or other organization registered in accordance with the law,Valid supporting documents must be provided。

b.The bidder must have and provide a valid production safety license certificate。

c.The bidder must have a second-level or above qualification certificate for power engineering construction general contracting and a valid production safety license。

d.The bidder must have and provide effective decoration (repair)、Trial) Electric Power Facilities License Certificate,Including the installation、Test level 2 and above are required。

[2]Financial requirements:/

[3] Performance requirements: September 2019 to the bidding deadline (subject to the time of contract signing),The bidder must have at least 2 photovoltaic PC general contracting or EPC general contracting contracts of 100MWp and above,And all have been completed。The bidder must provide a contract that can prove the performance requirements of this bidding and a scanned copy of the corresponding user certificate,The scanned copy of the contract must contain at least: the seal page of the contract between the buyer and the seller、Key information page in contract signing time and performance requirements;User certificate must be stamped by the end user,It can be the acceptance certificate、Proof of use、Return visit records or other materials that can prove that the subject matter of the contract has been put into operation (if Party A is not the end user,The end-user certificate obtained by Contract Party A is also acceptable)。

[4] Reputation requirements: /

[5]Qualification requirements for project managers:

(1) The bidder must provide the proposed project manager’s valid first-class construction engineer qualification registration certificate (construction engineering or mechanical and electrical engineering major) and a valid safety production assessment certificate (Category B)。The first-class construction engineer certificate should meet the relevant requirements in the "Notice of the General Office of the Ministry of Housing and Urban-Rural Development on the Comprehensive Implementation of the Electronic Registration Certificate for First-Class Construction Engineers"。

(2) The project manager must have at least one photovoltaic PC or photovoltaic EPC project manager of 100MWp and above,The bidder must provide supporting documents to prove performance,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Project manager and unit name)。

(3) The bidder must provide proof of continuous social security payment of the proposed project manager in the unit for at least the last 12 months。

[6] Other key personnel requirements:

 Qualification requirements for deputy project manager:

(1) The bidder must provide the proposed deputy project manager’s valid first-level construction engineer qualification registration certificate (construction engineering or mechanical and electrical engineering major) and a valid safety production assessment certificate (Category B)。The first-class construction engineer certificate should meet the relevant requirements in the "Notice of the General Office of the Ministry of Housing and Urban-Rural Development on the Comprehensive Implementation of the Electronic Registration Certificate for First-Class Construction Engineers"。

(2) The deputy project manager must have at least the performance of a 50MWp and above photovoltaic PC or photovoltaic EPC project manager (or project leader or project deputy manager or project technical leader or project construction leader),The bidder must provide supporting documents to prove performance,It can be a contract or acceptance certificate or user certificate and other stamped materials (need to include the name of the project、Project manager or project leader or project deputy manager or project technical leader or project construction leader and unit name)。

(3) The bidder must provide proof of continuous social security payment for the proposed deputy project manager in the unit for at least the last 12 months。

Technical person in charge: /

Safety person in charge: The bidder must provide a valid safety production assessment certificate (Category C) of the proposed safety person in charge。

Quality person in charge:/

[7] Other requirements: Bidders must provide a signed and sealed version of the "Letter of Commitment" that meets the requirements of the bidding documents,The content of the commitment letter shall not be modified,Those who do not sign and seal are deemed to have not made substantial response to the bidding documents,Proceed as rejected。

3.2 This project does not accept consortium bids.

4. Obtaining bidding documents

4.1 Bidding participation method: Bidding units need to register on the Sunshine Procurement Service Platform,Search for the project after registration and click to bid to participate,For the operation of the bidding unit, please refer to the "Service Center-Operation Guide" on the homepage (register and click on bidding to participate,No need to apply for CA lock)。Acquisition time: 09:00 on September 7, 2024 to 17:00 on September 12, 2024,(Beijing time,Except statutory holidays),Information required to obtain documents: ①Business license、Qualification Certificate、Safety Production License②Legal Representative Authorization Letter、The authorized person’s ID card and proof of social security paid by the authorized person in the unit for the past three months ③Performance contract and corresponding project completion certification materials ④Personnel qualification certificate and relevant certification materials required by personnel ⑤Tender document fee remittance Voucher ⑥ Bidder Information Registration Form,Customized format,Including bidder name、Contact、Contact information、Basic information such as email address。The bidder shall send a scanned copy of the original documents above (the picture must be clear and legible) (pdf format) to sdzb910@163.com,After successful sending, call (15069174047) to notify the agency for review and confirmation。(The information required for obtaining the bidding documents for this project is provided by bidding section、Three bids were not awarded at the same time) cannot be provided or are incomplete,The bidding agency will not handle the collection of bidding documents。

4.2 The price of each set of bidding documents is RMB 750 per bid section (package),No refund after sale。Tender document expense account: Company name: Shandong Tendering Co., Ltd.,Account opening bank: Bank of China Jinan Wenhua Road Branch,Bank account number: 227305483177,Line number: 104451038330。

4.3 Potential bidders who have not obtained the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding。

5. Submission of bid documents and bid opening

Submission deadline: 09:30 on September 27, 2024 (Beijing time);

Submission method: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

6. Bid opening time and place

Bid opening time: 09:30 on September 27, 2024 (Beijing time);

Bid opening location: Conference Room on the second floor of Block A, Haichen Building, No. 13 Wenhua West Road, Lixia District, Jinan City。

7. Media for publishing announcements

This bidding announcement is also on the China Bidding and Bidding Public Service Platform (http://www.cebpubservice.com/)、Shandong Procurement seabet myand Tendering Network (http://www.sdbidding.org.cn)、Sunshine Procurement Service Platform (http://www.ygcgfw.com/)、Shandong Development Investment Holding Group Co., Ltd. website (https://www.sdfztz.com/)。

8.Contact information

    Tenderer: Baiyin Jingtai Development New Energy Co., Ltd.

    Place    Address: Project Department on the third floor of the apartment behind Shuiyunchuan Hotel, Pingchuan District, Baiyin City, Gansu Province

    Mail    Editor: 730900

    Contact person: Xia Weidong

    Electricity    Word: 13099109557

    Email: 1452337444@qq.com

    Tendering agency: Shandong Tendering Co., Ltd.

    Place    Address: No. 13, Wenhua West Road, Lixia District, Jinan City

    Mail    Editor: 250002

    Contact person: Manager Liu

    Electricity    Call: 0531-81917677、15069174047

    Email: sdzb910@163.com






Shandong Development Investment Holding Group Co., Ltd.      Copyright 2019 All rights reserved      Lu ICP No. 16018610

Address: Shandong Development Building, the intersection of Haiyou Road and Xingong North Street, Lixia District, Jinan City, Shandong Province     

Share